ML20023B321

From kanterella
Jump to navigation Jump to search
Forwards Updated LER 82-017/01T-1
Date released: 02/06/2020 Download: ML20023B321


Updated LER 82-017/01T-1:on 821030,verified That Indications for Four Steam Generator a Tubes & Three Steam Generator B Tubes Exceeded 40% Plugging Limit During Eddy Current Exam on 821026-30.Cause Not Stated.Tubes Mechanically Plugged
ML20023B325
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 12/10/1982
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20023B325 (7)
Forwards Updated LER 82-017/01T-1
ML20023B319
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 12/10/1982
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20023B319 (1)