ML20021A089
| ML20021A089 | |
| Person / Time | |
|---|---|
| Site: | 07007016 |
| Issue date: | 01/06/2020 |
| From: | Jenny P Global Laser Enrichment |
| To: | John Lubinski Document Control Desk, Office of Nuclear Material Safety and Safeguards |
| References | |
| GLE-2020-0002 | |
| Download: ML20021A089 (1) | |
Text
'(,)"I-'
GumAL laser Enrichment G LE-2020-0002 January 6, 2020 ATIN: Document'Control Desk John W. Lubinski, Director Office of Nuclear Material Safety & Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
- Global Laser Enrichment PatJenny Secunty/1...Jcensmg Manager 3901 Castle Hayne Road W1lmlngton, NC 28402-0780 USA T 910 819 7447 F 910 362 5731 C9102~744 Pat Jenny@ge-com
Subject:
Glo!>al Laser Enrichment Commercial Facility Integrated Safety Analysis summary
. Annual Update for SNM-2019
Dear Mr. Lubinski:
The requirements in 10 CFR 70.72(d)(3), call for licensees to submit to NRC annually, within 30 days after the end' of the calendar y,ear during which the.changes occurred, revised Integrated Safety Analysis (ISA)
Summ'ary pages. The purpose of this letter is to inform the NRC that GE Hitachi Global Laser Enrichment LLC (GLE) has not made changes to the ISA Summary since the initial license for the GLE Commercial.
Facility (SNM-2019) was issued on September.25, 2012. Therefore, GLE will not be submitting revised pages. The Commercial Facility license SNM-2019 \\s being held in abeyance, until GE plans on building the facility. Any changes needed to keep the license current with the regulations will be reviewed and updated as appropriate prior to construction.
If there are any questions regard in~ this letter and its contents, please do not hesitate to contact me at:
910-819-7447 or at pat.jenny@ge.com.
Sincerely, P.a Se