Informs That Changes to Rosemount Transmitters Will Be Completed by 840701 for Unit 1 & Prior to Fuel Load for Unit 2.Info Completes Response to IE Bulletin 80-16
ML20023B581
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 04/25/1983
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
REF-SSINS-6820 IEB-80-16, NUDOCS 8305050202
Download: ML20023B581 (3)


Text

E

, . s, PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BCO( 8699 PHILADELPHIA. PA.19101

"" ' " 5 JOHN S. KEMPER APR 251983 V IC E-PR ESI D E N T ENGeNEE ReNG AND RESE ARCH Mr. Ronald C. Haynes, Director United States Nuclear Regulatory Commission Office of Inspection and Enforcement, Region 1 631 Park Avenue King of Prussia, PA 19406 SUEJECT: NRC Region 1 letter, dated June 27, 1980 RE: IE Bulletin No. 80-16: " Potential Misapplicaticm of Rosemount, Inc. Models 1151 and 1152 Pressure Transmitters with Either "A" or "D" Output Coden" Limerick Generatin3 Station, Units 1 and 2 Docket Nos. 50-352 and 50-353

REFERENCES:

(1) J. S. Kemper letter of 8/25/20 to B. H. Grier (2) J. S. Keraepr letter of 9/10/80 to B. H. Crier (3) J. S. Kemper letter of 10/1/80 to B. E. Grier (4) J. S. Kemper letter of 1/30/81 to B. H. Grier (5) J. S. Kemper letter of 3/5/81 to B. H. Grier FILE: GOVT l-1 (IE Bulletins)

Dear Mr. Haynes:

This letter supersedes the reference letter to B. H. Grier, dated 3/5/81. That letter stated that the changes to the subject transmitters will be complete by September 30, 1982.

This letter is intended to inform the Nuclear Regulatory Commission that the date for completion of corrective action has been revised to July 1,1984 for Unit 1 and prior to fuel load for Unit 2.

In August, 1981, General Electric issued a Field Disposition Instruction (FDI) which authorized GE site personnel to correct deficiencies in the 1151 and 1152 models of the Rosemount transmitters. As of July, 1982, however, Philadelphia Electric deemed it necessary to replace many of the existing transmitters with the 1153 models. This is essential in order to meet Environmental Qualification requirements.

fDR O O ,

O h

.' %=,

Mr. Ronald C. Haynes In response to this, General Electric placed a hold on further processing of the FDIs until Philadelphia Electric identified those transmitters which will be replaced with the 1153 models. This list was sent to General Electric in February, 1983. With the information available, General Electric will provide the FDIs and make all necessary changes.

Conclusion of this action will be tracked by the follow-up system for IE Bulletins, Circulars and Information Notices maintained in the office of the Project Manager.

We believe that this disposition concludes our response to the subject bulletin.

If further information la required, please do not hesitate to CCritJCt us.

Sincerely, I?l? f 5f i/

Copy to: Director of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, DC 20555 l

. _ .._;_ ._ . . .m.

. 4 2

1 1

COMMONWEALTH OF PENNSYLVANIA :

SS.

  • COUNTY OF PHILADELPHIA  :

I JOHN S. KEMPER, being first duly sworn,-deposes and says:

That he is Vice President of Philadelphia Electric Company, the holder of Construction Permits CPPR-106 and CPPR-107 for i

,- Limerick GeneratinF Station l' nits 1 and 2; that he has read the fore.goin3 letter providinE nddicional infc,t. nation relating to the Company's Er_spon7e to IE Bulletiu 80-16 for Docket Ncs. 50-352

< and 50-353 ano knows the contents thereof; an<1 that the statemeats and matters set forth therein are true end correct to the best of his knowledge, information and belief.

$' 0A T /d _ L

, Subscribed and sworn to before me this M day f-of- & l @ D.

JAk Notary Public PATRICIA 0. SCHOLL f Notary Pu2c, PNbdelphia, PSht! dh Co.

My Commissian fa;iras fetruary 10. 1025 I

l l

l u, _ _ _ . ~ . _ . _ _ _ . - - - - .___ ._. .... _. _ _. . . ~ . _ _ _,,.. __..___.__ _._ _ . . ~ _