ML20024A359
| ML20024A359 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 06/07/1983 |
| From: | Crouse R TOLEDO EDISON CO. |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| 954, NUDOCS 8306170075 | |
| Download: ML20024A359 (1) | |
Text
TOLEDO Docket No. 50-346 EDISON License No. NPF-3 Serial No. 954 June 7, 1983 Director Office of Nuclear Reactor Regulation Attention: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Director:
Enclosed are six (6) copies of Temporary Modification #T-7187 to Revision 19 of the currently approved and effective " Industrial Security Plan,"
AD 1808.00, for the Davis-Besse Nuclear Power Station. This modification incorporates those plan changes identified as "B" in your letter dated April 26, 1983 (Log Number 1273).
This revision is being submitted pursuant to 10CFR 50.54(p) as the report containing a description of the change.
Application is being made to withhold the enclosed information from public disclosure pursuant to 10CFR 73.21.
The attached enclosure contains Safeguards Information.
Very truly yours RPC:ARS:ds Enclosure cc:
Mr. James G. Keppler Regional Director Region III DB-1 NRC Resident Inspector WHEN SEPARATED FRW ENCIOSURES, HANDLE THIS DOCUMENT AS DECOhTROLI.ED l
8306170075 830607 h
hDRADOCK 05000346 SAFEGUARDS INFORMATION 3
(p PDR Juthorized disclosure may be subject g
to civil and criminal sanctions.
THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652