ML20023C820
| ML20023C820 | |
| Person / Time | |
|---|---|
| Site: | 05000447 |
| Issue date: | 05/09/1983 |
| From: | Thomas C Office of Nuclear Reactor Regulation |
| To: | Houston R, Johnston W, Knight J Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8305180060 | |
| Download: ML20023C820 (3) | |
Text
,
T-tq.
~ Y: "
\\
MAY 9 INS Docket No. STN 50-447 MEMORANDUM FOR: James P. Knight, Assistant Director for Components &
Structures Engineering, DE William V. Johnston, Assistant Director for Materials, Chemical & Environmental Engineering, DE Robert W. Houston, Assistant Director for Reactor Safety, DSI Lester S. Rubenstein, Assistant Director for Core & Plant Systems, DSI Daniel R. Muller, Assistant Director for Radiation Protection, DSI Dennis L. Ziemann, Acting Deputy Director, DHF3 Frank Schroeder, Jr., Assistant Director for Generi: Projects, DST Frank Rowsome, Assistant Director for Technology, DST FROM:
Cecil 0. Thomas, Chief Standardization & Special Projects Cranch, DL
SUBJECT:
ACRS MEETING ON GESSAR II The ACRS's meeting to discuss General Electric Company's GESSAR II BWR/6 Nuclear Island Design is scheduled for May 13, 1983, starting at 3:30 p.m. in Room -1046, 1717 H. Street.
The attached agenda identifies the subject areas, and the approximate tim:: that each subject will be discussed. The appropriate staff reviewer has been indicated in order to provide coverage of the specific topics identified on
! the agenda. Please make sure that these people be available to attend this
(
meeting or provide a suitable alternate.
DISTRIBUTION:
A f6ent Control
?!RC PD'l PRC SSPR Reading 8305180060 830509
~
PDR ADOCK 05000447 A
PDR orrics >
sunaus >
04rr)
NRC FORM M8 00-80) NRCM Cao OFFICIAL RECORD COPY uso m i.ei-m.eo
7- _
Ii%
NRR AD's MAY 9 1983 A late shuttle will be available at the close of the meeting to return the staff to the Phillips building.
If you have any ouestions, please contact Dino Scaletti at 492-9797.
LilO 00-lr' Cecil 0. Thomas, Chief Standardization & Special Projects Branch Division of Licensing cc:
J. Lazevnick E. Tomlinson W. Lefave M. Virgilio B. Hardin J. Read F. Skopec T. Chandrasekaran J. Lane M. Tokar J. Rajan D. Gupta N. Chokshi A. Ibrahim R. Wescott B. Elliot D. Smith B. Turovlin J. Stang F. Witt B. Wright P. Shamanski J. Gilray V. Pezoldt M. Messier W. Long T. Su K. C. Leu H. Denton D. Eisenhut H. Thompson T. Speis R. Mattson R. Vollmer F. Miraglia D. Scaletti O FFICE >
sunnre >
..../... /8 3:../a...........
... /....../. 8 3.......b.............
5 om>
nac ronu sia co-ao) nacu aus OFFIClAL RECORD COPY usom an-mao
/..
TENTATIVE SCHEDULE FOR ACRS CONSIDERATION OF GESSAR II FDA (277TH MEETING)
FRIDAY, MAY 13, 1983 1.
suocommittee Chairman's Report
,DjOkrent (10 min) 3:30 P.':.
Staff Defin; tion of Review - Scope (dtci/ T4vue)
(5 min) 3:40 P.M.
2.
of Approval 3.
Summary of GESSAR II (15 min) 3:4 5 F.t'.
(Description of a BWR/6, 238 Nuclear Island) 4.
Status of Staff Review hin o $>/d/)
(20 min) 4:00 P.M.
- Outstanding Issues
- Confirmatory Items 5.
GE Response to Open Items (10 min) 4:20 P.M.
.6.
Other Comments by Subcommittee (10 min) 4:30 P.M.
ATWS and Scram System Design Considerations (3 r+4 n M }(10 min) 4:40 P.M.
7.
Hydrogen Control in Mark III Containments ['Tokw Lo we.)
(10 min) 4:50 P.M.
R.
Interface Requirements Between Nuclear Island and (20 min)
E: ' 9.M.
Balance of Plant
- 19. Occupational Exposure, ALARA Consideration (pe s$kafe](10 min) r 5:20 P.M.
V1. e --- U~2n d(10 min) 5:30 P.M.
'I.
Status of Internal Flooding (NRC Staff) s Intergranul ar Stress Corrosion Cracking' g.,_,,_ e 3,._
(15 min)
L 'O P.M.
Recent Experience,-Measures to Avoid (
Seismic Pasign/ Margin Beyond SSE {gg Qg C'n '<
(5 min) 5:55 P.M.
o
- 14. Status Report on Fuel Clad Ballooning (Staff g p.
(5 min) 6:00 P.M.
f
- 15. Other (10 min) 6:05 P.M.
- 16. Security (Closed)
(15 min) 6:15 P.M.
1 I
6:30 P.M.
- 17. Adjourn:
Remarks to Applicant 9
e e a
q.
~
.