Summary of 900314 Meeting W/Jacobs Engineering Group in Albuquerque,Nm Re Groundwater Compliance Strategy at Durango Site
ML20012E489
Person / Time
Issue date: 03/23/1990
From: Randy Hall, Konwinski G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
REF-WM-48 NUDOCS 9004050259
Download: ML20012E489 (2)


Text

g-q 1

.{

,1

,a

es -

meg.

UNitto staves j -D NUCLEAR REOULATORY COMMISSION '

]

f.

l Roosom av k'

URANIUM AsCovsRY MsLo oPMCs

'i osNvsR.EoLEIco essas 1

r ~

n 231990 URF0:GRK -

Docket No. WM-48 1

,l

' \\

' MEMORANDUM FOR:

Docket File No. WM-48 j

i FROM:L Gary R. Konwinski Project Manager j

n.

1

SUBJECT:

MEETING MINUTES:

GROUND-WATER COMPLIANCE STRATEGY AT THE 4 '

DURANGO SITE

.A meeting was held lin Albuquerque,'New Mexico, on March 14 1990, with Jacobs Engineering Group, DOE's technical assistance contractor, to discuss the~

ground-water compliance strategy at the Durango site.

Compliance with the

(

s

' ground water protection standards and potential travel of. water through the~

U

. pile will rely.on the construction of the cap.

The cap will utilize a clay max layer, which has a laboratory hydraulic conductivity'of 10E-9 cm/sec.- - Due to this,. steady-state conditions will be developed about this flux value.

The clay max. layer and its ability.to limit water movement through'the tailings 1

.is very dependent upon the quality control associated with its installation.

i Currently, there are several.open issues, which have been forwarded to 00E by

?.

,perviou's correspondence, associated with the utilization of this material that DOE will;need to resolve prior to receiving NRC concurrence in;the cover design.

l It was agreed that this flux represented a reasonable value to base movement of

[

moisture through the reclaimed tailings. The 10E-9 cc:/sec value will be utilized to determine the rate seepage could be delivered to the ground-water system.

The' ground-water flow path will then be modeled to determine water

.uality at.the point of compliance wells.

q

-1

(

p J

Gary. Konwinski O

Project Manager Approved by:

k%

O' on E Thall I

,. Y

. Director

//

i 3

R:nm ~~

1 yls}.

}

PDC

]

~

t

'a

+

1:

a,r.,..... x..c. 2. -

...~w--4-~.-

.a

,e c.,

~,.

4 4

eo,.

?,

.y WM-48/GRK/90/03/16/MTG DISTRIBUTION Docket File WM-48

POR/DCS'.

.URF0 r/f

-A8 Beach, RIV LLO Branch, LLWN

.ik

.h.

.GKonwinski

'y@'

DJacchy RCPD, NM EMontoya, EID,'NM

. c N

i F

,i CONCURRENCE:

DATE:

GKonwinski/URF0/1v Nk 3' %

i i

DJacoby/URF0 k'

EA{%

EHawkins/URF0 9o e

L.

REHall/URF0 e

e I

l' i

es 6

'(

i.:

l 3 i I

. l{ E I,i i

.. s; de :

7 so, l

' f

'