Requests Work Authorization for Svc Water Pump Structure Underpinning Program & Train B Svc Water Pipe Replacement
ML20023D950
Person / Time
Site: Midland
Issue date: 05/25/1983
From: Mooney J
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20023D946 List:
References
CSC-6715, NUDOCS 8306060192
Download: ML20023D950 (1)


Text

\\

',,i, f i t& h nc,J A Consumers 1

POWBf J a a..a v l'xecutist Mansyr CD anY l

7 Midland Projets Office l

l o.a.: o m....

is4s w $rarn.ii no.e,sec=,en, ui 4sso.issti vie.cass

(

Hay 25, 1983 i

Hr J J Harrison Midland Project Section U S Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL.60137 MIDLAND Eh7.RGY CENTER GWO 7020 REMEDIAL SOILS WO U AUTHORIZATION Film: 0485.16 UFI: 43*05*21*04 Serial: CSC-6715 l

12*32 l

l Vs have co=pleted our review of the documents for the activities listed below.

Based on our review, we submit the following for work authorization:

e 862450105 - Exploratory Excavation for SIT /ILRT Duct Bank 812550010 - Normal Dike Maintenance in Q Areas e

SERVICE WATER PUMP _ STRUCTURE UNDERPINNING PROGRAM s

e 207050620 - Activate, Operate and Maintain Dewatering System l

e 202550164 - Modify Pipe Supports to Allow for Design Load 30" OHBC 34, 20 and 16.

4-- 202550163 - Remove Abandoned ytre Protection Pipeline 207050335 - Install Soldier Piles e

I TRAIN B 0F SERVICE VATER PIPE REPLACEMENT b 8

  1. - 402550550 - Remove Existing Pipe e 402550560 - Install New Pipe and Expansien Coupling Oo e 402550561 - Hydro Test New Pipe 402550508 - Perform Profiling and Quality Check on New Piping CDg g

N lM According to the NRC/CPCo Work Authorization Procedure, we request 00 authorization for the above activities.

I D gz GIO<

I CCLO V

oc0583-4103a-66-141

T h(,

hh l'bl

.~

Consumers V,.fCf Power Company Midland Project: Po Box 1963, MidleM, MI 48640. (517) 631-8650 May 13, 1983 Mr. J. J. Harrison Midland Project Section U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen, Ellyn, IL 60137 MIDLAND ENERGY CENTER GWO 7020 REMEDIAL SOILS WORK AUTHORIZATION File:

0485.16 UFI: 42*05*22*04 Serial: CSC-6704 12*32

!j E.

We have completed our review of the documents for the activities listed below.

P Based on our review, we concluded that we are ready to start the work:

SERVICE WATER PUMP STRUCTURE UNDERPINNING PROBRAM Probe for Deep Utilities Outside Elev. 610 Excavation Limits p 207050748 - Ref. Dwg. C-2031 Information to be included in the deep probing logs is:

1.

Time of penetration per each five feet.

If time exceeds thirty minutes per five feet, we will 2.

stop operation and evaluate before proceeding with the probing.

TRAIN A OF SERVICE WATER PIPE REPLACEMENT 407050400 - Shallow Probing for Phase II Ref. Dwg. C-2031 e 402550500 - Excavate Existing Pipe 402550510 - Remove Existing Pipe e 402550520 - Install New Pipe and Expansion Coupling e

Eydro Test New Pipe

  1. 402550515 - Perform Profiling and Ovality Check on New Piping 402550507 -

e According to the NRC/CPCo Work Authorization Procedure, we requert author-ization for the abov ti t es.

Donald B, Miller Site Manager DEM/ DES /klm

,[c,34 f 5.,

'/ w -l

?

m b ttach kent-A 2lk

~

F (5p'CODSumBIS POY!er 1

,jf.

j company Midland Project: Po Box 1963. Midtend, MI 48640 e (517) 6318650 May 13, 1983 Mr. J. J. Harrison Midland Project Section U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND ENERGY CENTER GWO 7020 REMEDIAL SOILS WORK AUTHORIZATION File:

0485.16 UFI:

42*05*22*04 Serial: CSC-6709 12*32 We have completed our review of the documents for the activities listed below.

Based on our review, we submit the following for work authorization:

165056375 - Excavate / Lag Zone Z2 155056375 - Excavate / Lag Zone Y2 165052057 - Drift From West Access Shaft to Pier W14 (Includes Access Pit) 165053055 - Excavate Pier W14 165054050 - Install Pier W14 155052057 - Drif t From East Access Shaf t to Pier E14 (Includes Access Pit) 155053055 - Excavate Pier E14 155054050 - Install Pier E14 165053040 - Excavate Pier W13 165054035 - Install Pier W13 155053040 - Excavate Pier E13 a

155054035 - Install Pier E13

%~

3 165055305 - Install Level C Wales,(yest side 155055305 - Install Level C Wales, Wes't Side 00 N

ohaldB.

ler Site Manager DBM/RHW/klm hyr of w: > i u n o 1

~

CORSumBIS h power o-e s me,.

  • o-Q Company
fl1g,,,

Midland Project: Po Som 1963. Midland. MI 48640. (517) 631-8650 51; i

May 9. 1983 Mr. J. J. Harrison Midland Project Section U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen, Ellyn, IL 60137 l

MIDLAND ENERGY CENTER GWO 7020 REMEDIAL SOILS WORK AUTHORIZATION File: 0485.16 UFI:

42*05*22*04 Serial: CSC-6695 12*32 We have completed our review of the documents for the activities listed below.

Based on our review, we concluded that we are ready to start the work:

I A-- 407050400 - Shallow Probing for Phase II 202550104 - SWPS - Install and Terminate Cable e

According to the NRC/CPCo Work Authorization Procedure, we request author-ization for the above activities, i

DBM/DWP/klm l

l O

h;-

httachinenth C00SumBIS l

i(

b Power

~ ' " " " ' " "

Site Manager C0mp2Ry

= ~im Midiend Project: PO Boa 1963, M6dtend, MI 48640 * (517) 631-8650 April 13, 1983 l

l l

Mr. Jay Harrison Midland Project Section US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 1

MIDLAND ENERGY CENTEP,CWO 7020 WORK AUTHORIZATION File: 0485.16 UFI:

42*05*22*04 Serial:

CSC-6662 l

l We have completed our review of the following work activities:

206050102 SWPS, Euilding Monitoring - Install Brackets /

l

(

206050101 SWPS, Building Monitoring - Install Permanent Bench /

mark covers f

206050100 SWPS, Building Monitoring - Install Extensometer I

206050106 SWPS, Building Monitoring - Install Instruments and ter-(

e l

minate instrument cable (includes Testing and Calibration)

I Per the NRC-CPCo Work Authorization Procedure, we request concurrence to proceed with the above listed activities.

t DBM/GMM/dmh I-sc [

(