Advises That Final Testing,Balancing Adjustment & Acceptance of New Ventilation Sys Scheduled for Completion by 830630. Entire Sys Must Be Rebalanced Each Time Addl Process Component Added to Sys
ML20023D579
Person / Time
Site: 05000143, 07100143
Issue date: 05/03/1983
From: Manser W
NUCLEAR FUEL SERVICES, INC.
To: Page R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
21G-83-0058, 21G-83-58, 22264, LIC-01-01, LIC-1-1, NUDOCS 8305240051
Download: ML20023D579 (2)


Text

.

21G-83-0058 L

LIC-01-01

.8 g zuxs Nuclear Fuel Services, Inc. ERWIN, TENNESSEE 37650 (615) 743-9141

  • 83 MAY -6 P3:11 M

A4m h May 419833 3

hb5b W

B 3

U.S. Nuclear Regulatory Commission f

s fa Divi 'on of Fuel Cycle and Material Safety '6; Wash.19 ton, D.C. 20555 J

-o M

Attention:

R. G. Page, Chief 5,

0 Uranium Fuel Licensing Branch as s

q

Reference:

(1) Docket 70-143; SNM-124 Amendment #6 and USN Amendment #9 8

6 (2) Letter dated July 1,1981 to R. G. Page MAY 161983 >

nuss I

from W. C. Manser, Jr.

{-

(3) Letter dated December 3,1982 to R. G.

MAIL SECUON Page from W. C. Manser, Jr.

DOCKET CLERK (4) Letter dated March 29, 1983 to R. G.

\\

E Page from W. C. Manser, Jr.

c d

Gentlemen:

Pursuant to the telephone conversation today between our R. L. Ideker and An-Liang Soong of your staff, Nuclear Fuel Services, Inc. (NFS) advises you that: final testing, balancing adjustment and acceptance of the new ventilation systems is now scheduled for completion by June 30, 1983. This schedule change is due to:

(1) The entire system must be rebalanced each time an additional process component is added to the system.

Sections of Bldg.

302 are coming on line in late April and the laboratory and incinerator systems are to be added in May.

(2) Upset conditions in the operation of the scrubbing systems have caused excess water to reach the HEPA filters.

(3) A section of ducting associated the calciner afterburner in the Bldg. 200 Complex failed and replacement was required.

(4) Problems were encountered with the high-speed fan bases re-sulting in excessive vibration on certain units.

(5) Difficulties have been encountered in balancing the pressure differentials between the existing UFs venturi scrubber and the new main ventilation system causing water carry-over from I

that system.

h0h INFORMATION CATEGORY-V UNCLASSIFIED d

CLASSIFIED

)

0305240051 830503

'1 '

So"^

A8R LhdB L(1cNn 5

REVIE ED BY V

'DATE MAY 111983,

.c b

3;..,

'r R. G. Page May 3, 1983 Page 2

'iWet further' anticipate that more problems may arise during successive tie-ins.

We 'truwefore, submit-this status report to clarify that the April 30 start-up

.date mentioned in references (2) and (3), although technically complied with, Lhas been' delayed in practical terms because the large amount of testing, adjust-

' ment and balancing which remains to. be done.

' If you have any further questions, please call either R. L. Booth or R. L. Ideker

of.my staff.

Very truly yours,

/

/ - ;/

, ; law W. C. Manser,3)

> General. Manager,

~

'WCM:tlw 4

~

-cc:

U.S. ' Nuclear Regulato'ry Combission '~ 4 ~

Region II c

101 Marietta Street

-Atlanta, GA 30303 v.

4 A

i

,.1 y

'J h l

-1 wat.r b ' ~

f!

(DXIT0L - NO.

M N O d7 z...-..

DATFi GI'. DC.C.

h. _$

b h.mb TLCD: RCTDs U4 ew uun G' Q _

ELE 28, q,,

3.trcovcN;. V

. a....

esa

f. W Y $ A A S,

/u.gz, M-2 a AecyaakhAsw M u w n n c A sa f & $ & vk bi+_ph,49/8

  1. ast/ri uunn is P