Monthly Operating Rept for Feb 1990 for Jm Farley Nuclear Plant,Unit 1
ML20012C115
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/28/1990
From: Hairston W, Dennis Morey
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9003200122
Download: ML20012C115 (5)


Text

-

r

'/

j Alabima Powir Comp:ny

.i :.

40 lnverniss C;ntir Parkway -

Post Office Box 1295 '

. Okmingham, Alabama 35201 Telephone 205 B68-5581 -

i

'}

W. G. Hairston, til Senior Vice President Numar Opernhons AlabamaPower March 13, 1990 the southern electresystem f

.f Docket No. 50-348 U. S. Nuclear Regulatory Colmtission ATIN: Document Control Desk Washington, D. C.

20555 Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached is the February 1990 Monthly Operating Report for Joseph M. Farley Nuclear Plant. Unit 1, required by Section 6.9.1.10 of the Technical Specifications.

.If you have any questions, please advise.

Respectfully submitted,

^

A 1r

,II JGS:sme/1.6 Attachment cc: Mr. S. D. Ebneter Mr. E. A. Reeves Mr. G. F. Maxwell l

'ff[2gjjy $

y,,

R

\\

.o

?

I, r

3,, +

p, r

p r

5*'

JOSETH M. FARIEY NUCLFAR PLANT-F4 UNIT-1 b

NARRATIVE StbMARY OF OPERATIONS -

February, 1990 Ji

.r i

t

~3 k

There was one significant power ruluction during the nonth of February.-

i On February 16,-reactor power was reduced to allow contaminants to return

.'from hideout on the secondary side of.the steam generators. 'This hideout 1

h return is intended to, reduce degradation of the steam generator tubes. The r

unit returned to full power operation on February,19.

1 The following nnjor-safety-related maintenance was performed in the nonth--

I of February:

1.. The pump and bearings-were replaced-on the IB diesel generator.

I turbocharger.

2.

A leak was repaired on the turbine driven auxiliary feedwater pump.

[

W 3.

The 18-month. inspection was performed on the 10 diesel generator.

f 4.

Corrective and preventive maintenance was performed on the 10 s

charging pump.

5.

A service water' vent valve leak was repaired on the A. train control, r +

p

' room ventilation.

6.

Miscellaneous corrective and preventive maintenance was performed on the diesel generators.

t t

[.'

I f

L.

1 OPERATING DATA REPORT DOCKET NO.

50-348 DATE 3/2/90 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 CPERATING STR1US Notes

1. Unit Name:

Joseph M. Farley - Unit 1

2. Reporting Period:

February 1990

1) Cumulative data since
3. Licensed thermal Power ( M t):

2,652 12-1-77, date of 4.-Nameplate Rating (Gross We):

860 comercial operation j

5. Design Electrical Rating (Net MWe): 829 6.' Maximum Dependable Capacity (Gross W e):

866.1

7. Maximum Dependable capacity (Net MWe):

823.7

8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr-to-Date Cumulative

11. Hours In Reporting Period 672 1,416 107,352
12. Number Of Hours Reactor Was Critical 672.0 1,416.0 81,674.4
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Hours Generator On-Line 672.0 1,416.0 80,126.2
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,652,567 3,622,759 204,776,675
17. Gross Electrical Energy Generated (MWH) 538,460 1,184,788 65,949,938
18. Net Electrical Energy Generated (MWH) 509,652 1,123,942 62,218,908
19. Unit Service Factor 100.0 100.0 74.6
20. Unit Availability Factor 100.0 100.0 74.6

(_

21. Unit Capacity Factor (Using MDC Net) 92.1 96.4 71.8 l
22. Unit Capacity Factor (Using DER Net) 91.5 95.7 69.9
23. Unit Forced Outage Rate 0.0 0.0 7.9
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A l

l

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09M7 TNITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 Form 2/34 1

n DOCKET NO.

50-348 I

MTE March 2,1990 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 i

Mormi rebruary MY AVERAGE MILY POWER LEVEL DAY AVERAGE MILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 826 17 59 2

821 18 107 1

3 820 19 774 l

4 822 20 826 5

829 21 826 i

6 828 22 824 7

827 23 827

)

i 8

827 24 829 9

819 25 832 10 824 26 828 j

11 828 27 827 12 829 28 827 13 827 29 14 823 30 15 823 31 16 821 INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in l

the reporting month. Compute to the nearest whole megawatt.

L l

l l

Form 13/21 l

._.___________________________________________..__j

UNIT SRUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-364 UNIT MAME J. M. FARLEY - UNIT 1 DATE March 2, 1990 COMPLETED BY-D. N. MOR"!Y REPORT MONTH Februar?

TELEPHONE (2051899-5156 l

l l

j' l

l METHOD OF l LICENSEE l l

l CAUSE & CORRECTIVE l

l l

l l DURATION l l SRUTTING l EVENT l SYSTEM l COMPONENT l

ACTION TO lNO.

l DATE l TYPE l (HOURS) l REASON l DOWN REACTOR l REPORT $ l CDDE l CODE l

PREVENT RECURRENCE

.l' l

I l

i I

I I

l l

l 1

l 031 1900216 l 8

1 00 1

8 I

N/A l

N/A l AB l

SG l --

l Power was reduced to allow contaminants to return l'

I I

l l

l l

l l

l lf tom hideout on the secondary side of the steam' l

l 1

l l

l l

l l

l generators.

I I

I I

I I

I I

I i

.l' 1

I I

I I

I I

I I

I 1

i i

I I

l I

i 1.

1 I

i I

I I

I i

l l

1 1

1 1..

'i.

1 I

I I

i l

1 1

1 I

i 1

1 1

1 I

I I

I I

I i

I I

i 1

1 1

I I

i

<l I

I I

I i

1 1

I I

I I:

1 I

i 1

i i

i l

i i

l --

i l

i I

I I

I I

i 1

l l

i l

i I

I I

i 1

1 i

i l

i i

i l

i i

1 I

I I

i i

l i

I I

I I

I I

I I

I I

I I

I I

i 1

I I

I I

I I

l' I

I I

I 1

i i

i l

I I

l i

I I

I i

1 1

I l

l I

I I

I I

I I

I I

I 1

i 1.

I I

I I

I I

i i

1 I

i i

I I

i l

I I

1 1

1 1

1 i

I I

I I

I I

I I

I I

I I

F: Forced Reason:

Method:

  • Exhibit G-Instrt:ctions S: Scheduled A-Equipment Failure (Explain) 1-Manual' B-Maintenance or Test for Preparation of Data 2-Manual Scram.

C-Refueling Entry Sheets for Licensee 3-Automatic Scram.

D-Regulatory Restriction Event Report (LER) File (NUREG-4-Other (Explain) 0161) i E-Operator Training & License Examination F-Admin!strative Exhibit I -Same Source G-operational Error (Explain)