_,
u m
,,?
e
.c J +==> m*-
d(-
~
THE CINCINNATI GAS & ELECTRIC COMPANY CINCINN ATi, OHIO 45201 August 30, 1982 QA-1967
- c. A. aoRGMAN N PRINCIPAL STAFF SENIOR VICE PRESIDENT NkA Jb' '!p s l
E U.
S.
Nuclear Regulatory Commission EIh
_ ff I
s Region III RP MS 799 Roosevelt Road
{
P 05 sto i
Glen Ellyn, Illinois 60137 Attention:
Mr.
J.
G.
Keppler L
FILE jg,,
Regional Administrator RE:
WM.
H.
ZIMMER NUCLEAR POWER STATION UNIT 1 CG&E STOP WORK ORDER 82-01 DOCKER NO. 50-358, CONSTRUCTION PERMIT NO.
CPPR-39. WO li 5 7 3 00, JOB E-5590, FILE QA-13 Gentlemen:
This letter documents the telephone conversation on August 18, 1982, between Messrs.
R.
- Warnick, D.
- Hunter, W.
Little of the NRC and H.
R.
- Sager, B.
R.
- Sylvia, J.
Shaffer and C.
W.
Vincent of CG&E.
It was agreed that the "Immediate Action Letter" issued by the Commission on December 24, 1980, and CG&E's Stop Uork Order #80-14 applied only to material, equipment and labor supplied by Reactor Controls Inc.
This understanding resulted in CG&E's modification of Stop Work Order #82-01 (copy attached), releasing Catalytic, Inc.
i I
to perform new work resulting from the Sargent & Lundy reanalysis of the CRD Piping System, except where such new work would adversely
(
affect the ability to evaluate and correct the material, equipmwnt j
and/or labor supplied by Reactor Controls Inc.
L If any additional information regarding the above is required, please let us know.
Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY G
M' -
By e
8305190314 830516 E.
A.
BORGMANN PDR ADOCK 05000388 A
PDR SENIOR VICE PRESIDENT CWV:plc Attachment cc:
NRC Office of Inspection & Enforcement Washington, D.C.
20555 NRC Senior Resident Inspector Attn:
W.
F.
Christianson Zimmer Project Inspector Region III
..i N
STOP WORK ORDER Number: 82-01 Rev.1 Date: August 19, 1982 To: Catalytic Inc.
Attn:
Mr. R. Fisher This is notification that work is to be suspended immediately because of the following: The purpose of this revision is to clarify the extent of activities covered by this order.
This SWO applies to all material, equipment & labor furnished by Reactor Centrols Inc. ; it does not apply to new work except that any new work cannot advelsely impact accessability or the ability to evalutats and correct the material, equipmer.t & labor supplied by Reactor Controls Inc.
This modification was discussed with the Euclear Regulatory Commission (R. Warnick & D. Eunter) per te~ecen August 18, 1982 4:00 P.M., Resident
, React:r Inspector F. Christianson was in attendance.
Reason:
/
Prepared by:
in d-AM /
w / S-in-s.
A 1
A u th o r i z e d 6y :j'9r, -62 4 j ! C_
I'jc s
O4
-a.
e v. ft U
c.C.:
CG&E Senior Vice President CG&E Manager-Generation Construction CAT. INC. Site Quality Assurance Manager Attachment #1 15-QA-02