ML20023B533

From kanterella
Jump to navigation Jump to search
Discusses QA Program Insp Rept 99900224/83-01 on 830214-18. Appropriate Corrective Action Taken & Problem Re ECCS Cabinets Incorrectly Wired Determined Not Generic
ML20023B533
Person / Time
Issue date: 05/02/1983
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-QA-99900224 NUDOCS 8305050160
Download: ML20023B533 (1)


Text

--

MAY 0 21983 MEMORANDUM FOR:

R. L. Spessard, Director, Division of Project and Resident Programs, Region III FROM:

Uldis Potapovs, Chief, Vendor Program Branch, Division of Vendor and Technical Programs, Region IV

SUBJECT:

EMERGENCY CORE COOLING ACTUATION SYSTEM CABINETS WIRED INCORRECTLY (VITS82-160)

Reference:

Memorandum from C. C. Williams, RIII, to S. Phillips, RIV, June 29, 1982 A Vendor Program Branch (VPB) inspection was performed at the Bailey Controls Company (BCC) Wickliffe, Ohio, plant on February 14-18, 1983, which included the subject item in the scope. The results of the inspection are documented in the attached VPB Inspection Report No. 99900224/83-01.

The results of the inspection indicate both that appropriate corrective actions have been taken by BCC and that the identified problem was not generic in nature.

The subject item has now been closed by the VPB.

Should you have any questions, please contact Messers. I. Barnes (728-8176) or L. B. Panker (728-8199),

ww ss:nsd kys U. Por^po,s

  • Uldis Potapovs, Chief Vendor Program Branch cc:

R. L. Baer, IE R. F. Heishman, IE J. T. Collins, RIV R. L. Bangart, RIV J. E. Gagliardo, RIV C. C. Williams, RIV bcc:

LBParker VPB 7010 File RIV d

.. f CI:R& CPS SC:R& CPS BC:VPRf[

D:D & P (

LBParker/ mas IBarnes UPotapoNs RL a gart' 4/1/83 4/// /83 4q(/83

[q/g/83p.

S 8305050160 830502 0

PDR GA999 EPfVBAIL 99900224 PDR

_