ML20023C600
| ML20023C600 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 05/02/1983 |
| From: | Miller D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| CSC-6685, NUDOCS 8305170467 | |
| Download: ML20023C600 (2) | |
Text
.
CORSum8IS Power COSHy 8'""""'"'
Midland Project Midland Project: PO Box 1963, Midland, MI 48640 e (517) 631-C6b0 May 2, 1983 Mr. J. J. Harrison Midland Project Section U. S. Nuclear Regulatory Con.tission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 i
MfDLAND ENERGY CENTER GhD 7020 REMEDIAL SOILS h0RK AUTHORIZATION File: 0485.16 UFI:
42*05*22*04 Serial: CSC-6685 12*32 In accordance with the NRC-CPCo Work Authorization Procedure, we are required to obtain concurrence for changes to a previously approved work activity.
The specified changes for the following activity are enclosed:
105050908 Pier 11W - Perform Pier Load Test We request your concurrence on the above change.
DBM/GMM/klm Enclosure n
PDR 1 20]
m< - -'
Y
,_,_a
PIER W11 - ADDITIONAL EXCAVATION AND TELLTALE GECKOUT 1.
The area around Pier 11W down to elevation 597' will be excavated to check whether there are any frictional effects at the top of the pier.
1 7
Check out the te11 tales to detennine if any internal friction is present in the telltale.