Deficiency Rept 94 Re Potential Problem W/Loose Pole Piece Wedges on Four Emergency Diesel Generators.Initially Reported on 830429.Util Requested Beloit Power Sys to Review & Evaluate Circumstances to Determine Cause
ML20023D943
Person / Time
Site: Fermi 
Issue date: 05/27/1983
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, 94, EF2-63505, NUDOCS 8306060187
Download: ML20023D943 (2)


Text

- _ _ _

Donald A. Wells vem o,, e uv-( 11 31 3 7 '.-L T 2000

  • scand Avenue

[

31 3

May 27, 1983 EF2-63505 Mr. James G. Keppler, Regional Administrator Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Report of Potential 10CFR50.55(e) Item on Loose Pole Piece Wedges on Four (4) Emergency Diesel Generators (#94)

Dear Mr. Keppler:

On April 29, 1983, Detroit Edison's Mr. W. E. Miller, Jr., Supervisor-Construction Quality Assurance telephoned Mr. D. W. Hayes of NRC Region III to report on a potential problem with loose pole piece wedges on four (4) Emergeticy Diesel Generators.

An investigation into a vibration problem on emergency diesel gener-ators revealed that wedges serving the pole pieces on four (4) of the emergency diesel generators were loose.

Detroit Edison has requested that the manufacturer (Beloit Power Systems) review and evaluate the circumstances to determine the cause and establish corrective action for this deficiency. The manufacturer has also been asked to provide a detailed written procedure to secure both the wedges and pole pieces so that they will remain secure in future service. In addition, the manufacturer shall provide Detroit Edison with a written inspection procedure, including a list of tools and equipment required to allow future field inspection of these wedges to ensure tightness.

Another report on this item, either interim or final, will be sent when further information is available.

If you have questions con-cerning this matter, please contact Mr. G. M. Trahey, Assistant Director - Project Quality Assurance.

60 -l Yf Very truly yours, d[ w}{ f'

)

DAW pn

}@

8306060187 830527 MAY 311983 PDR ADDCK 05000341 0

PDR

~-

Mr. James G. Keppler, Regional Administrator May :27, 1983 EF2-63505 Page Two cc:

Mr. Richard DeYoung, Director Office Inspection and Enforcement i

U. S. Nuclear Regulatory Commission l

Washington, D.C.

20555 Mr. Bruce Little, Senior Resident Inspector U. S. Nuclear Regulatory Commission 6450 North Dixie Highway Newport, Michigan 48166 i