ML20023E182
| ML20023E182 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 05/11/1983 |
| From: | Russell L BALTIMORE GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20023E181 | List: |
| References | |
| ERPIP-4.1.17-01, ERPIP-4.1.17-1, NUDOCS 8306150086 | |
| Download: ML20023E182 (12) | |
Text
.~
ERPIP 4.1.17 Rev.10 SECURITY TEAM
' RESONSIBLE INDIVIDUAL :
SECURITY Team Leader CONDITION:
Ale,rt Site Emergency General Emergency
- CAUTION -
Failure to consult the Radiation Protection Director during an emergency may result in undue radiation exposure to personnel and violation of ALARA principles.
~
- NOTE -
Order of actions is not mandatory.
Initialing step completion must not delay action.
ACTION:
/
. Signature Date 1.
DISPATCH security representative to OSC.
Action Complete I
2.
INTERROGATE the personnel recall answering system (ref.
Action Complete ), complete Attachment 2.
L 3.
CALL Emergency Personnel listed on Attachment 2 (SEC &
Action Complete
/
PS first) to satisfy quota. Note: Recall quota in 60 minutes.
4.
ESTABLISH access control point on access road (s) at site Action Comolete boundary.
4 5.
At Access Control Point:
ADMIT expected emergency vehicles.
(STEP COATINUED ON NEXT PAGE)
B306150086 830601 PDR ADOCK 05000317 i
F PDR
ERP!P 4.1.17 Rev.10 STOP non-emergency vehicles.
INFORM plant workers (CategoriesA thru D) to report directly to assembly areas.
DENY access to plant visitors, unless authorized by OSC Director /SEC.
F PLANT EVACUATION is ordered, ADMIT only Category A and B personnel unless entry is authorized by OSC Director /SEC.
RECORD, on Attachment 4, name and destination of personnel granted access.
j 6.
ACCOUNT for visitors signed in at' South Processing Action Comolete Bullding.
7.
SEARCH areas for personnel.
Action Complete Visitors Center Record visitors names / addresses on Attachment 5.
Escort off-site; close center.
Farm plots / buildings Direct to Farm Demo Building.
Record names on Attachment 5.
Waterfront Direct to appropriate assembly area.
~
Camp Canoy Direct personnel to Camp gate.
Close Camp.
Warehouse, laydown areas, etc.
Direct to appropriate assembly area.
8.
UNLOCK emergency equipment in South Processing Building.
Action Complete 9.
UNLOCK Alternate Emergency Control Center.
Action Comolete
- 10. INTERROGATE security computer 25 minutes after emer-Action Complete gency is declared. DETERMINE personnel remaining in Protected Area.
2
ERPIP 4.1.17 Rev.10
- 11. REPORT accountability to SEC as soon as practicable.
Action Complete
- 12. SEARCH for missing persons.
- 13. Control Protected Area access / egress:
ADMIT ONLY catagory A and B workers unless cleared by OSC Director /SEC.
- CAUTION -
Undue delays for Dosimetry issue may endanger life or equipment.
ISSUE Dosimetry to arriving emergency workers; complete Attachment 3.
WAIVE expected emergency vehicle searches.
ESCORT emergency vehicles. Only first of several vehicles going to a single i
location requires escort.
ALLOW emergency workers leaving protected area to keep their dosimetry.
- 14. ASSIST other emergency workers whenever possible.
- 15. FdRWARD this checklist and all records related to this emergency to Supervisor-Emergency Planning Unit.
4 3 of 3
ERPIP 4.1.17 Rev. 10 ATTACHMENT 1 PAGER ANSWERING MACHINE INTERROGATION 1.
Write the digital tape counter number on Attachment 2.
2.
Press " REWIND" button.
3.
Press " PLAY" button when tape counter reaches zero.
4.
Note responses on Attachment 2.'
4.
Press "STOP" button when tape counter reaches the number noted in Step 1 above.
5.
Press "AUTOM ATIC" button.
4 9
l l
ERPIP 4.1.17,REV.10 ATTACHMENT 2 Tape Counter 3 Page 1 of 2 Tape Counter 2 DATE -
Tape Counter 1 l
WORK PAGER CALL TITLE HOME PHONE PHONE NUMBER QUOTA NAME BACK i
I
-ONE-
- 3. A. Tiernan l
Site pynw Emergency gQQ.
- R. E. Denton l
Eg
- g/l
- 3. M. Moreira Coordinator 5:3bQ elpQ g 3
- Mnc 3 s e:22 % y,?f+~s y:r g m WmJgd%;; %h S. E. Jones a
(g x
[T[2,L?%.*- -m w.m.f. j : -s W ve*yw gim:)?:yW.
Q
>W-;-
y x:
cM,
- M,d-
$b bI $.-
- [-
p%gggpgQ2;$fg'j'ggu;,3.W*,f
-ONE-L B. Russell Plant t~ M TWMSQTfp 3. T. Carroll n$ e$yh9e,Jle $, bf43hMAMC Superintendent
- fs R. P. Heibel h,Q@%yyg$Q
- :hw n. q &
&y?
~i w^' " %;
.y g.y.. 2 g m@,...%o05 :w:PW
-ONE-R. L Wenderlich L
c Plant MWagragag;p @w2p s~
w Super. tendent gp~ 3 in ggggggy g 3. R. Hill gge
- 3. M. Yoe Assistant 4
I W 4r.;; 4.. wd F. ? C. e. +: h i h h, g N 1 x
US Nr wt
-ONE-N. L Millis Radiation 2
Director
~.qgg@.;.ejvg, 3. T. Carlson Prote'ction
~
R m 4 M G B. A. Watson l_
tj s?$
- THREE -
E. T. Reimer Radiological essment L 3. Smialek l
airector f
P. T. Crinigan i
A. G. Miranda K. 3. Nietman I
i Technical
-ONE-D. W. Latham Support Center 3. A. Mihalcik Director M. 3. Micrnickl Core j
Engineers
-ONE-M. E. Bowman 3. P. Steciman Operational
-ONE-S. M. Davis Support Center C. R. Mahon Director R. T. Jennings Chemistry
-ONE-G. E. Brobst Director R. E. Sprecher
- 3. M. Bills dicated
- TW O -
A. M. Vogel Phone L L Weckbaugh Communicators G. F. Wall Elect. Engr.
NE (1) -
E. R. Bauer
[
w.
.ERPIP 4.1.17 Rev.10 ATTACHMENT 2 Tape Counter 6 Page 2 of 2 Tape Counter 5 r
f DATE:
Tape Counter 4 WORK PAGER CALL TITLE HOME PHONE.
PHONE NUMBER QUOTA NAME BACK
{fgy%QM.jfjgM-
- I' W O -
T. W. Winisms Dosimetry w w w;<~ WM M.wr.Qt*f F. B. Kinman
[*'D:y;;M@yp$h$3N
>t yi ;i?
e & % 2; I
d;l SMv s%,~7[E%k%k[.
Gate &
y
-ONE-J. Brown 945M; Access M. T.
m, W. Denham 7e3 Re-entry MEy%.R*
4 MS M. T.
y
".,'+'.',*[
- TWO -
J. Lenhart, Jr. 5. D. Koranek Q;,g, n g;%
"L
. -N%WM$., "***
% 7?JirMb.d Cn-Site dk'hEJI3SM.Q2i
- THREE -
S. G. Hutson M. T.
V G. P. Phair Et METME ' #7i.:; 2#h B. F. Sears
~7[.r--c s' ;adetC.
Nky:MT2:bj M$4W
,w. m n.C,Te.Ni-*
1 Liquid
'Wh' 9?.9 L
- TWO -
S. E. Cherry 7@9AMi. W. B. Radford Release
'T4 h b M. T.
W. D. Sewell
'qe.h.,Qf ~ @Mlk4en d%
3
/4@C, j
s s
w'
>g Off-Site
{
g
~
A M
- FIVE -
T. E. Goff M. T.
f Q Q E. H. Roach L H. St.Laurent C. H. Griffin R Wpm i
P. Wright i
i First Aid
- ONE (1) -
D. F.Harshbarger
~
ectrical Engr.
- ONE (1) -
P. G. Rizzo Mech. Engineer
-ONE-L. O. Wenger
. B. C. Rudell ERDCT j
Inst. Maint. H. E. Winter G. Q. Murray
[
R. D. Elliott j
D. P. Butler l
- 3. G. Sites 1
t 1
a l
ERDCT Elect. Maint.
- WO-J.F. Deck 3. A. Crunk!cton K. M. Riggleman R. F. Weekly l
Mech. Maint. D. A. Ensor ERDCT
-ONE-R. P. Sheranko R. W.TaUey W. L. Whitaker F. M. Bruce P. J. Buote cicated Phone Comm. A. A. Barth A. G. Bukowski K. M. Hofiman R. M. Lloyd l
E. L Campo W. E. Putman w
ERPIP 4.1.17 Rev.10
)
ATTACHMENT 3 BALTIMORE GAS & ELECTRIC COMPANY CALVERT CLIFFS NUCLEAR POWER PLANT EMERGENCY DOSIMETRY ISSUE Date:
ENTRY EXIT SRD ISSUED NAME & SOCIAL SECURITY #
READING BY:
TIME OF EMERGENCY PERSONNEL READING BY (NAME)
TIME l
f I
l l
Dosimetry removed from protected area: -(
) Yes
(
) No
A
-a t
8 ERPIP 4.1.17 Rev.10 ATTACHMENT 4 PERSONNEL ACCESS I
Date i
TIME NAME DESTINATION IN OUT o
e a
,e..
,-,..-.,yr.,
e.,--,---.---.m.-
.p,,,,-
,m,
,,w,__--
,,,-----..m_,%-..
ERPIP 4.1.17 Rev.10 ATTACHMENT 5 PERSONNEL LIST Date NAME ADDRESS i
i O
I I
n ERPIP 4.1.17 REV. 10 CALVERT CLIFFS NUCLEAR POWER PIANT EMERGENCY RESPONSE PIAN IMPLEMENTATION PROCEDURES ERPIP PAGE REV.
1 10 2
10 3
to 10
-10 10 10 10 4
i e
e
.A
+
m
,, i gf e
e
~
.t
~
e'
?-
7
..),
7 y
~
5Y
,i
,ERPIP 4.1.17 REVIEW / APPROVAL M
REVISION CHANGE REVIEWER SIG/
- SUPERVISOR POSRC PLANT SUPERINTENDENT DATE EPU SIG/DATE MTG
/DATE lb * *,,
h b
$l 9
mas #KAJA n.cr ELo 1/Un 1 6 a k.a' ire 3d,1~7 W&las 1 c-s, io o
f t
b i
t
- 2
- 5 4
g, r
.a Y
W"w....
-, r.
m *~"~ y
. s...
..r...
.e
..w
. ~ _t.....
\\>
s e.
9 May 19, 1983 U. S. NRC g o'
~
Div. of Opeiating Reactors
/
Attn: Robert A. Clark, Chief To:
Washington, DC 20555
. From:
Supervisor - Emergency Planning Emergency Response Plan Implementation Procedures attached are for inclusion in your manual. Please incorporate these changes and return this form, signed and dated.
1 i
Procedure 4.1.17 Revision 10 Complete a
Y e
TEF:sab I have incorporated the above listed Emergency Response Plan Implementation Procedures into my manual.
Signed Date X? '
iI e w ===9 gt, ur en v~
a m
t
.