ML20024A275
| ML20024A275 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 05/10/1983 |
| From: | Linder F DAIRYLAND POWER COOPERATIVE |
| To: | Crutchfield D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20024A271 | List: |
| References | |
| LAC-9111, PROC-830510, NUDOCS 8306160279 | |
| Download: ML20024A275 (17) | |
Text
.
La Crosse Boiling Water Reactor
,,,, o.1 LACBWR or EMERGENCY PLAN PROCEDURE N
ORGANIZATION AND OPERATIONS DURING EMERGENCIES DA/RYLAND
- D nWM
.! -W Nb RECORD AND CONTROL OF INITIAL ISSUE, REVISIONS & PERIODIC REVIEWS PREPARED BY OR EPC OPS. SUPV.
H&S**
APPV'D & ISSUED
- ISSUE PERIODIC REVIEW BY REVIEW REVIEW REVIEW REVIEW EFFECTIVE DATE SIGNATURE DATE SIGN. DATE SIGN._DATE SIGN. DATE SIGN. DATE OF ISSUE 9
&,,/
yjg af gg\\y
', Q g Qf,,,,,,
- ), p &.SX=/.9) fl.euwe J;-7-EJ 4ht?/S:3
~y, 8306160279 830606 PDR ADOCK 05000409 F
PDR M
')
- H&S Supv. or Rad. Prot. Engineer
- LACBWR Plant Superintendent
~
P. age 0.2
' EPP-2 LAC 8WR EMERG5NCY-PLAN PROCEDURE ORGANIZATION AND OPERATIONS DURING EMERGENCIES Issue Notice No.
9 Dated 5/10/83 INSTRUCTIONS Remove Old Page No.
Insert New Page No.
Description Of and Reason'for Change Remove and discard Insert Pages 0.1, Add notificaticn of involved DPC Pages 0.1, 0.2, 7, 0.2, 7, 11, 12, 17, personnel when EAL is changed and 11, 12, 17, 18, 18, 24, 27 thru 29, change to Emergency Response 24, 27.thru 29, 35 thru 37, and 51 Capability Table.
Also 35 thru 37, and of EPP-2, Issue 9.
eliminates site evacuation during site area emergency if 51 of EPP-2, no radiological hazard is Issue 8.
involved.
The reason is that it is stupid to evacuate people into a tornado or flood if there is no hazard M where they are.
Also, adds Emergency Planning Coordinator.
PAGE SCHEDULE No.
Issue No.
Issue No.
Issue No.
Issue No.
Issue 0.1 9
13 8
27 9
41 8
55 8
0.2 9
14 8
28 9
42 8
56 8
l 1
8 15 8
29 9
43 8
57 8
[
2 8
16 8
30 8
44 8
58 8
3 8
17 9
31 8
45 8
59 8
4 8
18 9
32 8
46 8
60 8
5 8
19 8
33 8
47 8
61 8
i 6
8 20 8
34 8
48 8
62 8
7 9
21 8
35 9
49 8
63 8
8 8
22 8
36 9
50 8
64 8
9 8
23 8
37 9
51 9
65 8
10 8
24 9
38 8
52 8
66 8
l 11 9
25 8
39 8
53 8
67 8
12 0
26 8
40 8
54 8
This issue shall not become effective unless accompanied by a new cover sheet
-properly signed off in the appropriate review / approval columns.
T"#
""7W
-v-
- 7. -7
~
Page 7 EPP-2 Issue 9 4.2 UNUSUAL EVENT - (P) 4.2.1 (P) - Notify the Plant Superintendent or Alternate.
- 4.2.2 (P) - Notify Radiation Protection Management if event involves unmonitored release of radioactivity, degradation of plant effluent monitors or significant personnel contamination.
(See Appendix A).
4.2.3 (P) - Notify the USNRC via the ENS network (red phone).
4.2.4 (P) - Call up any offsite resources if necessary to assist in bringing the Emergency Plan activities to a closeout.
4.2.5 (P) - Escalate Emergency Response by evaluating EAL in EPP-1 and then turn to the appropriate EAL section of this procedure, or deactivate the Emergency Plan by turning to Section 4.6.10, " Deactivation of Emergency Plan."
If a new EAL is entered, announce the new Emergency Action Level over the plant page.
- Refer to ACP-17.1, ROR items which are indicated by "*".
WP33
Paga 11
~
EPP-2 Issue 9 4.3.15 (P) - Notify the Public Information Director listed in Appendix E thatLan alert has been declared.
The JPIC does not need to be activated at this time.
.(ERD) 4.3.16 (P) - Notify the Emergency Planning Coordinator, R. Marose.
Call:
Ext. 291 or 1-786-1966 (ERD) 4.3.17 (P) - Maintain a routine of site monitoring to ensure that conditions do not degrade and require an escalation to a higher classification or require site evacuation to i
an offsite OSC as outlined in the Emergency Plan.
4.3.18 (P) - Notify INPO of the alert status, as time permits.
l Call:
404-953-0904 (ERD) 4.3.'19 (P) - Notify American Nuclear Insurers of the alert l
status.
4 Call:
203-677-7305 (ERD) 4.3. 20 (P) -
Escalate Emergency Response by evaluating EALs in l
EPP-1 and then turn to the appropriate EAL'section or de-escalate to Unusual Event or deactivate Emergency Plan by turning tcr Section 4.6.9 11.
Inform personnel at EOF, TSC, Control Room, and OSC of new Emergency Action Level.
(ERD) i O
w.
..m%
.e 9
e.
am
Page 12 EPP-2 Issue 9
. 4.4 SITE AREA EMERGENCY (P)-- If the emergency involves a radiological hazard, start at e
Step 4.4.1.
If no radiological hazard is involved, go to Step 4.4.9.
4.4.1 (P)'- Evacuate all onsite personnel except Operational crew, oncrew Health Physics Technician, Shift Technical Advisor,'CAS Operator, and TSC personnel to either the Evacuation. Point at Genoa 1,.the lunchroom or lockerroom, or St. Charles School at the discretion of the DSS or ERD. -The Security Supervisor /Sargeant on duty will account for all onsite personnel and notify the Control Room.
The normal exit pathway through the Administrative Building will remain open_for egress.
Use the St. Charles School if radiological conditions are such that the Genoa 1 power plant is not habitable or will not be habitable, and offsite evacuation of nonessential personnel is required.
Contact school by calling Rev. Schute at 689-2646.
Personnel will be transported to St.. Charles School, if required, following approved evacuation routes, or will walk across the RR tracks at G-1, and proceed up HWY 35 to HWY 56 in Genoa and then turn right at the first street and proceed up
-the hill to St. Charles School.
(1)
Announce "A site area emergency-exists - all personnel evacuate.to' Genoa 1 (or " Lunch Room,"
" Locker Room" or "offsite to St. Charles School")
immediately."
Then push the Reactor Building-Evacuation Siren and Outside and Turbine Building Siren start and allow siren-to sound for 30 seconds.
Repeat announcement and siren two more times.
NOTE:
FOR DRILLS ONLY - Shortly before initiating the drill, contact the G-3 Shift Supervisor or Plant Superintendent at 689-2335 and the Sheriff's Office at 637-2123, and the Genoa Lock and Dam No. 8 at 689-2625 to notify them of the forth-coming drill, and the fact that the siren will sound, and what if any action is required on their part.
The first announcement should be preceded by the words, "This is a Drill," then the emergency announcement should be followed by, "This is a Drill."
(Duty Shift Supervisor or ERD)
Notify any additional personnel the Duty Shift 4.4.2 (P)
Supervisor wants to retain to go to the lunchroom OSC adjacent to the Control Room.
WP33
Paga 17 EPP-2 Issue 9
-4.4.16.a (P) - Activate the Joint News Center by contacting l
the Public Information Director listed in Appendix E.
(ERD) 4.4.16. b (P) - Notify the Emergency Planning Coordinator, R. Marose.
Call:
Ext. 291 or 1-786-1966 (ERD) 4.4.17 (P) - Once the Technical Support Center has been activated, establish liaison between the Control Room and TSC.
If the TSC/ EOF of DATA ACQUISITION System has not already shifted to its emergency mode of operation (Mode 2), manually shift it as per EPP-18.
(ERD) 4.<4.18 (P) - If the TSC is activated before the EOF, the ERD shall assume the role of Emergency Control Director from the Shift Supervisor, t
(Duty Shift Supv.)
(ERD)
(Step in Procedure (ERD)
Complete at Time of Transfer) 4.4.19 (P) - Augment the staff as needed in accordance with l
Appendix G.
4.4. 20 (P)&(E)
Once the EOF has been activated and the Cooperative Manager in overall charge of the emergency has arrived in the EOF, the Cooperative Manager will call the Acting ECD at the plant and assume the Emergency Control Director role after the EOF checklist on Page 62 is completed.
l (ERD or Duty Shift Supv.)
(ECD)
Step in the Procedure Time /Date Complete at Transfer 4.<4. 21 (P)&(E) - Once the EOF has been transferred to the Cooperative Manager, the TSC Staff and/or the Control Room will communicate with the EOF staff and provide the incident details, known radiological releases, if applicable, sample results if taken, time of event, and current status.
The telephone numbers for the EOF are listed in Appendix F.
Keep the EOF notified of changes of plant condition.
WP33
Paga 18 EPP-2.
Issue 9 4.4.22 (E) - The ECD will now contact the Joint News Center and establish communications.
(ECD) i 4.4.23 (P)&(E) - The ECD shall in conjunction with ERAD determine areas in and around the facility to be surveyed to determine the extent of radiological release and contamination (EPP-6, 7, and 8).
Any indication that dose rates or contamination rates at the site boundary downwind may exceed 1 Rem whole body or 5 Rem to the infant thyroid shall cause the ECD to escalate the emergency status to that of General Emergency and evaluate offsite doses (EPP-8).
Actual dose predictions to offsite areas shall be calculated using EPP-5 under direction of Health and Safety personnel.
These calculations should be double-checked.
Control Room personnel will furnish meteorological data if needed.
(ERAD and ECD) 4.4.24 (E) - The Vernon County Sheriff or Houston County Sheriff shall be furnished with meteorological conditions and dose projections when appropriate.
4.4.25 (E) - Notify INPO of the_ site area emergency status, as time permits.
Call:
404-953-0904 (ECD) 4.4.26 (E) - Notify American Nuclear Insurers of the Site Area Emergency status.
Call 203-677-7305 (ECD) 4.4.27 (P)&(E) - Reliefs should be obtained for emergency response personnel every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
4.4.28 (E) - Escalate Emergency Response by evaluating EALs in EPP-1 and then turn to General Emergency EAL Section 4.5, or de-escalate to Alert by turning to Section 4.6.5, or deactivate emergency plan by turning to Section 4.6.11.
Inform personnel at EOF, TSC, Control Room, and OSC of new Emergency Action Level.
(ECD)
WP33
Pags 24 EPP-2 Icsue 9 4.5.16 (P) - Activate.the Emergency Operations Facility by calling personnel listed in the EOF roster (Appendix C).
Persons Contacted:
(ECD)
(EOPD)
(ERAD)
(IRAD)
(TC)
(TC)
(ODCTS) 4.'5.17 (E)or(P) - Notify the USNRC via the ENS network (red phone).
(ECD) 4.5.18.a (E)or(P) - Activate the Joint News Center by l
contacting a person listed in Appendix E.
(ECD) 4.4.18. b (E)or(P) - Notify the Emergency Planning Coordinator, R. Marose.
Call:
Ext. 291 or 1-786-1966 (E CD) 4.5.19 (E)or(P) - The Health Physics Technician shall perform offsite exposure. estimates using the methology of EPP-5.
If the calculations result in estimated offsite dose for the duration of the release which exceed the following guidelines,.the RAD or the ERAD shall verify the calculations.- The ERAD will report the off-site dose calculation to the ECD.
4. 5. 20 (E)or(P) - The ECD shall contact the Vernon Co. Sheriff and make the recommendation for Protective Action outlined below for the zone towards which the wind is
. blowing.
If on a border, include the adjacent zone.
l PROJECTED DOSE l
(REM) TO THE 1
THE POPULATION RECOMMENDED ACTIONS (a)
COMMENTS Whole Body < 1 No planned protective Previously recom-actions (b).
State may mended protective issue an advisory to seek actions may be shelter and await further reconsidered or i
instructions.
Monitor terminated.
environmental radiation levels i
Whole Body 1 to Seek shelter as a minimum.
If contraints exist,
.< 5 Consider evacuation.
special considera-l (Emergency field teams and tion should be given workers should consider KI for evacuation of administration.)
infants, citildren, l
Thyroid 5 to Monitor environmental and pregnant women.
l"
< 25 radiation levels.
Control access.
- ~ ~ ~ ~
'WP33"
~~
~~
~~~ ~ ~
~
^
~
L
Paon 27 EPP-2 Issue 9 4.5.31 (E) - The ECD shall contact any personnel required for augmentation of available staff as he determines to be necessary.
Resources by area of expertise are listed in Section 4.7.
The ECD has DPC management approval to augment resources as needed to bring the reactor to a stable condition and minimize offsite impact.
The ECD may augment' staff and material through the EMMPD.
4.5.32 (E) - Notify American Nuclear Insurers of the general emergency status.
Call:
203-677-7305 (ECD) 4.5.33 (E) - Notify INPO of the general emergency status, as time permits.
Call:
404-953-0904 (ECD) 4.5.34 (P)&(E)
Reliefs should be obtained for emergency response personnel every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
If TSC personnel cannot be relieved, they shall monitor their radiation dose closely and spend time in the lunchroom adjacent to the Control Room to reduce their exposure if necessary.
4.5.35 (P)&(E)
Once the condition Which caused activating the Emergency Plan has been stabilized, initial recovery and re-entry of evacuated site area may be made for assessment or mitigation per Section 4.7.
4.5.36 (E)
Evaluate EALs in EPP-1, and, if appropriate, de-escalate to Site Area Emergency by turning to Section 4.6.1, or to Alert by turning to Section 4.6.5, or to Unusual Event by turning to Section 4.6.11.
Inform personnel at EOF, TSC, Control Room, and OSC of new Emergency Action Level.
i (ECD) l l
i l
WP33 i
Pago 28 EPP-2 Issue 9 4.6 DE-ESCALATION OF EMERGENCY ACTION LEVELS AND DEACTIVATION 4.6.1 (E) - When the activating condition has been resolved, the general emergency status shall be either de-escalated or terminated.
Notify Wisconsin Warning Centers 1 and 3, Vernon County Sheriff, Houston County Sheriff, Minnesota DES, and involved DPC personnel.
l*
WWCl Houston Co.
WWC3 Minn. DES Vernon Co.
DPC Personnel l
4.6.2 (E) - Notify the USNRC via the ENS network (red phone).
(ECD) 4.6.4 (E) - Notify INPO as time permits that emergency status has been reduced.
(ECD) 4.6.5 (E) - When the activating condition has been resolved, the site area emergency status shall be either de-escalated or terminated.
Notify the Vernon County Sheriff's Office, Wisconsin Warning Centers 1 and 3, Houston County Sheriff, Minnesota DES, and involved DPC personnel of the action.
WWCl Houston Co.
WWC3 Minn. DES Vernon Co.
DPC Personnel l
4.6.6 (E) - Notify the USNRC via the ENS network (red phone).
l (ECD) 4.6.7 (E) - The EOF will deactivate the Joint News Center.
(ECD) 4.6.9 (E) - Notify'INPO.
(ECD) l l
WP33
Pago 29 EPP-2 Issue 9
~
4.6.10 (E) - Deactivate the Emergency Operations Facility after providing a verbal closecut to any public officials present, and upon direction of the ECD.
(ECD) 4.6.11 (P)
Once the condition which required alert status has been resolved, close out Emergency Plan activation or de-escalate to Unusual Event Status.
If closeout is indicated:
(1)
(P)
Notify the Vernon County Sheriff's Department, Wisconsin Warning Centers 1 and 3, Houston County Sheriff, Minnesota DES, and involved DPC personnel.
WWCl Houston Co.
WWC3 Minn. DES Vernon Co.
DPC Personnel l
(2)
(P) - Notify the USNRC.
(ERD)
(3)
(P) - Remove the Standby Status of the Emergency Operations Facility if applicable.
(ERD)
(4)
(P) - Notify ANI.
(ERD)
(5)
(P) - Notify INPO.
(ERD) i I
(6)
(P) - Deactivate the OSC if applicable.
(ERD)
(7)
(P) - Deactivate the Technical Support Center.
(ERD)
WP33
i i
TABIE 4.1 f
ENERGENCY RESPWSE CAPABILITIES DURING OPERATIONAL CONDITIONS 1-3(1)
I !
I I
I I RENAINING PERSWNEL l
1 I !
l l
l l RESIDING NEAR l INITIAL RESPONSE I I !
l l
l l APPLICABUl NERGM CY l TEAM DURING SITE I l MAJOR l
l l
l RESPONSE FACILITY l AREA OR GENERAL I I EmCTIONan l
I Nossan l
l AREA l
TASKS l
POSITION I
CN-SHDT I
T' l @' I'MPAL I 2' l 6P l 'Ibtal I I i l
l I
l l
l l
l l
l' I I I
I I
I I
I I
I I
I l Plant i Mitigate i Shift Supervisor (SRD)
I 1
l 1
1 1
l 1
I l Operations l Accident l Reactor Operators l
1 l
1 l.
I I
I I
l 1 l
l Plant Operators l
2 l
l l
l l
l l
l 1 I
I I
l l
l l
l l
1 I l 1
l l
l l
l l
l 1
l I anergency I
l Shift Sugervisor l
1 l
l l
l 1
1 I
l cbntrol I
l Asiit! GeneiaT Mana5er ;
T -----
T 4 T
T 4 T *T T T T 17 TI 1 :
I l Ebwer or Alternates l
l 1
l l
l l
l l !
I I
I I
I l
l 1
l 1
I i 1
I l
1 1
I I
I l
I 1 Notificatim - l Notify Persmnel l Semrity_ Guard l
1 l
l l
l l
l l
l ccmunications l Maintain l SuFeTvisor! TeEhniEia s T - - - - -
T 4 T ~I T ;7 TYTYT 4-Tl l
l Cc=unications I and Specialists trained ini l
l l
l l
l l
j l
1 l anergency cananications l
I l
l l
l l
l l
l l
l l
l l
l l
l l
l l l
l l
1 l
l l
l l
I
-l- - - Tl@
l l
j l Radiological I Inplant, Onsite, I Health Ptysics Technicians l 1*
l l
l l
l 1 Activities l and offaite I liadiatTon erEtediEn EiigT T -----
T
~7*
l ~s* I ~12* T T T 3 l?
4 l Surveys, Radiationi Rad. Prot. Eng. Specialistl l
l l
1 l
l 1
w 1
j i !
l Protection, l Health & Safety Supervisor l l
l l
l l
l l'
l l l Personnel l Health Physics Technicians l l
l l
l l
l lH I
I mnitoring, l Environmental Engineer l
l l
l l
l 1
l$
-l$
l l j i Radiochemistry, I Sr Environmental Biologistl l
l l
l-l l
4 I
I Radiological l Air ouality Analyst i
l l
1 l
l 1
1 l
l Assessment, Dose l Director, Environ. Affairs l l
l l
l l
l l*
l l
] Assessment l
l l
l l
l l
l ly I
I I
l I
1 l
l 1
Ig
)
l a
l
- Operators are also trained to perfonn surveys and can be used for augmentation if necessary.
w
' ui There are generally 20 operations personnel not on-duty at anytime.
j
(1) ; The group of personnel listed for each function is capable of perfonning the required activities of that function.
! Individuals listed are capable of performing certain of the specified tasks as per timir qualifications.
l l
1
l TABLE 4,1 INEICENCY RESPONSE CAPABILITIES IURING OPERATIONAL CONDITIONS 1-3 1
I Ij l
i I
I RIMAINING PERSONNEL I
I lj l
l l
l RESIDING NEAR 1 INITIAL RESPONSE l l!
I I
I I APPLICABLE EMEICENCY I TEAM DURING SITE l 1 ! MAIoR I
I I
I RESPONSE FACILITY l AREA oR GENERAL I Ii EUNCPIONAL 1
1 NORMAL I
I (PIMP OR EDF) l EMERGENCY I
l AREA I
TASKS I
POSITIN l
m-SlHPP l
30' l 60' I W PAL I 30' l 60' l Total l 1!
l l
l l
l l
1 l
l l
l:
I I
I I
I I
I I
I l
l Plant System l Technical Support l Shift Technical Advisor I
1 I
I l
l l
l l
l Engineering, 1
IPlant5ujie"fiEtedidit- -
T - - - - - - T J TJ T~T4-TYTTT 3--
11 l Repair, and l
l Operations Supervisor l
l l
l l
l l
l l corrective 1
l Asst. to operations Sup.
I I
i l
l l
1 l
l Actions l
l shift Supervisors l
l l
l 1
l l
l l
l 1 Reactor Engineer l
l l
l 1
I I
I l
l l Operations Engineer i
I l
l l
l l
l l
l l Electrical Engb.eer 1
I l
l l
l l
l l
l l Mechanical Engineer l
I 1
l l
l l
l l
l l Technical Support Enginnerl l
l l
l l
1 l
l l
l omputer Analyst l
l 1
l l
l l
l 1
l l Ehgineering Specialist l
l l
l l
l l
l i
I l Director Power Production l l
l l
l l
\\
l t
l l
I Director Power Engineering l 1
l I
I l
l
.l I
I I
I I
l l
l l
l l
l.
l l
l l
l l
l l
1 1
I' I Pepair and l Operators and Shift I (See Plant l
l l
l l
l l
l l corrective l SuEervisor- ~ ~
I oner) l l
l
--l l
l l@
l l Actions 1 Tnstm Et & FIec - siip. T '-- ---
T 1H*r T15*TI- ~Y0r* ICALLED IN AS NEEoED((5 1-l l Mech. Maint. Supv.
I I
I l
l l
l lw I
l l Maintenance Mechanics l
I I
l l
l l
l' I
I I Instrunent Technicians i
I I
I l
l l
lp l
l l Electricians l
l l
l l
l l
l rn I
I I
l l
l l
l l
l lE l !
l l
l l
l l
l l
l Im l Firefighting I
l l Fire Brigade l Incal l
l l
l l
l-l I
I I per Tech.
I Support l l
l l
l lm i
I I
I Specs.
I I
I I
I I
la Ii l
I I
l l
l l
1 l
lo l
I I
I I
I I
l
- l l
Iw m
- Includes Instrunent Technicians who may be augmenting in omnunicator function.
~
TABLE 4.1 DEIGENCY RESPONSE CAPABILITIES OURING OPERATIONAL GJND1TIONS 1-3 l
l l
l l REMAINING PERSOMEL I
I I
I I
I I RESIDING NEAR I INITIAL RESPONSE l l
l l
l 1 APPLICABLE EMEIEENCY I TEAM DURING SITE I I MAJOR I
I I
I RESPONSE FACILITY l AREA OR GENEPAL I l
EUNCPIW AL I
I NORMAL i
1 (PLANT OR EDF) l EMERGENCY I
I AREA I
TASKS I
POSITIN I
W-SEHPr I
30' l 60' i 'IUPAL l 30' l 60' l 'Ibtal l i
I I
I I
I I
I I
I I
l l
l l
l l
l l
l l
l l Rescue i
I Onshift Persmnel i A n On-Shift i I
1 l
1 l-1 I Operations i
1 1 Personnel l
I I
l l
l l
l and First-Aid i I
I I
I l
l 1
l-1 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I Site Access l Security, 1 Security Ebrce I Per Security l Local l
I I
I I
I I cbntrol and i Firefighting, I
I Plan l Support i I
l l
l l
l Parsonnel l Persor.al l
1 1
l l
1 l
l l
l Accountability l Accountability l
l l
l l
l l
l l
l l
1 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
l'1btal l
I I
7 l ~ 34 lo3 l ~ s7 I
s l 7 l 12 ll l
l l
l l
l l
l l
l l
l l
l l
l l
l 1
l l
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I i
15 I
I l
l l
l l
l l
l l
I?
I I
I I
I I
I I
I I
I" 1
I I
I I
I I
I I
I I,
l l
l l
l l
l l
1 I
is l
I I
I I
I I
I I
.I Ig I
I I
I I
I I
I I
I Im I
I I
I I
I I
I I
I le i
I I
I I
I I
I I
I l'
I I
I I
I I
I I
I I
Im i
I i
l I
I I
I i
l I
13 I
I I
I I
I I
I I
I Im O
Paga 51
~
EPP-2 Issue 9 APPENDIX E.
EMERGENCY MANPOWER JOINT PUBLIC INFORMATION CENTER d
EMERGENCY CLASSIFICATION APPLICABILITY Site Area Emergency, General Emergency EMERGENCY PUBLIC INFORMATION DIRECTOR
~
HOME PHONE PLANT EXTENSION Peter Delwiche----------------( 50 7 ) 8 94 -4 299 8-316 Ronald Marose----------------------786-1966 291 Keith Kuehn------------------------788-6352 8-317 EMERGENCY TECHNICAL INFORMATION SPECIALIST Dr. Seymour J.
Ra f fe ty-------------7 88 -340 6 290 Peter J.
Bronk---------------------782-6172 289 Contact the EOF for alternate.
f a
r l
t i
l I
WP33
i r
D' /DA/RYLAND h
[k COOPERAT/VE
- PO BOX 817 2615 EAST AV SOUTH
- LA CRC SSE. W1SCONSIN S4601 (608) 788-4000 May 23, 1983 In reply, please refer to LAC-9111 DOCKET NO. 50 -40 9 Director of Nuclear Reactor Regulation ATTN:
Mr. Dennis M. Crutchfield Operating Reactors Branch #5 Division of Operating Reactors U.
S.
Nuclear Regulatory Commission Washington, D.
C.
20555
SUBJECT:
DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)
PROVISIONAL OPERATING LICENSE NO. DPR-45 EMERGENCY PLAN Gentlemen:
In accordance with the provisions of 10CFR50, Appendix E, two (2) copies of changes to the below listed implementing procedure is forwarded for your retention to maintain the implementing procedures up to date:
EPP-2, Issue 9,
" Organization and Operations During Emergencies,"
( Pages 0.1, 0. 2, 7,
11, 12, 17, 18, 24, 27 thru 29, 35 thru 37, and 51), dated 5/10 /83.
Enclosed is a copy of Form L-#59,.which should be completed and returned to LACBWR to verify receipt.
Very truly yours, l
DAIRYLAND POWER COOPERATIVE Y
Ato Frank Linder, General Manager FL:aes Enclosures CC:
Resident Inspector pC,,6 m,uu.s v_;;:' _
NI wo11