Forwards Insp Rept 50-382/90-04 on 900201-28 & Notice of Violation.Violation B Cited Due to Licensee Failure to Promptly Evaluate & Implement Corrective Actions for post-maint Testing Program Weaknesses
ML20012D126
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/20/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20012D127 List:
References
NUDOCS 9003260499
Download: ML20012D126 (4)


See also: IR 05000382/1990004

Text

'

!

,

o

i

'.

.

MR 20 WD

j

In Reply Refer To:

.

Docket: 50-382/90-04

l

>

!

Louisiana Power & Light Company

.

ATTN:

J. G. Dewease, Senior Vice President

Nuclear Operations

-

317 Baronne Street

.

'

New Orleans, Louisiana 70160

' Gentlenen:

-

This mfers to the inspection conducted by Messrs. W. F. Smith, S. D. Butler,

R. C. Haag, and R. B. Vickrey of this office during the period February 1-28,

1990, of activities authorized by NRC Operating License NPF-38 for Waterford

!

Steam Electric Station, Unit 3, and to the discussion of our findings with

Mr. J. R. McGaha and other members of your staff at the conclusion of the

inspection.

+

'

A nas examined during the inspection included plant status, onsite followup of

events, monthly maintenance observation, monthly surveillance observation,

operational safety verification, and licensee event report followup. Within

these areas, the inspection consisted of selective examination of procedures

and representative records, interviews with personnel, and observations by the

,

'

NRC inspectors.- The inspection findings are documented in the enclosed

inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to mspond to

i

.this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2 Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter. Although Violation B could have

been a candidate for no citation in accordance with NRC enforcement policy, it

'

was cited in this instance because of failure to promptly evaluate and

implenent corrective actions for postmaintenance testing program weaknesses.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 7 of the enclosed report.

The response directed by this letter and the accompanying Notice is not subject

4

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

18R 2ggg g ggg g

I

Q

PTC

Lk*

0pe

R&IV:RRNV:

I

lih

RIV:0PS/t

RIV: SRI /p

C:DRP/A

SDButler

RCHaag

RBVickrey

WFSmith

DDChamberlain

li

03/f/90

03//f/90

03/11-/90

03/ft/90

03/g/90

/

%

.

,----..e

.+,,...u,

. - , . . . -

-..--- --

-

(-

-

l

c

..

s

['

i

Louisiana Power & Light Company

-2-

Should you have any questions concerning this inspectien, we will be pleased to

discuss them with you.

Sincerely.

Original Signed By:

Sa'nuci J. Comas

Samuel J. Collins, Director

Division of Reactor Projects

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-382/90-04

cc w/ enclosures:

Louisiana Power & Light Company

ATTN:

R. P. Barkhurst, ? ice President

Nuclear Oparations

P.O. Box B

-K111ona Louisiana 70066

Louisiana Power & Light Company

ATTN:

J. R. McGaha, Jr., Plant Manager

P.O. Box B

K111ona, Louisiana 70066

.

Louisiana Power & Light Cerr.pany

ATTN:

L. W. Laughlin, Site

Licensing Support Supervisor

P.O. Box B

Killona, Louisiana 70066

i

Louisiana Power & Light Company

ATTN:

G. M. Davis, Manager, Events

Analysis Reporting & Response

P.O. Box B

K111ona, Louisiana 70066

Monroe & Leman

ATTN:

W. Malcolm Stevenson, Esq.

201 St. Charles Avenue, Suite 3300

New Orleans, Louisiana 70170-3300

i

Shaw, Pittman, Potts & Trowbridge

ATTN: Mr. E. Blake

l

2300 N Street, NW

Washington, D.C.

20037

.

,.

-

-

,e

y

,

'

k

,

..

,

,

.,

1

Louisiana Power & Light Company-

-3-

j

1

Middle South Services. Inc.

ATTN: Ralph'T. Lally, Manager

of Quality Assurance

'

P.O. Box 61000

,

New Orleans, Louisiana 70161

,

,

Chairman

Louisiana Public Service Commission-

One American Place, Suite 1630

Baton Rouge, Louisiana 70825-1697

,

Louisiana Power & Light Company

i

ATTN:

R. F. Burski, Manager, Nuclear

l

Safety and Regulatory Affairs

'

317.Baronne Street

New Orleans, Louisiana 70112

>

Department of Environmental Quality

_

ATTN: William H. Spell, Administrator

l

'

Nuclear Energy Division

P.O. Box 14690

Baton Rouge, Louisiana 70898

President, Police Jury

l

'

St. Charles Parish

l

Hahnville Louisiana 7005/

Mr. William A. Cross

Bethesda Licensing Office

3 Metro Center

Suite 610

,

Bethesda, Maryland 20814

U.S. Nuclear Regulatory Comission

ATTN: Resident Inspector

P.O. Box 822

Killona, Louisiana 70066

U.S. Nuclear Regulatory Comission

ATTN: Regional Administrator, Region IV

611 Ryan Plaza Drive Suite 1000

Arlington, Texas 76011

bcci

(seenextpage)

- - - - -

.

..

_ ..

- ..

e

i

u

..

s ,.

,

Louisiana Power & Light Company

-4-

l

bec to DMB (IE01)

i

bec distrib. by RIV:

'

i

i

  • R. D. Martin
  • Resident Inspector

i

  • SectionChief(DRP/A)
  • DRP

.

i

  • DRSS-FRPS
  • MIS System
  • Project Engineer (DRP/A)
  • RSTS Operator

,

  • RIV File
  • DRS

,

  • D. Wigginton, NRR Project Manager (MS:

13-D-18)

Lisa Shea, RM/ALF

,

  • w/766

i

i

i

s

.-, ,

- -

--

- - , - - - . - .

, - - -

--