filELECTRIC March 9, 1990
]
EOY$,5o 1 -
U.- S. Nuclear Regulatory Comission l
' Attn: Document Control Desk Washington, D. C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NO. 50-445 MONTHLY OPERATING REPORT FOR FEBRUARY 1990 i
Gentlemen:
Attached is the Monthly Operating Report for February 1990 pre)ared and submitted pursuant to Specification 6.9.1.5 of Appendix A (Tecinical Specifications) to the Comanche Peak Unit 1 Steam Electric Station Operating License.
Sincerely, illiam.J. Cahi'il, Jr.
BSD/bsd Attachment c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)
?
1 lib 9003190243 900229 PDR ADOCK 05000445 R
PDC l
400 North Olive Street LB. 81 Dallas, Texas 75201
ej, ~*[
I CONANCEE PEAR STEAN ELECTRIC STATION, UNIT 1 NRC MONTELY OPERATING REPORT l
DOCKET NO:
50-445 l
Attachment to TXX-90104 Page 1 of 3 UNIT:
CPSES 1 7 ATE:
March 5, 1990 COMPLETED BY:
Dennis Buschbaum TELEPHONE:
817-897-5851 l
CPERATING STATUS
- 1. Reporting Period:
February 1990 Gross hours in reporting period:
672
- 2. Currently authorized power level (MWt): _170 Max. depend. capacity (MWe-Net):
1130 Design electrical rating (MWe-Net):
1130
- 3. Power level to which restricted (if any) (MWE-Net):
0
[
- 4. Reasons for restriction (if any):
Startup Phase - Low Power License
{
L THIS NONTE YR TO DATE CUNULATIVE
- 5. Number of hours reactor was critical 0
0 0
- 6. Reactor reserve shutdown hours 0
0 0
- 7. Hours generator on line 0
0 0
l'
- 8. Unit reserve shutdown hours 0
0 0
P. Gross thermal energy generated (MWH) 0 0
0
- 10. Gross electrical energy generated (MWH) 0 0
0 l
l
- 11. Net electrical energy generated (MWH) 0 0
0
- 12. Reactor service factor NA NA NA
- 13. Reactor availability factor NA NA NA
- 14. Unit service factor NA NA NA
- 15. Unit availability factor NA NA NA
- 16. Unit capacity factor (Using MDC)
NA NA NA
- 17. Unit capacity factor (Using Design MWe)
NA NA NA
- 18. Unit forced outage rate NA NA NA
- 19. Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):
i l'
1.
- 20. If shut down at end of report period, estimated date of startup:
See item 21 L
- 21. Units in test status (prior to commercial operation): FORECAST ACHIEVED p
Initial Criticality 900403 Initial Electricity 900501 I
Commercial Operation 900721 1 -
w
__,,,_._,__m w
,e--
,of j.o
- AVERAGE DAILY UNIT POWER LEVEL Attachment to TXX-90104 DOCKET-NO:
50-445 f
Page 2 of 3 UNIT:
CPSES 1 t
I DATE:
March 5, 1990 COMPLETED BY:
Dennis Buschbaum TELEPl!ONE:
817-897-5851
[
t NONTN February 1990 i
DAY AVERAGE DAILY POWER LEVEL
- DAY AVERAGE DAILY POWER LEVEL (NWe-Net)
(NWe-Net) 1 17 2_
18 3
19 I
4 20 5
21 6
22 7.
23 8
24 9
25 10 26 11 27 12 28 13 29 14 30 15 31 16 0 Startup Phase - prior to initial criticality.
No Net Electrical Generation.
6
3 I.
DOCKET NO:
50-445 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT:
CPSES 1
.I' DATE:
March 5, 1990 COMPLETED BY:
Dennis Buschbaum TELEPHONE:
817-897-5851 REPORT MONTE February 1990 l
m>
METHOD OF g
TYPE SHUTTING DOWN
- g F: FORCED DURATION THE REACTOR OR w if '
NO.
DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS Q
900201 S
672.0 H
4 Unit in Startup Phase prior g
to initial criticality.
s E-N E
=
i 1990.
Initial Fuel Load and Entry
SUMMARY
Low power Operating License received February 8, into MODE 5 completed on February 17, 1990.
A challenge to a RCS PORV (Low Temperature Overpressure Protection) occurred on 2/21/90 during RCS fill and vent Special Report 1-SR-90-002 to follow..
.