Second Interim Const Deficiency Rept 72 Re Radiation Monitoring Sys RM-23 Control Modules.Initially Reported on 830321.Corrective Action Scheduled for Completion by 830615. Final Rept Will Be Submitted by 830630
ML20023C332
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/11/1983
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3I83-0159, W3I83-159, NUDOCS 8305170223
Download: ML20023C332 (1)


Text

LOUISIANA P O W E R & L I G H T! p o Box 6008

  • NEW ORLEANS LOUISIANA 70174 142 ORARONDE STREET

. [504) 366-2345

=rs est L V. MAURIN Voce President Nuclear Operations May 11, 1983 W3183-0159 Q-3-A35.07.72 Mr. John T. Collins, Regional Administrator, Region IV 3bhb hb U. S. Nuclear Regulatory Commission I

611 Ryan Plaza Drive, Suite 1000 N

3 GT" Arlington, Texas 76012

}

~ " '

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382

._-____J Significant Construction Deficiency Report No. 72

" Radiation Monitoring System RM-23 Control Modules" Second Interim Report

REFERENCE:

LP&L letter W3I83-0091 dated March 21, 1983

Dear Mr. Collins:

At the present time, twenty-six (26) of the thirty (3C) RM-23 control modules have been returned to the vendor for rework. Corrective action is scheduled to be complete by June 15, 1983. A Final report will therefore be submitted l

by June 30, 1983.

1 Very truly yours, L. V. Maurin LVM/ MAL /cmk cc:

1) Director 3)

Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555

2) Director 4)

Mr. W. M. Stevenson Office of Management Information and Program Control -

q U. S. Nuclear Regulatory Commission 7

i Washington, D. C.

20555

, j/ '

py

,y /

f 8305170223 830511 PDR ADOCK 05000382 S

PDR