j VIHOINIA E1.ECTHIC AND l'OWI:H COMPANY Hwnwoxo,VmorxsA cause i
March 23, 1990 U.S. Nuclear Regulatory Commission Serial No.:
89 660 Attention: Document Control Desk NL&P/JYR Washington, D.C. 20555 Docket Nos.: 50 338 50 339 i
License Nos.: NPF 4 NPF 7 i
Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 PROPOSED TECHNICAL. SPECIFICATION CHANGE REQUEST TO REMOVE THE 3.25 LIMIT FOR EXTENDING SURVEILLANCE INTERVALS AND TO ALLOW A 24 HOUR PERIOD TO COMPLETE A MISSED SURVEILLANCE REQUIREMENT f
l Pursuant to 10 CFR 50.90,. Virginia Electric and Power Company requests
[
amendments, in the form of changes to the Technical Specifications, to Operating License Numbers NPF 4 and NPF 7 for North Anna Power Station Units 1 and 2, respectively. These amendments will remove the 3.25 limit on extending surveillance intervals required by Technical Specification 4.0.2 for both North Anna units as encouraged by NRC Generic Letter 8914. In addition, this amendment will extend l
Technical Specification 4.0.3 to allow a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period to complete a missed surveillance requirement before entering into the applicable action statement in accordance with NRC Generic Letter 87 09. The proposed Technical Specification t
L changes are provided as Attachments 1 and 2.
The proposed change will have no adverse affect on operation of the facility. The proposed change will improve the scheduling of surveillance activities and allow t
surveillance activities to be postponed when plant conditions are not suitable for their conduct. Implementation of the proposed change to the surveillance requirements will require no hardware modifications and subsequent operation of the facility will not change the results of any accident analyses described in the Updated Final Safety Analysis Report (UFSAR). Attachment 3 provides a discussion of the proposed charge and a 10 CFR 50.92 evaluation.
This request has been reviewed by the Station Nuclear Safety and Operating Committee and it has been determined that this request does not involve an unreviewed safety question as defined in 10 CFR 50.59 or a significant hazards consideration as defined in 10 CFR 50.92.
I 9003286344 900323 I
Q)S hDR ADOCK 05000338 PDC
i 1
i VIHOINIA ELucrute Axu Pownw Cownwxy i
H arnwoun,VikulNIA UDD61
[
i Should you have any questions or require additional information, please contact us.
Very truly yours, 1
W. L. Stewart Senior Vice President - Nuclear Attachments 1.
Proposed Technical Specification Change for North Anna Unit 1 2.
Proposed Technical Specification Change for North Anna Unit 2 3.
Discussion of Proposed Changes and 10 CFR 50.92 Evaluation oc:
U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, N.W.
Suite 2900 i
Atlanta, Georgia 30323 Mr. J. L. Caldwell NRC Senior Resident inspector North Anna Power Station Commissioner Department of Health Room 400 109 Governor Street Richmond, Virginia 23219 1
1 COMMONWEALTH OFVIRGINIA )
)
COUNTYOFHENRICO
)
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by W. L. Stewart who is Senior Vice President - Nuclear, of Virginia Electric and Power Company.
He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this O day of,
- sl/
, 19fa.
My Commission Expires: // dh 8/
__, 19 k 0
hk_Y Suz-Notary public ~~
l l
1 (SEAL)
!