ML20012E839

From kanterella
Jump to navigation Jump to search
Notification of 900403 Meeting W/Util in Rockville,Md to Discuss Results of Facility Inservice Insp & Plans for Crack Repair.Meeting Agenda Encl
ML20012E839
Person / Time
Site: Hatch 
Issue date: 03/29/1990
From: Crocker L
Office of Nuclear Reactor Regulation
To: Miraglia F, Murley T, Sniezek J
NRC
References
NUDOCS 9004060415
Download: ML20012E839 (5)


Text

.,

g c.

l e "82 p

~

f

. $ps k,-

UNITED STATES c.

L

E g

NUCLEAR REGULATORY COMMISSION 5

WASHINGTON, D. C 20$b$

i g

/

e...*

j Docket No. 50-321

['

MEMORANDUM FOR:

T. Murley B. Grimes.

P. McKee J. Sniezek F. Congel A.'Thadani l

F. Miraglia, ADT J. Roe

~C. McCracken i

L J. Partlow, ADP C. Grimes EAB/ Acting Chief -

D.<Crutchfield, ADSP B. Boger J. Dyer. EDO S. Varga G. Lainas F. Gillespie G. Holahan W. Travers W. Bateman C. Rossi B. D. Liaw T. Cox J. Richardson E. But er J. Zwolinski l

l-THRU:

David B. Matthews, Directo \\

Project' Directorate 11-3 h

Division of Reactor Project -$/11 t

FROM:

Lawrence P. Crocker, Project Manager Project Directorate 11-3 Division of Reactor Projects - 1/II

SUBJECT:

DAILY HIGHLIGHT - FORTHCOMING MEETING WITH GEORGIA POWER COMPANY REGARDING THE ISI INSPECTION RESULTS AT HATCH' UNIT 1 i

DATE & TIME:

Tuesday, April 3, 1990 I:00 - 4:00 p.m.

,'l s

LOCATION:

One White Flint North 11555 Rockville Pike Rockville, MD l

Room 16-B-11 PURPOSE:

To' discuss the results-of Unit 1 ISI inspection and plans for crack repair. An agenda for the, meeting is enclosed.

f i

p(0l 900406041G 900329 ADOCK0500g1 on

L 1

)

)

l'.r. W. G. Hairston, III Edwin I. Hatch Nuclear Plant, Georgia Power Company Units Nos. I and 2 j

Cc:

f Shaw, Pittman, Potts and Trowbridge Mr. R. P. Mcdonald 2300 11 Street, N. W.

Cxecutive Vice President -

l Washington, D.C.

20037 Nuclear Operations

~

Georgia Power Company Mr. J. T. reckham P.O. Box 1295 i

Vice President - Plant Hatch Dirmingham, Alabama 35201 Georgia Power Coppany P.O. Box 1295 Mr. Alan R. Herdt, Chief Birmingham, Alabama 35201 Project Branch #3 U.S. Nuclear Regulatory Commission Mr. S. J. Dethey 101 Marietta Street, NW, Suite 2900 Hanager Licensing - Hatch Atlanta, Georgia 30323 Georgia Power Company P.O. Box 1295 Mr. W. C. Hairston, III-Birmingham, Alabama 35201 Senior Vice President Nuclear Operations Mr. H. C. Nix Georgia Power Company General Manager, Nuclear Plant P.O. Box 1295 Georgia Power Company Birmingham, Alabama 35201 Route 1, Box A39 Baxley, Georgia 31513 i

Resident Inspector U.S. Nuclear Regulatory Consnission Route 1, Box 725 Baxley, Georgia 31513 Regional Administrator, Region II U.S. Nuclear Regulatory Comission 101 Marietta Street, Suite 2900 Atlanta, Georgia 30323 Mr. Charles H. Badger Office of Planning and Budget Ecom 610 270 Washington Street, S.W.

Atlanta, Georgia 30334 Mr. J. Leonard Ledbetter, Director Environmental Protection Division Department of Natural Resources 205 Butler Street, S.E.,

Suite 1252 Atlanta, Georgia 30334 Chairman Appling County Commissior,ers County Courthouse Baxley, Georgia 31513

1:

! l

?

PARTICIPANTS *:

NRC UTILITY i

C Hermann Steve ~Betha (GPC) Ken McElroy (SCS)

W. Koo BobCowan(

PeteRiccardella(SIA)

L Crocker Robin Dyle 5)

BudSyx(GPC)

L F. Rinaldi Bud Epps (S l

J. Coley Gary Lof tus (SCS)

ORIGINAL $1GNED BY i

Lawrence P. Crocker, Project Manager Project Directorate 11-3 Division of Reactor Projects - I/II

Enclosure:

Agenda i

cc w/ enclosures See next page

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to *Open Meeting Statement of NRC i

Staff Policy, 43 Federal Register 28058,6/28/78.

i Ihj3 LA:PDII-3 F

l RIngramV L

mes UMetthews 3/g/90 l

3/gy90 3

90 OFFICIAL RECORD COPY Document Name: MEETING NOTICE 4/3

-- = -- ---

ry.

~

[

5 l.

L f+

[

4 I

i i

s.,

NPC/GPC MEETING l

HATCH UNIT I IGSCC INSPECTIONS

{

April 3, 1990 AGENDA

=

1.

OVERVIEW / MEETING MCELROY 11.

CLASS 1 IGSCC INSPECTIONS TO DATE MCELROY l

l A.

INITIAL SAMPLE' INSPECTIONS i

B.

INSPECTIONS RESULTS III.

EVALUATION Of INSPECTION RESULT 5 RICCARDELLA IV.

PROPOSED FIXES THIS OUTAGE RICCARDELLA j

V.

PROPOSED SCOPE EXPANSION RICCARDELLA f

VI..

FUTURE PLANS-UNIT I MCELROY A.

REMAINING IGSCC EXAMS THIS OUTAGE B.

OPTIONS FOR FUTURE STRESS IMPROVEMENT /0VERLAYS C.

HYDROGEN WATER CHEMISTRY COWAN VII.

SUMMARY

ALL k

3 e,

1

^

r f-o p

I in DISTRIBilTION FOR MEETING NOTICE DATED:. March 28, 1990 g

[

Facility: Hatch Unit 1 SW"A

- Local PDR.

t PDil-3 Readir.g l-J. Partinw 12-G-18 S. Varga 14-E-4 G. Lainas 14-H-3 I

D. Matthews 14-H-25 R. Ingram' 14-H-25

[

T. Reed 14-H-25 W. Lanning 11-E-22 DGC 15-B-18 r

E. Jordan MNBB-3302 Receptionist NRC Participants ACRS(10)

P-315 l ':

GPA/PA 17-F-2 V. Wilson 12-H-5 L. Thomas 12-E-4 B. Borchardt 17-G-21 K. Clark RII L. Reyes RII t

l l

f

)

f