ML20023D231
| ML20023D231 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 05/04/1983 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20023D230 | List: |
| References | |
| 50-382-82-09, 50-382-82-9, NUDOCS 8305200253 | |
| Download: ML20023D231 (1) | |
Text
,
s APPENDIX A j
NOTICE OF VIOLATION Louisiana Power & Light Company Docket:
50-382 Waterford Steam Electric Station License:
CPPR-103
- y Based on th1e results of an'NRC. investigation conducted during the period of March29, through.May 16, 1982,. and.in accordance with the NRC Enforcement Policy;(10?CFR Part 2, Appendix ~C), 47 FR 9987, dated March 9, 1982, the following violation was identified:
10 CFR Part 50, Appendix B, Criterion V, state =, in part:
Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and 3
shall be acccmplished in accordance with these instractions, procedures, or drawings.
Administrative Procedure MI-1-007, Revision 0, paragraph S.4, Metrology Lab Qualification, requires specific qualification activities to be completed, including a final signature on a qualification card by the s
Metrology Supervisor-Nuclear, in order for an individual to be qualified to perform calibration activities in the Metrology 1.ab.
Contrary to the above, an individual in the Lcuisiana Power & Light i
Company Metrology Lab performed equipment calibration without being qualified over a period of about 18 months from approximately October 1530 through April 1982.
This is a Severity Level IV Violation.
(Supplement (II) (382/8209-01)
Pursuant to the provisions of 10 CFR 2.201, Louisiana Power & Light Company is hereby required to submit to this office, within 30 days of the date of this Notice, a written statement or explanation in reply, including:
(1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved.
Consideration may be given to extending your response time for good cause shown.
4 Dated:
8305200253 830504 1
PDR ADOCK 05000392 O
.