MONTHYEARML20023C8101983-05-10010 May 1983 Mod 1,extending Period of Performance to 830630 & Changing Payment & General Provisions,To Consulting Svc on Indian Point Probabilistic Safety Study ML20023C2221983-05-0202 May 1983 Contract: Conversion of Prefiled Testimony for Indian Point Hearings, Awarded to Central Data Processing,Inc 1983-05-02
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20101S4391992-06-30030 June 1992 Pump & Valve Inservice Testing Program for Indian Point 3 Nuclear Power Plant, Technical Evaluation Rept ML19351A2461989-09-30030 September 1989 Evaluation of Max Density Spent Fuel Rack Structural Analysis for Indian Point Station Unit 3, Technical Evaluation Rept ML20069N2031988-10-31031 October 1988 Rev 1 to, Conformance to Reg Guide 1.97:Indian Point-3, Technical Evaluation Rept ML20237A5461987-08-31031 August 1987 Reactor Coolant Pump Seal Evaluations ML20211E9641986-10-31031 October 1986 Rev 3 to Conformance to Generic Ltr 83-28,Item 3.1.3 & 3.2.3,Braidwood Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Indian Point Unit 3,Trojan Nuclear Plant & Wolf Creek Generating Station ML20211N8071986-05-31031 May 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Indian Point 2,Kewaunee,North Anna 1 & 2 & Prairie Island 1 & 2 ML20140H3071986-03-31031 March 1986 Probabilistic Safety Study Applications Program for Inspection of Indian Point Unit 3 Nuclear Power Plant ML20140E4641986-01-31031 January 1986 Digraph Matrix Analysis for Systems Interactions at Indian Point Unit 3.Volume IV - Appendix C.Hardcopy Available in PDR Only ML20155E8651986-01-31031 January 1986 Fault Tree Application to the Study of Systems Interactions at Indian Point 3 ML20154S4181986-01-31031 January 1986 Digraph Matrix Analysis for Systems Interactions at Indian Point Unit 3 ML20140E4701986-01-31031 January 1986 Digraph Matrix Analysis for Systems Interactions at Indian Point Unit 3.Volume 5 - Appendix D,Probability Data Base. Hardcopy Available in PDR Only ML20140E4301986-01-31031 January 1986 Digraph Matrix Analysis for Systems Interactions at Indian Point Unit 3.Volume 3 - Appendix B,Dma Digraphs and Reference Drawings.Hardcopy and 174 Aperture Cards Available in PDR Only ML20140E3721986-01-31031 January 1986 Digraph Matrix Analysis for Systems Interactions at Indian Point Unit No. 3.Volume II - Appendix A.Hardcopy Available in PDR Only ML20197G3871986-01-22022 January 1986 Dcrdr for Indian Point Station,Unit 3, Technical Evaluation Rept ML20138K9841985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Byron Station Unit 1,Callaway Plant Unit 1,Indian Point Unit 3,Trojan Nuclear Plant & Wolf Creek Generating Station ML20214F8171984-11-16016 November 1984 Safety Evaluation of Core-Melt Accidents:CESSAR-FDA, Westinghouse Std Plant-FDA, Safety Evaluation of Core-Melt Accidents:Indian Point...& Zion-Operating Reactor & Review of PRA for Seabrook..., Monthly Repts for Oct 1984 ML20107K9341984-07-10010 July 1984 Draft Control of Heavy Loads - Phase Ii,Indian Point Nuclear Power Plant Unit 2, Technical Evaluation Rept ML20091D2061984-05-31031 May 1984 Reliability Assessment of Indian Point Unit 3 Containment Structure ML20090H8051984-05-23023 May 1984 Reliability Assessment of Indian Point Unit 3 Containment Structure Under Combined Loads ML20127M8231984-02-13013 February 1984 Safety Evaluation of Core-Melt Accidents:Indian Point Operating Reactor & Zion Operating Reactor, Monthly Highlights for Jan 1984 ML20127N6901984-01-16016 January 1984 Safety Evaluation of Core-Melt Accidents:Indian Point Operating Reactor & Zion Operating Reactor, Monthly Highlights for Dec 1983 ML20127N6461983-11-17017 November 1983 Safety Evaluation of Core-Melt Accidents:Indian Point Operating Reactor & Zion Operating Reactor, Monthly Highlights for Oct 1983 ML20127N1191983-10-20020 October 1983 Std Order for DOE Work: Safety Evaluation of Core-Melt Accidents:Operating Reactor Reviews for Indian Point & Zion, Issued to BNL ML20127M8561983-09-0202 September 1983 Std Order for DOE Work: Safety Evaluation of Core-Melt Accidents:Operating Reactor Reviews for Indian Point & Zion, Issued to BNL ML20127N6241983-08-31031 August 1983 Safety Evaluation of Core-Melt Accidents:Indian Point Operating Reactor & Zion Operating Reactor, Monthly Highlights for Aug 1983 ML20127A8291983-08-0404 August 1983 Std Order for DOE Work: Safety Evaluation of Core-Melt Accidents;Operating Reactor Reviews for Indian Point & Zion, Awarded to BNL ML20127N5971983-07-31031 July 1983 Safety Evaluation of Core-Melt Accidents:Indian Point Operating Reactor & Zion Operating Reactor, Monthly Highlights for Jul 1983 ML20072E4341983-06-30030 June 1983 Investigation of the Shell Cracking on the Steam Generators of Indian Point No. 3.Docket No. 50-286.(Consolidated Edison Company) ML20127N5681983-06-16016 June 1983 Safety Evaluation of Core-Melt Accidents:Indian Point Operating Reactor & Zion Operating Reactor, Monthly Highlights for May 1983 ML20084N0881983-06-0101 June 1983 Analysis of PRA Testimony:Indian Point ASLB Hearings, Commission Question 1, Final Rept ML20023C8041983-05-10010 May 1983 Notification of Contract Execution,Mod 1 to Consulting Svc on Indian Point Probabilistic Safety Study. Contractor: Columbia Univ ML20023C8101983-05-10010 May 1983 Mod 1,extending Period of Performance to 830630 & Changing Payment & General Provisions,To Consulting Svc on Indian Point Probabilistic Safety Study ML20023C2201983-05-0202 May 1983 Notification of Contract Execution: Conversion of Prefiled Testimony for Indian Point Hearings, Awarded to Central Data Processing,Inc ML20023C2221983-05-0202 May 1983 Contract: Conversion of Prefiled Testimony for Indian Point Hearings, Awarded to Central Data Processing,Inc ML20127N5301983-04-30030 April 1983 Safety Evaluation of Core-Melt Accidents:Indian Point Operating Reactor & Zion Operating Reactor, Monthly Highlights for Apr 1983 ML20023C2231983-04-26026 April 1983 Solicitation,Offer & Award to Conversion of Prefiled Testimony for Indian Point Hearings, to Central Data Processing,Inc ML20127N4831983-03-31031 March 1983 Safety Evaluation of Core-Melt Accidents:Indian Point Operating Reactor & Zion Operating Reactor, Monthly Highlights for Mar 1983 ML20083Q7111983-03-0404 March 1983 Preliminary Investigation of Interconnected Sys Interactions for Safety Injection Sys of Indian Point 3 ML20127N4001983-02-28028 February 1983 Safety Evaluation of Core-Melt Accidents:Indian Point Operating Reactor & Zion Operating Reactor, Monthly Highlights for Feb 1983 ML20127N2761983-01-31031 January 1983 Safety Evaluation of Core-Melt Accidents:Indian Point Operating Reactor & Zion Operating Reactor, Monthly Highlights for Jan 1983 ML20127A4531983-01-24024 January 1983 Std Order for DOE Work: Safety Evaluation of Core Melt Accidents:Indian Point-OR & Zion-OR, Issued to BNL ML20028E4001983-01-11011 January 1983 Notification of Contract Execution,Mod 2 to Indian Point Fire Risk Analysis. Contractor:Nbs ML20028D7201982-12-31031 December 1982 Review and Evaluation of the Indian Point Probabilistic Safety Study ML20127M3211982-12-30030 December 1982 Std Order for DOE Work: Safety Evaluation of Core-Melt Accidents:Indian Point Operating Reactor & Zion Operating Reactor ML20127M2231982-12-0303 December 1982 Project & Budget Proposal for NRC Work: Safety Evaluation of Core-Melt Accidents:Indian Point Operating Reactor & Zion Operating Reactor ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20069N7621982-09-30030 September 1982 Review of Indian Point Probabilistic Safety Study ML20027C1061982-08-31031 August 1982 Degraded Grid Protection for Class IE Power Sys,Indian Point Nuclear Station Unit 3, Technical Evaluation Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20105B4161982-08-25025 August 1982 Ltr Rept on Review of Evaluation of Indian Point Probabilistic Safety Study, Draft Rept 1992-06-30
[Table view] |
Text
I 4
sa.iw At.'U4Dt.'iLNI. OF 50UCil AilON/MODlilCA'ilON OF LONH;ACT
]
.cn.n u Sn..a5 At e.3i.i.ici
.D.
OC.
,,G. m o g. AMit.(JMf Nid a0DW IC ATON NO.
2 f f f tCTIVE DATI
- 3. StOul5f1C,d/PUSCHAst erOUtif NO.
- d. PpOff C1 NO. (l/ s/fl sh/s)
One (1)
ISY 'S 1933 TIRC-33-03-460 5 c5SunD sY cour s n,M n1,,,,D,, of.,1,,,,1-. u.a,)
< out. l U.S. Nuclear Regulatory Commission Division of Contracts Washinoton. DC 20555 r COusnAC10e
. coon l l
uctury coot L_
l..
NAME AND ADDfl55 A uj NDMt N1 07 50ttCIT ATON NO Central Data Processing, Inc.
]
8007 Cryden Way DAuD (5,, 61 & 91 (5M. ~i.
Forestville, MD 20474
',Nu'.""*
y3 CLYn'I$i0nDi'r NO. NRr 33=83-alin C.d:)
DAttDMay 9 - 1 W (5ee blau& DI) 9 1PK5. LOCK APPltE5 ONLY IQ AMf NDME N15 OF 50tlCli ATION$
.....ea.
..a
.--.... w.a m, s.
.a.,.N
.a.......... O....
O.4.-a........,,s.....a_......s...a..,...,.....a...,,_.....,_,_d.,
..........-.-,43.,.a.,;..............--..._...s..,,...............a;io.....................-
i n.,...a.....
.k. 4.. l.d....f...a. e e..he..l h.
.ad.
.d m.no mb....
F Altutt OF YOUR ACENOWLE DGE MENT 10 st stClivfD AT TME ISSUING OFFICE PalOR TO THE HOut AND
- b. m.d. b, se!.. =
DATE 5F1CIFif D MAY RE5UtiIN #f JECTION OF VOut of f f R.
t,. b,.
., eh... m.ad mea. y d.... s.. h.ag..a.....t...d,..b=.a. d.
...h.h.c i... a.
i.,,- i....
6..............i..
.a
.a..
.. 4.........
.s..,..
5.
.-4 e.....e..o.
a.,
so. ACCOUMlING AND APPROrt ATION DATA (// rr9.rrd)
B&R FIN No.
Appropriation Symbol Amt. Obligated 80-20-25-03 RRR;;
31X02DO.803 51646 R7
- 11. THt5 stCKK APPut$ ONLY TO MODIFICAflONS OF CONTRACT 5/Oaot ts in 0 a. c>.
o.s........... - -
n.O w.ai2.
a.
.x..
w.a.
.oi
<*> 0 ' - -s-
. o. t-a..
e... -ae-o..<>
- s..a-.-
.~...s.-
. i. *.......
.. ~.. P
. - -... i ' '
. 6'-a i n -
io D n.5.,,i...MoiA....
........a
.s
,.. _ch ges c1a m e ae.....
6...
w.a......o...., s.. w a a Whereas, the actual quantity of pages requiring conversion services are 2,905 in lieu of DESCRIPTION OF AME NDMt NT/ MODiflCATION 12 2,000 as originally estimated; and, Whereas, the contractor has agreed to provide said additional services at the unit price offered under the basic solicitation and as further referenced in the letter dated May 4, 1983; Therefore, subject contract is amended contemporaneous 1y with award as follows:
Page 1, Block 22; the total amount of the contract is changed from $3,750.00 to $5446.87, an increase of $1696.87.
Page 14, Article I, Item 0001:
The quantity is changed from 2000 to 2905.
The amount is changed from $3750.00 to $5446.87, an increase of $1696.87.
an increase of Article VI, total amount of contract, is changed from $3750.00 to $5446.87, In consideration thereof, Article II, " Description / Specifications", Section B,
$1696.87.
" Document Delivery and Pickup", is amended as follows:
...... -.a a m.....
..a...
....s.
........a m.a..........
.a.
.a. _.
..a...e h
"3 CON 1s AC10R/Of f t#On 15 proviatD TO 5'GN THl$ DOCUMf NT AND sflUtN COPits 10 155UiNG Of f SCI y gg id. HAM { Of CON TR AC TOeiO,tg aOm
- 17. UNIT [D 51 Alts Of AMI RICA M > y.
-; m.-* S-gy gy i5w..... -. O~...
i5,,.....
... a.....,3
[T f t.r pr,.7)
- 16. Dall 5lGN[D 18 N AMI OF CONTRACTING Of r Ki t ( Ty;..r f r.nt)
- 19. DAff SIGNED 15 NAMf AND TITil OF SIGN (8 f
b%Y.91993 p
8305160312 830502 Mary Jo Mattia PDR CONTR so-ict NRC-33-83-460 PDR
- u.s. cat um me: : :rnCt isn D - n:-5n o..n
e,,
Page_2_pf 2 NRC-33-834160 Amendment / Modification #1 Delivery of the magnetic tapes which contain data from the 2000 pages of prefiled testimony is required by the Government on or before May 10, 1983.
Delivery of the magnetic tapes which contain the remaining 905 pages of prefiled testimony is required by the Government on or before May 11
-1983.-
Earlier deliveries will be accepted as long as they do not result in additional cost to the Government.
e e
0
_