Text
{{#Wiki_filter:.,... Consumers Power u,, m {Q $0l Vice President - Projects, Engineering and Construction STAM ,' i W, t General Offices: 1945 West Parnell Road, Jackson, MI 49201 * (517) 788-0453 ~Nc---**** ..~.'~[.. May 13, 1983 -~ h ') i Mr. J. G. Keppler, Regional Administrator , ~j US Nuclear Regulatory Commission j---" Region III , -{~] g 799 Roosevelt Road {f;'"~*iF I LE{ l Glen Ellyn, IL 60137 MIDLAND ENERGY CENTER CWO 7020 INSPECTION REPORT NO. 50-329/83-05 (OSC) AND 50-330/83-05 (OSC) File: 0.4.2 UFI: 70*01 Serial: CSC-6701 0485.16 42*05*22*04
REFERENCE:
(1) R. F. Warnick letter to J. W. Cook, dated March 4, 1983 Inspection Report No. 50-329/83-05 (OSC) and 50-330/83-05 (OSC) This letter, including Attachment 1, provides our response to Reference 1, which transmitted the subject Inspection Report and which requested our written response to the item of noncompliance therein. Consumers Power Company By b_ James W. Cook j l Sworn and subscribed to before me on this /3 day of WM/ , 1983. 1 /7 b l 8 ft) R LY "l l l Notary Public 6[/ My commission expires,3-Y-[b JWC/ BHP /dmh l l cc: RFWarnick, NRC Region III l JJHarrison, NRC Region III RNGardner, NRC Region III RJCook, NRC Senior Resident Inspector, Midland Site RBLandsman, NRC Region III BLBurgess, NRC Resident Inspector, Midland Site M 1 g 933' 8306060055 830531 PDR ADOCK 05000329 G PDR
t bec: RCBauman, P14-314B WRBird, P14-418A FWBuckman, P14-ll3A JEBrunner, M-1079 NRC Correspondence File, P24-517 MLCurland, Midland GAHierzer, Bechtel-Midland MADietrich, Bechtel-Midland GFEwert, Midland FDField, Union Electric WJFriedrich, Midland MEGibbs, IL&B WDGreenwell, Bechtel Ann Arbor Dehorn, Midland EMHughes, Bechtel AA KEMarbaugh, Midland QA/NO BWMarguglio/DJones, JSC-220A/206B JKMeisenheimer, Midland DBMiller, Midland (3) JAMooney, P14-ll5A JARutgers,.Bechtel Ann Arbor PSteptoe, IL&B DATaggart, Midland RAWells, Midland FCWilliams, IL&B Washington REWhitaker, Midland
Serial: CSC-6701 CONSUMERS POWER COMPANY'S RESPONSE TO US NUCLEAR REGULATORY COMMISSION, RECION III INSPECTION REPORT NO. 50-329/83-05 (OSC) & 50-330/83-05 (OSC) Appendix (Notice of Violation) to Inspection Report No. 50-329/83-05 (OSC) and 50-330/83-05 (OSC) provides an item of noncompliance to 10 CFR 50, Appendix B. The NRC statement and our response are given below: NRC STATEMENT "10 CFR 50, Appendix B, Criterion V states, in part, " Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, or a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings." Bechtel Specification for Installation, Inspection and Documentation of ASME Sec-tion III Pipe Supports, Hangers and Restraints for Piping in a Nuclear Power Plant, Specification No. 7220-M-362(Q) states in section 5.13.5, "After instal-lation, the snubber assembly shall be protected from physical damage due to nor-mal construction activities by providing wooden, heavy cloth, or other similar suitable protective covers." Contrary to the above, mechanical snubbers installed in Unit 1 and 2 contain-ments were not protected from physical damage due to normal construction activi-ties by providing the required protective covers. This is a Severity Level IV violation (Supplement II)." CONSUMERS POWER COMPANY RESPONSE In accordance with this Notice of Violation, an explanation of corrective action is as follows:
- 1) Corrective Action Taken and The Results Achieved NCR M01-9-3-157 was written on May 11, 1983 by MPQAD to document the non-l conformance.
Bechtel maintenance form F-10-359 is being written to cover maintenance of all installed Q and non-Q mechanical snubbers within their jurisdiction. B&W Construction Company is preparing a Field Construction Procedure (FCP l to address maintenance of mechanical snubbers within their jurisdiction. l l
- 2) Corrective Action To Be Taken To Avoid Further Noncompliance l
A 100% initial inspection of all installed mechanical snubbers will be performed by Bechtel & B&W. Periodic inspections will be performed on a continuing basis thereafter. A Bechtel Task Force was formed on May 9, 1983 to structure, scope and eventually form a permanent storage / maintenance team. In addition to hav-ing responsibility for implementation of the storage /mainenance program, this team will perform an investigation to ensure that all types of mater-ials and equipment are adequately covered by the storage / maintenance pro-gram. Full implementation of the above will avoid further noncompliance. L
_ _ = =
- , 4.
~ l j
- 3) Full Compliance Will Be Achieved As Follows:
i Bechtel maintenance form F-10-359 will be implemented by May 23, 1983. BWCC will have their FCP issued for implementation by June 1,1983. j The 1007. initial inspection will be completed by both Bechtel and l B&WCC by July 1, 1983. The investigation of other types of materials and equipment will be complete by August 1, 1983. I l .i 1 4 i i e l I l l i l l r t +, 7-_,---_ _----.-_.._..-...-,__--~-.-_-----_...,_,_m -}}