ML20023D779
| ML20023D779 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 05/27/1983 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20023D780 | List: |
| References | |
| NUDOCS 8306030307 | |
| Download: ML20023D779 (2) | |
Text
.
MDifing AddrTs Aiaama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Abbama 33291 Telephone 205 783-6081 F. L Clayton, Jr.
0%#L"[g*"'
AlabamaPower g
the southem L4wtre system May 27, 1983 Docket No.60-348 Director, Nuclear Reactor Reguiation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Unit 1 Safety-Related Snubber Technical Specification Table Changes Gentlemen:
Based on a comprehensive review of the safety-related snubbers installed at Farley Unit 1 and a plant walkdown during the fourth refueling outage, several changes to Technical Specification Tables
' 3.7-4a, " Safety Related Hydraulic Snubbers," and 3.7-4b, " Safety Related Mechanical Snubbers," are needed.
The changes are primarily a result of an ef fort by Alabama Power Company to ensure that all snubbers assumed to be operable for safety-related seismic stress calculations are included irt the Technical Specification Tables.
Previously, only snubbers attached to safety-related piping were included in the ~ Technical Specifications; however, some snubbers attached > to nori-safety-related piping are assumed operable for saf ety-related seismic stress analysis and are therefore being added to the Technical Specification snubber tables.
Additional changes to the Technical Specification Tables are a result of recent plant design changes and typooraphical errors in the current version of Technical Speci fi cati ons.
The specific proposed changes are included as.
The snubbers that are being added to the Technical Specification Tables were included in the inspection program performed during the fourth refueling outage.
Since the Technical Specification Surveil-lance Requirements have already been completed on the snubbers that were not-previously included in the Technical Specifications, the proposed changes to the Technical Specification Tables are admini-g3}
strative in nature.
[go B306030307 830527
\\
PDR-ADOCK 05000348 d
54I ggtCU P
.e, Mr. S. A. Varga May 27,1983 U. S. Nuclear ' Regulatory Commission Page 2 Since this proposed change is administrative in nature and does not involve a change to previous safety analyses, a significant hazards consideration, as defined in 10 CFR 50.92, is not involved.
,s Alabama Power Company's Plant Operations Review Committee has reviewed and approved this proposed change to the Technical Specifications.
The Nuclear Operations Review Boar 6 will review this change at a future meeti ng.
'\\
This letter is a supplement to the Alabama Power Company letter dated Novembe'r 16, 1982.
This proposed change is designated as Class
/,
II i n accordance with 10 CFR 1,70.22 requi rements since it is admi nist rati ve i n nature.
A check for the appropriate amount of fees 1,7 was enclosed with :tne November 16, 1982 letter.
(/
in' accordance with 10 CFR 50230(c)(1)(1), three signed originals and forty. (40) addition'al copies of this proposed change a
A are enclosed.
You rs ve ry truly,
.,a M
F.L.Clayton,Jf.
/
c FLCJ r/GGY:mjh-D13 Attachment-SWORN TO AND SUBSCRIBED BEFORE ME cc:
Mr. R. A. Thomas THIS cQ'lCDAY OF Aiauf
,1983 Mr. G. F. Trowbridge d
Mr. J. P. O'Reilly-
. Mr. E. A. Reeves
,lu)Da futfe/o
- (
Mr. W. H. B radf ord,
Notary Public
_g D r. I. L. Mye rs
,t My Commission Expi res:
f'
)
l-lb - 8]
4 s
y..
t i
i i
\\
/
I
_,,