Ack Receipt of Informing NRC of Steps Taken to Correct Nonconformance Noted in QA Program Insp Rept 99900782/82-01.Requests Addl Info Per F Vollmer 830107 Telcon Re Audits,Tool Insp Card Initiation & Labeling
ML20023D406
Person / Time
Issue date: 01/31/1983
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Flannery E
BRUNSWICK CORP.
Shared Package
ML20023D392 List:
References
REF-QA-99900782 NUDOCS 8305200462
Download: ML20023D406 (2)


Text

_.

- ~.

JAN 31 1993 Docket No. 99900782/82-01 Raymond Control Systems A Brunswick Company ATTN:

Mr. E. J. Flannery Vice President & General Manager 315 Kirk Road St. Charles, Illinois 60174 Gentlemen:

Thank you for your letter of November 22, 1982, in response to our letter dated November 5, 1982.

We have no further_ questions at this time concerning your response to Items A, B, C, and G of the Notice of Nonconformance.

As a result of the discussion with Mr. F. Volmer during a telephone call on January 7,1983, we have the following understandings regarding:

Item A - Notice of Violation (NOV):

Audits will be conducted to ensure that current copies of 10 CFR Part 21 and Section 206 of the Energy Reorganization Act of 1974 are posted.

Item D - Notice of Nonconformance (NON):

A tool inspection card has been initiated and reflects the acceptance.of Torque Wrench, Serial No. 2338-4.

Item F - NON:

Accuracy of Plug Gauge Set. Serial No. 1334-1 has-been verified and this information has been recorded in the affixed calibration label and tool inspection card.

Please inform us if our understandings accurately describe your intent; if different, please provide us with the correct information.

Also, the need for the following additional information was discussed:

s R&CPSyft4 SC:

BC:VPB D:V P WEFoster/rc IB es UPotapovs RLBangart 1/[/83 1/ q83 L{ /83 1/25/33 3

t

?^

8305200462 830510 PDR GA999 EMVWEST 99900782 PDR

- _ ~ _ _

a E

Raymond Control Systems-d Item B - NOV:

Please clarify your activities.

It appears that the revised j

procedure addresses nonconformances detected during the manufacturing cycle while the procedures required by 10 CFR Part 21. address deficient conditions detected after the hardware has been delivered i

to a customer; e.g., a latent defect.

Item E - NON:

Please indicate that your corrective action included, or will include, a documented assessment of electrical equipment calibration data and its impact on previously accepted hardware.,

Please provide this additional information within 25 days from the date of this letter -in order that we may complete our review in a timely manner.

t 1

Sincerely, "Oric' sal S: nod by

'-~

i U. POTAPO/o m,

Uldis Potapovs, Chief

.y Vendor" Program Branch

^