Notification Re PRA Status Rept.Encl Phase I PRA Rept Not Submitted to NRC for Review.Results of Rept Insignificant to Proceeding.W/O Phase I Rept.Certificate of Svc Encl
ML20023D176
Person / Time
Site: Clinch River
Issue date: 05/18/1983
From: Edgar G, Luck W
ENERGY, DEPT. OF, PROJECT MANAGEMENT CORP.
To:
References
NUDOCS 8305190339
Download: ML20023D176 (6)


Text

. .

L- 5/18/83 UNITED STATES OF AMERICA d  %'

NUCLEAR REGULATORY COMMISSION ll $l$4 BEFORE THE -

N -4 ATOMIC SAFETY AND LICENSING B6ARD M f 5 n,, I983 5  :-

In the Matter of )

h I h2k 6

) bh

/ _, '

,9,f UNITED STATES DEPARTMENT OF ENERGY ) -

)

PROJECT MANAGEMENT CORPORATION ) Docket No. 50-537

)

TENNESSEE VALLEY AUTHORITY )

)

(Clinch River Breeder Reactor Plant) )

)

APPLICANTS' NOTIFICATION CONCERNING PRA STATUS At the May 13, 1983 Prehearing Meeting, Judge Linenberger inquired as to the status of and potential interest to the Board of the so-called " Phase 1" Probabilistic Risk Assessment (PRA) report for CRERP. (TR: 7268-70). This is to provide further notification to the Board concerning PRA status.

The Phase I report has not been submitted to the NRC Staff for review on the CRBRP docket. The undersigned counsel have been advised by the DOE CRBRP Project Office that the Phase I report reflects the following considerations:

a. The development of the Probabilistic Risk Assessment (PRA) starts with the modeling of plant design. In most cases the amount of detail included in the model is a matter of judgment at the early stages, and is later cenfirmed or adjusted by an iterative process of testing each assumption made as to its importance to the overall conclusions.

8305190339 830618 .

PDR ADOCK 05000537 G PDR

L

-2

b. The Phase I effort, based on the CRBRP design as of February 1982, had not progressed through the iterative process described above when the contractor was instructed to stop and document the work to date. The Phase I Report is the resulting document. It is only a partially complete initial effort which cannot be used to reach valid conclusions.
c. The Phase I - Phase II division was made for contractual and management reasons, not technical reasons. As the Project continued to interact with the NRC Staff on what the PRA should contain, the scope of effort expanded to the point where the Project felt it necessary to repackage the job and go out for competitive bids. This also necessitated the preparation of a document recording work done to that point in time, the Phase I Report.

The PRA for CRBRP is now scheduled for completion in late 1984. The status of the Phase I work and the " Phase II" plan for completion of the PRA is described in a May 6, 1983 report by Technology for Energy Corporation, the contractor to whom the competitive bid was awarded. The PRA will be submitted to the NRC Staff for formal review.

The Applicants believe that the results of the Phase I Report are not of significance to these proceedings.

At the same time, Applicants believe that the board should be notified concerning the status of the PRA, and make its own assessment as to significance.

l-

-3 Accordingly, the Applicants hereby serve on each member of the Board, Intervenors, and the NRC Staff, copies of the Phase I Report (consisting of a main report and seven appendices), and the above-mentioned Technology for Energy Corporation May 6, 1983 Report.

Respectfully submitted, 24 __dA

=we~s Proj ect Management Corporation ,

/ 1 l s Lil ;, .

William D. Luck Attorney for the United States Department of Energy DATED: May 18, 1983 w-- - - - - v,- - , .,-----w,w--*e-----w-- ---

-r--c-- r-----wT ---y---- . e--

E-c.

UNITED STATES OF AMERICA

. NUCLIAR REGULATORY COMMISSION BEFORE THE' ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of )

)

UNITED STATES DEPARTMENT OF ENERGY )

)

PROJECT MANAGEMENT CORPORATION ) Docket No. 50-537

)

TENNESSEE VALLEY AUTHORITY )

~

)

(Clinch River Breeder Reactor Plant) )

)

CERTIFICATE OF SERVICE Service has been effected on this date by personal delivery or first-class mail to the following:

Marshall E. Miller, Esquire Chairman-Atomic Safety & Licensing Board U. S. Nuclear Regulatory Commission ,

East-West Towers 4350 East-West Highway .

Bethesda, Maryland 20814 (2 copies by hand)

Dr. Cadet H. Hand, Jr.

Director Bodega Marine Laboratory University of California West Side Road Bodega Bay, California 94923 (Air Express)

Mr. Gustave A. Linenberger Atomic Safety & Licensing Board U. S. Nuclear Regulatory Commission East-West Towers 4350 East-West Highwoj Bethesda, Maryland 20814 (by hand) e

- - - ,q ,--- , - + , . , - - , , , y - - --- - - , - . _ - -- w

- - - - - +

W Stuart Treby, Esq.

Sherwin E. Turk, Esq.

~

Elaine I. Chan, Esq.

Geary S. Mizuno, Esq.

Office of Executive Legal Director U. S. Nuclear Regulatory Commission Maryland National Bank Building 7735 Old Georgetown Road Bethesda, Maryland 20014 (2 copies by hand)

  • Atomic Safety & Licensing Appeal Board U. S. Nuclear Regulatory Commission Washington, D. C. 20555
  • Atomic Safety & Licensing Board Panel .

U. S. Nuclear Regulatory Commission Washington, D. C. 20555

- -

  • Docketing & Service Section Office of the Secretary U. S. Nuclear Regulatory Commission Washington, D. C. 20555 (original, 3 copies, and return copy)

William M. Leech, Jr., Attorney General William B. Hubbard, Chief Deputy Attorney General Michael D. Pearigen, Assistant Attorney General State of. Tennessee Office'of the Attorney General 450 James Robertson Parkway Nashville, Tennessee 37219 ,

Oak Ridge Public Library Civic. Center Oak Ridge, Tennessee 37830 Herbert S. Sanger, Jr. , Esquire Lewis E. Wallace, Esquire W. Walter LaRoche, Esquire James F. Burger, Esquire Edward J. Vigluicci. Esquire Office of the General Counsel Tennessee Valley Authority 400 West Summit Hill Drive Knoxville, Tennessee 37902 (2 copies)

3-Dr. Thomas Cochran

. Barbara A. Finamore, Esquire Natural Resources Defense Council

'1725 Eye Street , N.W., Suite 600 Washington, D. C. 20006 ( 2 copies by hand)

Ellyn R. Weiss, Esquire Harmon & Weiss 1725 Eye Street, N.W., Suite 506 Washington, D. C. 20006 Lawson McGhee Public Library 500 West Church Street Knoxville, Tennessee 37902 William E. Lantrip, Esquire

- - Attorney for the City of Oak Ridge Municipal Building Post Office Box 1 Oak Ridge, Tennessee 37830 Leon Silverstrom, Esquire William D. Luck, Esquire U. S. Department of Energy 1000 Independence Avenue, S.W.

Room 6B-256--Forrestal Building Washington, D. C. 20585 (4 copies by hand)

Eldon V. C. Greenberg, Esquire Galloway & Greenberg '

1725 Eye Street, N.W., Suite 601 Washington, D. C. 20006 Commissioner James Cotham Tennessee Department of Economic and Community Development Andrew Jackson Building, Suite 10007 Nashville, Tennessee 37219 George L f gar Attorney for Proj ect Management Corporation DATED: May 18, 1983

  • / Denotes hand delivery to 1717 "H" Street, N.W., Washington, D.C.

8

~'

--m - - - - ~ .