Documents 820818 Telcon Re Stop Work Order 82-01.Immediate Action Ltr Issued on 801224.Stop Work Order 80-14 Applies Only to Matl,Equipment & Labor Supplied by Reactor Controls, Inc.Catalytic,Inc Released to Perform New Work
ML20023D159
Person / Time
Site: Zimmer
Issue date: 08/30/1982
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20023D157 List:
References
QA-1967, NUDOCS 8305190314
Download: ML20023D159 (2)


Text

_,

u m

,,?

e

.c J +==> m*-

d(-

~

THE CINCINNATI GAS & ELECTRIC COMPANY CINCINN ATi, OHIO 45201 August 30, 1982 QA-1967

c. A. aoRGMAN N PRINCIPAL STAFF SENIOR VICE PRESIDENT NkA Jb' '!p s l

E U.

S.

Nuclear Regulatory Commission EIh

_ ff I

s Region III RP MS 799 Roosevelt Road

{

P 05 sto i

Glen Ellyn, Illinois 60137 Attention:

Mr.

J.

G.

Keppler L

FILE jg,,

Regional Administrator RE:

WM.

H.

ZIMMER NUCLEAR POWER STATION UNIT 1 CG&E STOP WORK ORDER 82-01 DOCKER NO. 50-358, CONSTRUCTION PERMIT NO.

CPPR-39. WO li 5 7 3 00, JOB E-5590, FILE QA-13 Gentlemen:

This letter documents the telephone conversation on August 18, 1982, between Messrs.

R.

Warnick, D.
Hunter, W.

Little of the NRC and H.

R.

Sager, B.

R.

Sylvia, J.

Shaffer and C.

W.

Vincent of CG&E.

It was agreed that the "Immediate Action Letter" issued by the Commission on December 24, 1980, and CG&E's Stop Uork Order #80-14 applied only to material, equipment and labor supplied by Reactor Controls Inc.

This understanding resulted in CG&E's modification of Stop Work Order #82-01 (copy attached), releasing Catalytic, Inc.

i I

to perform new work resulting from the Sargent & Lundy reanalysis of the CRD Piping System, except where such new work would adversely

(

affect the ability to evaluate and correct the material, equipmwnt j

and/or labor supplied by Reactor Controls Inc.

L If any additional information regarding the above is required, please let us know.

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY G

M' -

By e

8305190314 830516 E.

A.

BORGMANN PDR ADOCK 05000388 A

PDR SENIOR VICE PRESIDENT CWV:plc Attachment cc:

NRC Office of Inspection & Enforcement Washington, D.C.

20555 NRC Senior Resident Inspector Attn:

W.

F.

Christianson Zimmer Project Inspector Region III

..i N

STOP WORK ORDER Number: 82-01 Rev.1 Date: August 19, 1982 To: Catalytic Inc.

Attn:

Mr. R. Fisher This is notification that work is to be suspended immediately because of the following: The purpose of this revision is to clarify the extent of activities covered by this order.

This SWO applies to all material, equipment & labor furnished by Reactor Centrols Inc. ; it does not apply to new work except that any new work cannot advelsely impact accessability or the ability to evalutats and correct the material, equipmer.t & labor supplied by Reactor Controls Inc.

This modification was discussed with the Euclear Regulatory Commission (R. Warnick & D. Eunter) per te~ecen August 18, 1982 4:00 P.M., Resident

, React:r Inspector F. Christianson was in attendance.

Reason:

/

Prepared by:

in d-AM /

w / S-in-s.

A 1

A u th o r i z e d 6y :j'9r, -62 4 j ! C_

I'jc s

O4

-a.

e v. ft U

c.C.:

CG&E Senior Vice President CG&E Manager-Generation Construction CAT. INC. Site Quality Assurance Manager Attachment #1 15-QA-02

,I,I

)