Text
_.
- ~.
JAN 31 1993 Docket No. 99900782/82-01 Raymond Control Systems A Brunswick Company ATTN:
Mr. E. J. Flannery Vice President & General Manager 315 Kirk Road St. Charles, Illinois 60174 Gentlemen:
Thank you for your letter of November 22, 1982, in response to our letter dated November 5, 1982.
We have no further_ questions at this time concerning your response to Items A, B, C, and G of the Notice of Nonconformance.
As a result of the discussion with Mr. F. Volmer during a telephone call on January 7,1983, we have the following understandings regarding:
Item A - Notice of Violation (NOV):
Audits will be conducted to ensure that current copies of 10 CFR Part 21 and Section 206 of the Energy Reorganization Act of 1974 are posted.
Item D - Notice of Nonconformance (NON):
A tool inspection card has been initiated and reflects the acceptance.of Torque Wrench, Serial No. 2338-4.
Item F - NON:
Accuracy of Plug Gauge Set. Serial No. 1334-1 has-been verified and this information has been recorded in the affixed calibration label and tool inspection card.
Please inform us if our understandings accurately describe your intent; if different, please provide us with the correct information.
Also, the need for the following additional information was discussed:
s R&CPSyft4 SC:
BC:VPB D:V P WEFoster/rc IB es UPotapovs RLBangart 1/[/83 1/ q83 L{ /83 1/25/33 3
t
?^
8305200462 830510 PDR GA999 EMVWEST 99900782 PDR
- _ ~ _ _
a E
Raymond Control Systems-d Item B - NOV:
Please clarify your activities.
It appears that the revised j
procedure addresses nonconformances detected during the manufacturing cycle while the procedures required by 10 CFR Part 21. address deficient conditions detected after the hardware has been delivered i
to a customer; e.g., a latent defect.
Item E - NON:
Please indicate that your corrective action included, or will include, a documented assessment of electrical equipment calibration data and its impact on previously accepted hardware.,
Please provide this additional information within 25 days from the date of this letter -in order that we may complete our review in a timely manner.
t 1
Sincerely, "Oric' sal S: nod by
'-~
i U. POTAPO/o m,
Uldis Potapovs, Chief
.y Vendor" Program Branch
^