Forwards Safety Evaluation Accepting Conclusions Contained in 15th-yr Reactor Bldg Tendon Surveillance Rept Dtd 880720. Util Should Perform Internal Engineering Evaluation of Containment to Verify Containment Integrity
ML20012E718
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/28/1990
From: Hebdon F
Office of Nuclear Reactor Regulation
To: Carns N
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20012E719 List:
References
TAC-69073, NUDOCS 9004060170
Download: ML20012E718 (3)


Text

f I

March 28, 1990 l

L.

yc Docket No. 50-313' i

I Mr. Neil S. Carns L

Vice President, Nuclear j

Arkansas Power and Light Company 1

L

,P. O. Box 551 Little Rock, Arkansas 72203

Dear Mr. Carns:

SUBJECT:

ARKANSAS NUCLEAR ONE, UNIT 1 FIFTEENTH YEAR REACTOR BUILDING TENDON SURVEILLANCE REPORT DATED JULY 20,1988(TACNO.69073) g The NRC staff has reviewed the subject report and the supplemental information provided by letter dated September 13, 1989, regarding the fifteenth year tendon l

L surveillance. The staff concurs with Arkansas Power and Light Connany's C

(AP&L's) conclusion that no abnormal degradation has occurred in tie reactor building post-tensioning system. Our detailed safety evaluation is enclosed, i

The staff suggests, however, that to further ensure the material condition and

' integrity of the post-tensioning system, AP&L should consider acceptance i

r criteria for free water content and grease void, and' establish actions _to be

'j taken when the criteria are not inet. An example of an action would be to perform an internal engineering evaluation of the containment and verify that containment integrity is maintained within 30 days of discovery that the acceptance criteria are not met.

Sincerely,

/s/

Frederick J. Hebdon, Director Project Directorate IV Division of Reactor Projects - III.

IV, Y and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

L

'As stated

.co m o 18'

_cc'w/ enclosure:

.gg See next page mo DISTRIBUTION JoiEsiM5Niw NRC PDR ex W

Local PDR PD4 Reading E>O G. Holahan MS 13E4 F. Hebdon f

P. Noonan T. Alexion OGC-Rockville E. Jordan MS MNBB 3701

^8$

=ACRS (10) MS P-315 PD4 Plant File

()\\

C. P. Tan

  • SEE PREVIOUS CONCURRENCES s W47LT
VD4/PM

-sYSGhTC-~~

M47D~ ~~~T

~ ~T ~ ~ ~

0FC e


:------------:------------:------------:--;-4------:----..------:---

NAME :PNoonan

TAlexion:bj :GBagchi
FHekon

'DATE 103/15/90

03/14/90
03/22/90
03/M,/90

)

0FFICIAL RECORD COPY Document Name: AN01 LTR/69073

' 8.((.

UNITED STATES

[

~.

NUCLEAR REGULATORY COMMISSION'

)

~$

WASHINGT ON, D. C. 20555 k., e'...

I March 28, 1990 4

L Docket I;o. 50-313 J

[

l L

h f

w Mr. Neil S. Carns i

Vice President, Nuclear i*

Arkansas Power and Light Company P. O. Box 551 Little Rock, Arkansas 72203

Dear Mr. Carns:

SUBJECT:

' ARKANSAS NUCLEAR OliE, UtilT 1 FIFTEENTH YEAR REAC10R BUILDING l

TENDON SURVEILLANCE REPORT DATED JULY 20,1988(TACN0.69073)

' The llRC staff has reviewed the subject report and the su)plemental infornation provided by letter dated September 13, 1989, regarding tie fifteenth year. tendon surveillance. The staff concurs with Arkansas Power and Light Com)any's (AP&L's) conclusion that no abnormal degradation has occurred in tie reactor building post-tensioning system. Our detailed safety evaluation is enclosed.

The staff suggests, however, that to further ensure the material condition and integrity of the. post-tensioning system, AP&L should consider acceptance criteria for free water content and grease void, and establish actions to be taken when the criteria are not met. An example of'an action would be to perform an internal engineering evaluation of the containment and verify that containn.ent integrity is maintained within 30 days of discovery that the acceptance criteria are not met.

p Sincerely, f,p & c (. 0 bbr-E Frederick J. Hebdon, Director l

Project Directorate IV L

Division of Reactor Projects - III, l

IV, Y and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated V.

l l

cc w/ enclosure:

See next page i

L l

g l?

t

7_

y,,

c

' c-e L

I Mr. Neil S. Carns Arkansas Power & Light Company Arkansas Nuclear One, Unit 1.

{

cc:

Mr. Early Ewing, General Manager L

Technical Support and Assessment Arkansas Nuclear One P.LO. Box 608.

Russellville, Arkansas 72801 Mr. Neil Carns Director NuclearOperatIons

~ Arkansas Nuclear One P. O. Box 608 Russellville, Arkansas 72801 i.

Mr. Nicholas S. Reynolds

. Bishop,- Cook, Purcell & Reynolds 1400 L Street, N.W.

Washington, D.C.

20005-3502 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division 1700 Rockville Pike, Suite 525 Rockville, Maryland 20852 Senior Resident Inspector U.S. Nuclear Regulatory Commission 1 Nuclear Plant Road Russellville, Arkansas 72801 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Office of Executive Director for Operations

.611 Ryan Plaza Drive Suite 1000

' Arlington, Texas 76011 Honorable Joe W. Phillips County Judge of Pope County Pope County Courthouse i.

Russellville, Arkansas 72203 Ms.' Greta Dicus Director DivisionofEnvIronmentalHealth Protection-4 Arkansas Department of Health j

4815 West Markam Street Little Rock, Arkansas 72201 l

1 I

l

)

r a

h