ML20023C022
| ML20023C022 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 05/02/1983 |
| From: | Crutchfield D Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20023C018 | List: |
| References | |
| NUDOCS 8305090491 | |
| Download: ML20023C022 (9) | |
Text
,. _.
((g,A REC k O
UNITED STATES s,,, f-
- NUCLEAR REGULATORY COMMISSION
'j WASHINGTON, D. C. 20555 5
CONNECTICUT YANKEE ATOMIC POWER COMPANY DOCKET NO. 50-213 HADDAM NECK PLANT AMENDMENT TO FACILITY OPERATING LICENSE J
Amendment No. 56 License No. DPR-61 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The. applications for amendment by Connecticut Yankee Atomic Power Company (the licensee) dated July 23, 1982 and February
~
15, 1983 comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter'I; B.
The facility will operate in conformity with the applications, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and. safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
8305090491 830502 PDR ADOCK 05000213 j
P PM l
s
_.. _. ~, - - - - -
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 2.C(2) of Facility Operating License No. DPR-61 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B as revised through Amendment No. 56, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION 1l y
/ -
ennis M. Cru c fiel, Ch ef Operating Reactors anch #5 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: May 2,1983 l
l
{
l l
I l
i
_ ATTACHMENT TO LICENSE AMENDMENT NO. 56
~
~
FACILITY OPERATING LICENSE NO. DPR-61 DOCKET NO. 50-213 Replace the following pages of Appendix B (Environmental) Technical Specifications with the enclosed pages. The revised pages are identified by the captioned amendment number and contain vertical lines indicating the area of change.
PAGES i
2.3-1 through 2.3-3A 3.1-1 5.1 -1
- 5.3-1*
5.5-1*I)
L l
- These pages are included for the purpose of recognizing title changes l
approved by License Amendment No. 51, January 26, 1983, which were in-advertently omitted from the licensee's February 15, 1983 application i
and the related License Amendment No. 54 dated itarch 11, 1983.
- 1) Moreover, this page is being reinstated as approved by License Amendment No. 51. The licensee inadvertently proposed a change in this page by its February 15, 1983 application, which resulted in License Amendment No. 54.
I l
7ADLE 07 CC:C; S
- - P:;e 1.0 Definitiens and Abbrevia: tens 1,1 1.1 Definitions 1.L 1.2 4hbreviations 1.2 2.O Ld=iti-.- Cend1: den: 'fer onev..:fe5 2.1 1 2.4 Radicac:ive Iffluents 2.4 1
~
2.4.1 Specifica:icas for I.iquid Waste Efflue::s 2.4-2
2.4.2 Specifica
Lens fe: Liquid Vante se=pling and Monitoring. ~
A. -
-2.4-2 2.4.3 Specifics:icas for caseous Waste Efflues:s
'2.4-5 2.4.4 Specifics:1ons for Gasemus Vaste sa=pli=g and Menico d g "2,4-8 2.4.5 Specifiestions for solid Wasta sa pling.
and Dispossi 2.4-12 '
~
3.0 Invirescental sur.e111snee 3.1-1 3.1 Nenr:diological Surveillance 3,1_1 3.1.2 Metecrelogical MonitorinE 3.1-3 3.2 Radiological Enviren==ntal Moni:oring 3,;_1 i
i
- mend ent f;;
4, 56
~
O e
y
2. 3' CHEMICAL (deleted)
(INTENTIONALLY BLANK) l 2,3-1 through 2.3-3A Amendment No. 32', 5[, 56
3'. d ENVIRONMENTAL SURVEILLANCE 3.1 Nonradiological Surveillance 3.1.1 Fish Impingement (deleted)
(INTENTIONALLY BLANK) i i
3.1-1 AmendmentNo.g,56
-m e,.,
~ ~.
- 5. 0. -
ADMINISTRATIVE CONTROLS Object [ve Ad=inistrative and management controls are established to provide continuing protection to the environment and to i=ple=ent the environ = ental technical specifications.
Specifications 5.1 Responsibility 5.1.1 The ultimate r'esponsibility for implementation of the Environmental Technical Specifications shall reside with the c'orporate officers of The Connecticut Yankee Atomic Power Co=pany. The corporate and station level organization chart is shown in Figure 5.2.1.
5.1.2 The Statien-Sueerintendent shall have direct responsibility for assuring that the operation of The Connecticut. Yankee Atomic Power Co=pany, Haddam Neck Plant, is conducted in such a manner as to provide continuing protection to the environment.
During periods when the Station Superintendent is unavailable, he =ay delegate his responsibility to the Unit Superintendent or Station Services Superintendent or qualified plant super-visory personnel as designated in the plant administrative l
procedures, e
Operation of the plant to insure adherence to the limiting conditions for operation is the responsibility of the Station Superintendent with the assistance of the plant staff organ-ization.
5.1.3
(; deleted)
(
5.1.4 The i==ediate responsibility for the review and updating of l
each program lies with the group performing the activity.
They can receive assistance in the review from the various scientific and technical personnel employed.by NUSCO or from outside environmental consultants.
- 5.1.5 The Environmental Review Board's (ERB) scope of r'esponsibilities shall include the review and audit of environmental matters as j
described in Section 5.3.
i AmendmentNo.%[,f,56 5.1-1 e
.s.
5.3 Review-and-Audit 5.3.1 The Environmental Review Board shall review the following:
5.3.1.1 Proposed changes to these Environmental Technical Specifications and the evaluation of the impact of the change.
5.3.1.2 Proposed changes or modifications to plant systems or equip-ment which are determined to have an "unreviewed environmental impact".
5.3.2 The Environmental Review Board shall make or cause to be made at least semiannua1 reviews or audits of the folaowing:
5.3.2.1 Investigations of all reported instances of violations of Environmental Technical Specifications. Where investigation indicates, evaluate and formulate recommendations to prevent recurrence.
5.3.2.2 Surveillance records, written procedures and reports required for. compliance with these Environmental Technical Specifi-cations.
5.3.3 (deleted) 5.3.4 The Environmental Review Board shall make or cause to be made an annual review of the programs described in the Environ-cental Technical Specifications with the objective of proposing changes or modifications of the scope or content of the programs.
D Amendment No. }2( JVf, 56 5.3-1
4 5.5 Procedures
~
5.5.1 Detailed written procedures, including applicable check lists and instructions, shall be prepared and followed for all activities involved in carrying out the environ-mental technical specifications.
Procedures shall include sampling, data recording and storage, instru=ent calibration, measurements and analysis, and actions to be taken when limits are approached or e ceeded.
Testing frequency of any alarm shall be included.
These frequencies shall be deter-mined from experience with sLnilar instruments in similar en-
, vironments and from manufacturers' technical manuals.
Procedures shall be prepared for assuring the quality of program result's, includtng analytical measurements, which document the program in policy directives, designate a re-sponsible organization or individuals, include purchased services, (e.g., contractual lab or other contract services),
include audits and include systems to identify and correct deficiencies, investigate anomalous or suspect results,'and review and evaluate program results and reports.
5.5.2 Plant standard operating procedures shall include provisions, in addition to the, procedures specified in Section 5.5.1, to ensure that all plant systems and components are operated in compliance.with the limiting conditions for operations estab-lished as part of the Environmental Technical Specifications.
v 5.5.3 All procedures described above and changes thereto shall be reviewed prior to implementation as follows:
By PORC for procedures which are performed by or under a.
the direct responsibility of plant personnel, procedures which may effect plant operation, or procedures related to nuclear safety.
l b.
By a qualified individual of the Nuclear and Environ-mental Engineering Division, other than the author, for procedures perfor=ed by or under the direct responsibility of the Nuclear and Environmental Engineering Division, By a qualified individual of the Production Operations c.
Services Laboratory, other than the author, for pro-cedures performed by or under the direct responsibility of the Production Operations Services Laboratory.
l 5.5-1 AmendmentNo.3f,pf,p/,56 l
.