Monthly Operating Repts for Feb 1990 for Beaver Valley Units 1 & 2
ML20012B936
Person / Time
Site: Beaver Valley
Issue date: 02/28/1990
From: Sieber J, Winger M
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9003190188
Download: ML20012B936 (9)


Text

' ' '

i e

i e

V ]t?9 j

t i

i

'Af Telephone (di?) 393.f000 Nucient Group e'.O Box 4 j

snippinoport rw isorraos 14 arch 7,1990 l

P Beaver Valley Power Station Unit 1 - Docket lio. 50-334, License 110. DPR-66 Unit 2 - Docket lio. 50-412, License lio. NPF-73 Monthly Onoratim Report i

1

?

U. S. !!uclear Regulatory Commission W e nt Control Desk Washington, D.C.

20555 i

Gentlemen In accordanoo with Appendix A,

Technical Specifications, the Monthly Operating Report is submitted for Unit 1 and Unit 2 for the month of February, 1990.

1 r

Very truly yours, l

l d,

ANV l

. D. Sieber i

Vice President 1

Nuclear Gruup l

MAW /lm3 i

Enclosures cc: NRC Regional Office King of Prussia, PA 9003190188 900228 0

l k

'4 PDR ADOCK 05000334

(

R; PDC

(,

y,

m. y---

.,u,.j c t',<,-?.lo,,

~

mmny.

J

.l M3FIHLY OPERATDIG EXPERIDG i

).i UNIT I I

i i

FEBRUARY 1990 i

I

i

' February 1 a

'Ihe Unit operated' at a runinal value'of 100% output.

i

.t rou$t l

h February 2s

- j x,.

.j i

e q

l

'f

+

j r

l-t-

p 1,-,

8

-l

~t l

l. '-

h

.I i

t

( c.

u

.}

6 e

L l

?

-T r

5

't 1.?

(

l1 s

k k

l, t

e L

I r

s h

[

t i;

- ~.

i r

K

.f 1

i,

. j t

)

-t

\\.: -

e

_h y'

r t.)'.'-',

..-~~:.

4.

i O

tfuti SMUTDOWuS AWO POWE2 REDUCTtoeS Docket me.

50-334 Unit name 8vFS tmit et Date march L 1990 Completed By m.m. Winner REPORT nouTN FEstuaRY 1990 Telephone- (612) 393-T621 Method of Licensee cause & Corrective Duration Shutting Event System Component Action to no.

Date Typei (mours)

Reason 2 Down Reactor 3 Report 8 Code'

_ Cedes Prevent Recurrence monE 1

2 3

4 F-Forced Reason:

Method:

Exhibit G-Instructions for S-Scheduled A-Equipment Failure (Emplain) 1-Manual Preparation of Data Entry sheets 8-Maintenance or Test 2-panuet scram for Licensee twent Report (tER) File C-Refueting 3-Automatic scree (mueEC016T).

O-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Emme 5-Reduction 5

T-Administrative 9-Other Exhibit I-Same source.

G-Operational Error (Explain)

H-Other (Emptain) i i

--w

~

~

mm m

..m,.

AVERAGE DAILY UNIT 10WER LEVEL 4

l Eccket No.

50-334 Unit BVPS Unit 1 Date March 7. 1990 Cocpleted by M. A. Wirner

{

Telephone (412) 393-7621

!Off1H Febrimtv 1990 L

lc taY AVERAGE DAILY ICWER IIVEL CAY AVERAGE [AILY KMER IIVEL

(!We-Net)

(!We-!kt) i

[.

1

'B29 17 825 2-829 18 821 i

3 825 19 4

825 i

4 829 20 833 5

833 21 825 6

829 22 825 7

829 23 821

[

I 8'

825 24 833 i

9 825 25 825 10 825 26 825

' 11 825 27 821 12 829~

28 825' 13 825 29 N/A l-14 825 30 N/A

= 15 829 31 N/A 16 811 INSTRUCTIONS On this format, list the average daily unit power level in M4e-Nat for each day in the reporting month. Cmpute to the nearest whole megawatt.

m

.o OPERATING DATA REPORT DOCKET NO.:

50 334 REPORT DATE:

03/07/90 COMPLETED BY: M.A. WINCER TELEPHONE:

(412) 393 7621 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: FEBRUARY 1990
3. LICENSED THERMAL F0WER (MWt):

2660

4. NAMEPIATE RATING (Cross MWe):

923

5. DESIGN ELECTRICAL RATING (Not MWe):

835

6. MAX, DEPENDABLE CAPACITY (Cross MWe):

860

7. MAX. DEPENDABLE CAPACITY (Not MWe):

810 8.- IF CHANCES OCCUR IN CAPACITY RATINGS SINCE 1AST REPORT, CIVE REASONS:

o

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS fDR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

672.0 1416.0 121248.0

12. NO. OF HRS. REACTOR WAS CRITICAL:

672.0 1373.8 73512.3 l

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 4482.8

14. HOURS CENERATOR WAS ON LINE:

672.0 1368.4 71835.9

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0 16.~ CROSS THERMAL ENERGY GEN. (MWH):

1766224.0 3483686.0 169563741.5

17. CROSS ELECT. ENERGY GEN. (MWH):

586430.0 1152450.0 54422139.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

555070.0 1088010.0 50785160.0

19. UNIT SERVICE FACTOR: (PERCENT) 100.0 96.6 61.5
20. UNIT AVAI! ABILITY FACTOR:(PERCENT) 100.0 96.6 61.5
21. UNIT CAPACITY FACTOR (MDC): PCT 102.0 94.9 54.7
22. UNIT CAPACITY FACTOR (DER): PCT 98.9 92.0 53.0
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 3.4 17.3
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL C?.ITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

i

~

NARRATIVE SUPT %RY OF i

H3ffIHLY OPERATDJG D:PERIDiCE i

UNIT II L

FEBRUARY 1990 I

i l

February 1

%e Unit operated at a nominal v.elue of 85% output in a i

cycle stretch out mode.

February 2 At 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> the Unit's output was reduced to 30% to pennit j

repairs to the Unit's main feedwater flow control valves.

February 3

%e Unit operated at 30% output to pennit' repairs to the f

through Unit's main feedwater flow control valves.

February 4 February 5 At 1010 hours0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.84305e-4 months <br /> the Unit's output was escalated to 50% to I

stletch the currunt fuel cycle.

February 6 2e Unit operated at 50% output in a cycle stretch out modo, i

through February 11 February 12 At 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> the Unit's output was escalated to 90% to stretch the current fuel cycle.

February 13 Se Unit operated at 90% output in a cycle stretch out mode.

through February 15 February 16 At 0721 hours0.00834 days <br />0.2 hours <br />0.00119 weeks <br />2.743405e-4 months <br /> the Unit's output was increased to 100%. At 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br /> the Unit's output was reduced to 50% to stretch the current fuel cycle.

February 17 S e Unit operated at 50% output in a cycle stretch _out mode.

through February 18 February 19 At 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> the Unit's output was escalated to 90% to stretch the current fuel cycle.

February 20 he Unit cperated at 90% output in a cycle stretch out modo.

.through i

February 23 February 24 At 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br /> the Unit's output was reduced to 85% to stretch the current fuel cycle.

February 25 h e Unit operated at 85% output in a cycle stretch out mode.

through February 28

UWIT SNUID0ves AWD PoufR REDUCTIOuS Docket so.

50-412' Unit Name aves unit 82 Date march 7. 1990 Completed By R.A. utneer REPORT MouTM FEBRUARY 1990 Tetephone _t412) 393-7621 Method of Licensee Cause & Corrective Duration shutting Event System Component Action to-No.

Date Typel (Nours)

Reason 2 Doun Reector3 Report 8 Code' Code 5 Prevent Recurrence 1

900202 S

O 8

5 N/A CN VALVEN Output reduced to 30% to permit mainte.,ance on the mein feedmater flou contret valves.

2 900205

.S 0

N 5

N/A ZZ ZZZZZZ Unit's output reduced to 50% to stretch the current fuel cycle.

3 900216 5

0 M

5 N/A ZZ ZZZZZZ Unit's autput reduced to 50% to -

stretch the current fuel cycle.

1 2

3 4

F-Forced Reason:

Method:

Exhibit G-Instructions for S-Scheduled A-Equipment Failure (Emptain) 1-Manual Preparation of Cata Entry Sheets 8-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File C-Refueling 3-Automatic Scram

(#UREG0161).

D-Regulatory Restriction 4-Cont'd. from Previous Month j

'E-Operator Training & License Emam 5-Reduction 5

F-Administrative 9-Other Exhibit I-Same Source.

G-Operational Error (Emplain)

N-Other (Emplain) tm.__

7--

3

(

s AVERAGE IRILY UNIT PDWER IIVEL i

l'[

Docket No.

50-412

' ~

Unit BVPS Unit 2 Date March 7,1990 Ccatpleted by M. A. Winaer e

hiephone (412)393-7621 i

M271N February 1990

[RY AVERAGE IAILY POWER IEVEL DAY AVERAGE DAILY POWER IIVEL (1+1e-Net)

(MWe-Net) i 1

704 17 360 2

667 18 340 3

187 19 648

.l 4

156 20 739 5

261 21 733 6

352 22 729 7

344 23 733 8

344 24 368 9

336 25 385

'10 348 26 722 11 357 27 693 12 648 28 693 13 721 29 N/A

-14 729 30 N/A 15.

728 31 N/A 16 749 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Cartpute to the nearest whole megawatt.

r

{

L

- c I

4 OPERATING IATA REPORP DOChTT NO.:

50-412 REPORT IATE: 03/07/90 OCHPIETED BY: M.A.WINGER t

TEIDHONE:

(412) 393-7621 b

OPERATING ETTA'IUS i

1. UNIT NAME: SEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: FEBRUARY 1990
3. LICENSED THERMAL POWER (MWt):

2660

4. NAMEPLATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

836

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

885

7. MAX, DEPENDABLE CAPACITY (Net MWe):

833

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (Net MWe):

None i

l'. REASONS FOR RESTRICTIONS, IF ANY:

N/A O

THIS MONTH YEAR TO DATE CUMULATIVE e

11. HOURS IN REPORTING PERIOD:

672.0 1416.0 20031.0

12. NO. OF HRS. REACTOR WAS CRITICAL:

672.0 1416.0 16972.8

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

+

14. HOURS GENERATOR WAS ON LINE:

672.0 1416.0 16842.9

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GEN. (MWH):

1194673.0 2881394.0 41694138.4

17. CROSS ELECT. ENERGY GEN. (MVH):

380400.0 934800.0 13400900,0

18. NET ELECTRICAL ENERGY GEN. (MVH):

354590.0 878481.0 12634956.0

19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 84.1
20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 100.0 84.1
21. UNIT CAPACITY FACTOR (MDC): PCT 63.3 74.5 75.7 t
22. UNIT CAPAC">Y FACTOR - (DER): PCT 63.1 74.2 75.5
23. UNIT FORCEb OUTACE RATE: (PERCENT) 0.0 0.0 6.2
24. SHUTDOWNS SCHEDULED OVER NEXT SI" MONTHS (TYPE,DATE. AND DURATION OF EACH):

_ THE UNITS SECOND REFUELING OUTAGE *iS SCHEDULEG_ TO BEGIN EARLY SEPTEMBER 1990 AND IS SCHEDULED TO BE FINISHED-IN NQVEMBER 1990.

25. IF SHUT DOWN AT END OF REPORT PERIOD. ESTIKATED DATE OF STARTUP:

26, UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

1 FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 4

- - - - - ~

--