ML20023D231

From kanterella
Jump to navigation Jump to search
Notice of Violation from Investigation on 820329-0516
ML20023D231
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/04/1983
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20023D230 List:
References
50-382-82-09, 50-382-82-9, NUDOCS 8305200253
Download: ML20023D231 (1)


Text

,

s APPENDIX A j

NOTICE OF VIOLATION Louisiana Power & Light Company Docket:

50-382 Waterford Steam Electric Station License:

CPPR-103

y Based on th1e results of an'NRC. investigation conducted during the period of March29, through.May 16, 1982,. and.in accordance with the NRC Enforcement Policy;(10?CFR Part 2, Appendix ~C), 47 FR 9987, dated March 9, 1982, the following violation was identified:

10 CFR Part 50, Appendix B, Criterion V, state =, in part:

Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and 3

shall be acccmplished in accordance with these instractions, procedures, or drawings.

Administrative Procedure MI-1-007, Revision 0, paragraph S.4, Metrology Lab Qualification, requires specific qualification activities to be completed, including a final signature on a qualification card by the s

Metrology Supervisor-Nuclear, in order for an individual to be qualified to perform calibration activities in the Metrology 1.ab.

Contrary to the above, an individual in the Lcuisiana Power & Light i

Company Metrology Lab performed equipment calibration without being qualified over a period of about 18 months from approximately October 1530 through April 1982.

This is a Severity Level IV Violation.

(Supplement (II) (382/8209-01)

Pursuant to the provisions of 10 CFR 2.201, Louisiana Power & Light Company is hereby required to submit to this office, within 30 days of the date of this Notice, a written statement or explanation in reply, including:

(1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved.

Consideration may be given to extending your response time for good cause shown.

4 Dated:

8305200253 830504 1

PDR ADOCK 05000392 O

PDR

.