'l 9
Consumets a
Power j
m a ma a su,u company
~~d~~
5$- WI Midlordd Project: PO Box 1963, Midland, MI 48640 e (517) 631-8660 May 6, 1983 Mr. J. J. Harrison Midland Nuclear Project Section U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road a
Glen Ellyn, IL 60137 i
MIDLAND ENERGY CENTER GNO 7020 9
x RD4EDIAL SOILS WORK AlfHiORIZATION File: 0485. 16 UFI: 42*05*22*04 Serial: CSC-6694 12*32 i
Attached for your review is Revision 6 to MPQP-1. The significant changes in MPQP-1 are as follows:
1.
Quality Assurance Engimering provides the inspection planning to QC.
Concurrence,on the inspection planning utilized by QC,is obtained from QC per Procedures E-3M and PSP G-6.1.
2.
Remove from QC the requirement of reviewing design documents. This requirement came frc.:t the original responsibility for QC to prepare the inspection planning. Now that QAE does the inspection planning the dual in line review prior to design document release can be eliminated as a requirement.
Input from QC will continue to be obtained as required to provide adequate quality review.
In accordance with the NRC/CPCo Work Authorization Procedure, we request your approval of this activity.
102351120 - Approval of MPQP-1, Rev. 6 Upon receipt of your authorization, an effectivity date will be assigned and the plan will be released.