ML20023C015
| ML20023C015 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 05/06/1983 |
| From: | Cutchin J NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) |
| To: | Bloch P, Bright G, Kline J Atomic Safety and Licensing Board Panel |
| Shared Package | |
| ML20023C016 | List: |
| References | |
| ISSUANCES-OL, NUDOCS 8305090487 | |
| Download: ML20023C015 (2) | |
Text
p* M Cg
((;
,g NUCLEAR REGULATORY COMMISSION
'o, UNITED STATES f
,. y WASHING TON, D. C. 70555
\\...../
May 6, 1983 Peter B. Bloch, Esq., Chairman Dr. Jerry R. Kline Administrative Judge Administrative Judge Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555 Washington, DC 20555 Mr. Glenn 0. Bright Administrative Judge Atomic Safety and Licensing Board U.S. Nuclear Regulatory Connission Washington, DC 20555 In the Matter of CLEVELAND ELECTRIC ILLUMINATING COMPANY, ET AL.
(Perry Nuclear Power Plant, Units 1 and 2)
Docket Nos. 50-440 OL, 50-441 OL
Dear Board Members:
The purpose of this letter is to inform the parties and members of the Licensing Board that certain documents related to matters mentioned on page 24 of the NRC Staff's prefiled testimony on Issue #3 (Quality Assurance) have been, are being, or will be provided to Chairman Bloch as requested by him.
Chairman Bloch has'been provided a copy of a letter dated September 10, 1982 from C. E. Norelius of NRC Region III to the Applicants, with its enclosures. Those documents relate to the special Construction Assessment Team inspection that was performed by the NRC at Perry in July and August 1982.
Those documents are available in the Public Document Room (PDR). Copies of those documents were provided to Mr. Wilt, counsel for the lead intervenor on Issue #3, at the time they were issued. A copy of the "self-initiated" evaluation that was performed by the Applicants in accordance with guidelines of the Institute of Nuclear Power Operations (INP0) is being provided to all Licensing Board members and interested parties (except Applicants) as an enclosure with this letter, because that document is not yet available in the PDR.
8305090407 830506 PDR ADDCK 05000440 DESIGNATED ORIGINA 3rti led T>y bhDG e
~
'l
O.
i-
.g The report of the quality assurance inspection at Perry that was initiated by the NRC in April 1983 has not issued. A copy will be provided to all Licensing Board members and interested parties after it becomes available.
Sincerely,
~
w%
%Lw James M. Cutchin IV Counsel for NRC Staff
Enclosure:
As stated cc w/ encl.: -Dan Wilt, Esq.
Susan Hiatt cc w/o encl.:
Jay Silberg, Esq.
Donald T. Ezzone, Esq.
John G. Cardinal, Esq.
i Terry Lodge, Esq.
4 0
~
t
=
e.
r v
,--r--,,m.,,c,
,n..,,,
,,nmn,,,.
n,,_,
_n,,.
/
i k
P.O. Box 5000 CLEVELAND, OHIO 44101 TELEPHONE (216) 622-9800 - lLLUMINATING BLDG. - 55 PUBLICSoUARE Semng The Best Localico e: tne Nation MURRAY R. EDELMAN December 7, 1982 VICE MESIDENT NUCMAR Mr. James G. Keppler U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Keppl'e'r:
Attached is a report on a Self-Initiated Evaluation conducted for the Perry Nuclear Plant. A team of 16 engineering and construc-tion experts, mainly from outside the Perry Project, were used to conduct the evaluation. The evaluation was performed utilizing guidelines and criteria established under an INPO program for con-struction project evaluations. Our report is being submitted to demonstrate the extent of our evaluation, the resultant assessment of the project and our commitment to maintaining the highest stand-ards of quality in the Perry Project.
The Perry Project has benefitted from this evaluation. The results reaffirmed that our Project Management Organization is sound and has effective control.
Initial actions already taken in response to the evaluation have been beneficial. Planned corrective action in response to specific findings will further enhance the, project.
Feel free to contact us if there are any questions regarding this report.
Sincerely, Murray R.
delman Vice President Nuclear MRE:bal cc: D. R. Davidson C. M. Shuster
.