Forwards Response to 830425 Request for Clarification of Allegations Re Illegal Procedures & Faulty Welds at Nuclear Power Plants
ML20023E133
Person / Time
Issue date: 05/18/1983
From: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Hatch O
SENATE, LABOR & HUMAN RESOURCES
Shared Package
ML20023E134 List:
References
NUDOCS 8306140501
Download: ML20023E133 (6)


Text

_

W rf -0

" r! AM MAY 181983 t

The Honorable Orrin G. Hatch 0

Chairman, Comittee on Labor and Human Resources United States Senate Washington, D.C.

20510

Dear Mr. Chairman:

We have reviewed your request for information which was transmitted with Barbara Newman's letter to Carlton Kammerer dated April 25, 1983.

We under-stand that this information would be helpful to clarify allegations of Gary Boring concerning illegal procedures and faulty welds at nuclear power plant sites.

The NRC staff has compiled the requested infonnation which is included in the enclosure in ouestion and answer format.

We believe that the provided answers are responsive to your request.

Sincerely, (signes William!.Dircks.

William J. Dircks Executive Director for Operations

Enclosure:

Questions / Answers Distribution:

IE Files L. Underwood IE R/F RCDeYoung HtRE-PDR (w/ incoming)

JSniezek QASIP R/F JTaylor RCPB R/F BGrimes W. Dircks RHeishman l

JRoe MPeranich l

TRehm GGeorgiev L

VStello SECY (83-1744) 01 PBrandenberg (ED0-13071) 0IA CDeliso GCunningham, ELD OCA (3)

M 1

RCPB:QASIP:IE, RCFB:QACIP:IE RCPB:QASIP:IE DD:

FP: E D 4 IE l

GGeorgiev/vjj MPeranich RHeishman BGr',es 4)WjT 05/ /83 05/ /83 05/ /83 4 // L783 5//

DIR:DEPER:IE DD:IE DIR IE" ED0 l

EJordan JS'ntezek RDeYoung WDircks 05/ /83 05/, /83 05/./83 05/ /83 i

8306140501 830518

~

PDR COMMS NRCC CORRESPONDENCE PDR L

i 4

I QUESTION 1.

First, it would be helpful to get a statement about the process the NRC follows in assuring quality control..It was pointed out that this is es'sentially within the purview of the licensee, with the NRC inspection process providing spot checks.

4 ANSWER The NRC inspection program is a planned sample inspection approach based on the premise that the licensee is responsible for ensuring the proper design, construction, testing and safe operation of the facility in accordance with technical and quality commitments included in his Safety Analysis Report (SAR).

The NRC inspection effort can be viewed as the apex of a pyramid of inspec-tions., audits and controls within the nuclear industry.

Beneath this apex are the layers of inspections, audits and controls implemented by the NRC licensee and his contractors.

NRC inspectors take a vertical slice to an appropriate depth through the inspection, audit and control pyramid.

Thereby they determine whether the licensee's Quality Assurance activities and those of his contractors are effectively ensuring compliance with NRC requirements and hence the health and safety of the public.

The NRC inspection effort.is conducted in accordance with a defined program expressed in detailed inspection procedures and is accomplished at prescribed intervals by NRC field inspectors.

The principal objective is to provide reasonable assurance that NRC licensed activities are being conducted safely and in compliance with NRC requirements. _The defined program works through

~

selective examination of systems and functions, both physical and administra-tive, which have an impact on the adequacy of the design, construction, testing and safe operation of nuclear power plants.-

OUESTION 2.

Second, on June 28, 1982, Chairman Palladino informed Senator Hatch in a letter that a change to the NRC inspection program is being issued which provides for specific identification of the person observed taking the welder qualification test.

Senator Hatch was told that resource limitations dictate that this program was to be a sampling program.

We would like to know the extent of the program as of this date.

ANSWER Our inspection procedures have always included provisions to sample welder qualification records and verify adequacy of the welder qualification proce-dures.

The revised inspection procedures emphasize the need for safeguards to preclude falsification of welder or welding operator qualifications and provide positive identification of the person making the test weldment.

The NRC construction assessment team (CAT) has reviewed 52 welder qualifications at two sites which are in addition to the routine inspections conducted by regional and resident inspectors.

These CAT inspections also' included review of radio-graphs for 158 welds (approximately 1804 individual radiographic films) which represent an additional review of welder workmanship.

00ESTION 3.

Third, from our meeting last week we learned that there are more than 100,000 welds on a_ nuclear reactor; that over 15,000 are safety-related and that there is no special screening process regarding individuals doing the welding there.

We would like a statement regarding this data, just to clarify the issue and to obviate mis-statements.

ANSWER The total number of welds involved in the construction of a nuclear power plant is estimated to be well in excess of 100,000 welds per plant.

There are more that 15,000 critical pipe welds including about 2,200 of which are safety-related butt welds. The ASME boiler and pressure vessel code,Section III, governing plant construction requires that individuals doing the welding There is no are qualified and that the welds be nondestructively examined.

special screening process of individuals doing the welding other than that required by the ASME Code.

The Code requires that the welders are qualified by test performed under the full supervision and control of the manufacturer, contractor, assembler or installer.

For butt welds in Class 1 and 2 piping of 2-inch and larger diameter, the code requires a 100% radiography examination (i.e., a volumeteric examination similar to clinical x-radiography).

The weld quality is evaluated in accordance with the acceptance criteria specified in the Code.

Since the radiography identification is keyed to weld identification on the quality control documentation which identifies the particular welder, each radiograph of a weldment is in effect a measure of the welder's workmanship in terms of skill and adherence to code required weld quality.

The completed systems are also required to be hydrostatically tested in excess of design conditions for physical strength and tightness.

QUESTION 4.

Fourth, following the gist of our conversation on Friday, there was a consensus that NRC regulations predicate a labor force assembled and working within a lawful framework.

Given the allegations of widespread selling of union cards, of ringers taking welding tests and fabrication of tests, we would like a statement from NRC regarding the implications of workers on nuclear reactors coming from an environment of labor corruption.

(

ANSWER As discussed above and as provided under NRC Regulations, 10 CFR 50, Appendix B, the licensee has the basic responsibility to insure its processes and labor l

force meet required quality standards.

However, it is recognized that the effectiveness of quality assurance activities is based on human factors and no system of procedures and controls can offer absolute protection against willful deceit. Where the NRC receives specific allegations of deceit such as those in your question, NRC pursues such allegations and, where indicated will institute formal investigation.

Arrangements are in place to request Justice Department action where evidence indicates the potential for criminal activities having occurred. However, certain aspects of the above allegations relate to quality assurance matters for which corresponding initiatives, as mentioned above, have been taken by the NRC.

In addition, the NRC resident inspector program provides an important continuing presence and periodic. surveillance of quality assurance programs at nuclear 4

plant sites.

j-4 i

c 5

l i

?

i i

-w--

+w


r w

.-4,,-nn----n-,

a.---m r,r-v ne----

,, e

-m---

w

'a~

~

e s. s. so,se=uc=r ee =rt=s arricca r eco-sis.V5,

\\h b b&

j.' g &

..- g./

~

A g--.: p..

L

.f y

.N FROM:

ACTION CONTROL OAh@

CONTROL NO.

J 3ddf#9##### S'en. Orrin G. Hatch 5/11/83 13071 (Barbara Newnan, Special Investigator )

ATE OF DOCUMENT

=" am 4/25/83 TO:

PREPARE FOR SIGNATURE ~

l Carlton Kammerer Op.

1 06m Fim m m DEXECUTIVE OsmECTOR OTHER-DESCRIPTION

@ LETTER O uEn.O O Report O OTwaR syECIAL INSTRUCTIONS OR REMARKS Q's. fm meeting re the allegations of

.s Gary Boring concerning illegal procedures p

'and' faulty welds at nucTear power I

i sites

[

,l q.%

~

f ASSIGNED TO '

OATE lesPORMATICf6 ROUT 1986 r

DeYouna. IE 4/27/83 Dircks l

- 1744

/

/ n /so J/L5X Roe t

f g-

' ' ~

Rehm

~

U SteTTo

/

l 0A b.

e w !o R""%gr.

n p 6 a to m +

nie z. e1C nLt s e M.

~

NRC FORM 232 EXECUTIVE DIRECTOR FOR OPERATIONS '

  1. O UI ""U"# I## U #

N PRINCIPAL CORRESPONDENCE CONTROL f

f i

i no. 83 1744 4n6/83 to,,,n, o,n NRC SECRETARIAT TO:

Con <.inioner 0.te XM E xec. Dir./Oper.

Gen. Counsei Cong. Liaison O soiicitor O Public Aff. irs O secretary

, inspector & Auditor O Poiiev sv.iu. tion Barbara Newman incoming:

p,,.

Special Investigator--Sen Hatch merer I

To:

aaai Coments as weil Eltequesuons re illeM**froceouresanafauityweiasat nuciear power site Prop.re upiy for sign.ture of:

Chairman Commessioner XXXC eoo, oC. CL. SQL, PA, SECY. I A. PE Date due: May 5 O sien.ture bioca omitted O Retum ori,in. of incomin,.itn resoonie For direct reply' O For ro ri.ie.etion O For inform. tion RF, OCA Rem.tk s:

For tne Commission:

bilIie

' Send three (J) copies of reply to Secy Correspondence and Recorcs Branen Rec'd Off. DO

~

DMe...... }

..h.....,, ACTION SLIP NRC FORM 82A (3-.2)

Time...... l...g sp i