ML20023C406

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 830301-04 & 09-11
ML20023C406
Person / Time
Site: Davis Besse 
Issue date: 04/27/1983
From: Streeter J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20023C399 List:
References
50-346-83-04, 50-346-83-4, NUDOCS 8305170308
Download: ML20023C406 (1)


Text

_

Appendix NOTICE OF VIOLATION Toledo Edison Company Docket No. 50-346 As a result of the inspection conducted on March 1-4, and 9-11, 1983, and in accordance with the NRC Enforcement Policy, 47 FR 9987 (March 9, 1982), the following violation was identified:

10 CFR 50, Appendix B, Criterion V states in part:

" Activities affecting quality shall be prescribed by documented instructions, procedures,..., of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures,...."

Davis-Besse Administrative Procedure AD 1828.03.6 - General Employee Training - states: " Experienced personnel may be exempted from receiving specific instruction in General Orientation and/or Radiological Controls Training. Successful completion of an examination may be required for each program for which an exemption is requested prior to approval of the exemption. A Personnel Training WA1VER Form... must be submitted to Nuclear Training for each individual a Toledo Edison management person requests this exemption for."

Contrary to the above, waivers had not been prepared and examination had i

not been given for two individuals who did not attend required annual requalification in Radiological Control Training.

This is a Severity Level V violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each item of noncompliance:

(1) cor-rective action taken and the results achieved; (2) corrective action to be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved.

Consideration may be given to extending your response time for good cause shown.

i NR27.g3

fll, Dated J. F. Streeter, Chie

'3,-

Engineering Branch 1 i

8305170300 830427 PDR ADOCK 05000346 G

PDR

.. ~

_