ML20023D164

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Failure of GE Reactor Mode Switch to Actuate Reactor Protection Sys Channel.Initially Reported on 830407.Franklin Inst Test & Analysis Rept on 830322 Switch Failure Encl.Final Rept for Unit 2 by 831001
Date released: 02/06/2020 Download: ML20023D164


Reactor Mode Switch Failure Modes & Mechanisms, Final Rept
ML20023D165
Person / Time
Site: Susquehanna 
Issue date: 04/29/1983
From:
FRANKLIN INSTITUTE
To:
References
Download: ML20023D165 (30)
Interim Deficiency Rept Re Failure of GE Reactor Mode Switch to Actuate Reactor Protection Sys Channel.Initially Reported on 830407.Franklin Inst Test & Analysis Rept on 830322 Switch Failure Encl.Final Rept for Unit 2 by 831001
ML20023D163
Person / Time
Site: Susquehanna 
Issue date: 05/06/1983
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: ALLAN J M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20023D163 (2)