ML20012B936
| ML20012B936 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 02/28/1990 |
| From: | Sieber J, Winger M DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9003190188 | |
| Download: ML20012B936 (9) | |
Text
' ' '
i e
i e
V ]t?9 j
t i
i
'Af Telephone (di?) 393.f000 Nucient Group e'.O Box 4 j
snippinoport rw isorraos 14 arch 7,1990 l
P Beaver Valley Power Station Unit 1 - Docket lio. 50-334, License 110. DPR-66 Unit 2 - Docket lio. 50-412, License lio. NPF-73 Monthly Onoratim Report i
1
?
U. S. !!uclear Regulatory Commission W e nt Control Desk Washington, D.C.
20555 i
Gentlemen In accordanoo with Appendix A,
Technical Specifications, the Monthly Operating Report is submitted for Unit 1 and Unit 2 for the month of February, 1990.
1 r
Very truly yours, l
l d,
ANV l
. D. Sieber i
Vice President 1
Nuclear Gruup l
MAW /lm3 i
Enclosures cc: NRC Regional Office King of Prussia, PA 9003190188 900228 0
l k
'4 PDR ADOCK 05000334
(
R; PDC
(,
y,
- m. y---
.,u,.j c t',<,-?.lo,,
~
mmny.
J
.l M3FIHLY OPERATDIG EXPERIDG i
).i UNIT I I
i i
FEBRUARY 1990 i
I
- i
' February 1 a
'Ihe Unit operated' at a runinal value'of 100% output.
i
.t rou$t l
h February 2s
- j x,.
.j i
e q
l
'f
- +
j r
l-t-
- p 1,-,
8
-l
~t l
l. '-
h
.I i
t
( c.
u
.}
6 e
L l
?
-T r
5
't 1.?
- (
l1 s
k k
l, t
e L
I r
s h
[
t i;
- ~.
i r
K
.f 1
i,
. j t
)
-t
\\.: -
e
_h y'
r t.)'.'-',
..-~~:.
4.
i O
tfuti SMUTDOWuS AWO POWE2 REDUCTtoeS Docket me.
50-334 Unit name 8vFS tmit et Date march L 1990 Completed By m.m. Winner REPORT nouTN FEstuaRY 1990 Telephone- (612) 393-T621 Method of Licensee cause & Corrective Duration Shutting Event System Component Action to no.
Date Typei (mours)
Reason 2 Down Reactor 3 Report 8 Code'
_ Cedes Prevent Recurrence monE 1
2 3
4 F-Forced Reason:
Method:
Exhibit G-Instructions for S-Scheduled A-Equipment Failure (Emplain) 1-Manual Preparation of Data Entry sheets 8-Maintenance or Test 2-panuet scram for Licensee twent Report (tER) File C-Refueting 3-Automatic scree (mueEC016T).
O-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Emme 5-Reduction 5
T-Administrative 9-Other Exhibit I-Same source.
G-Operational Error (Explain)
H-Other (Emptain) i i
--w
~
~
mm m
..m,.
AVERAGE DAILY UNIT 10WER LEVEL 4
l Eccket No.
50-334 Unit BVPS Unit 1 Date March 7. 1990 Cocpleted by M. A. Wirner
{
Telephone (412) 393-7621
!Off1H Febrimtv 1990 L
lc taY AVERAGE DAILY ICWER IIVEL CAY AVERAGE [AILY KMER IIVEL
(!We-Net)
(!We-!kt) i
[.
1
'B29 17 825 2-829 18 821 i
3 825 19 4
825 i
4 829 20 833 5
833 21 825 6
829 22 825 7
829 23 821
[
I 8'
825 24 833 i
9 825 25 825 10 825 26 825
' 11 825 27 821 12 829~
28 825' 13 825 29 N/A l-14 825 30 N/A
= 15 829 31 N/A 16 811 INSTRUCTIONS On this format, list the average daily unit power level in M4e-Nat for each day in the reporting month. Cmpute to the nearest whole megawatt.
m
.o OPERATING DATA REPORT DOCKET NO.:
50 334 REPORT DATE:
03/07/90 COMPLETED BY: M.A. WINCER TELEPHONE:
(412) 393 7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: FEBRUARY 1990
- 3. LICENSED THERMAL F0WER (MWt):
2660
- 4. NAMEPIATE RATING (Cross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Not MWe):
835
- 6. MAX, DEPENDABLE CAPACITY (Cross MWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Not MWe):
810 8.- IF CHANCES OCCUR IN CAPACITY RATINGS SINCE 1AST REPORT, CIVE REASONS:
o
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS fDR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
672.0 1416.0 121248.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
672.0 1373.8 73512.3 l
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS CENERATOR WAS ON LINE:
672.0 1368.4 71835.9
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 16.~ CROSS THERMAL ENERGY GEN. (MWH):
1766224.0 3483686.0 169563741.5
- 17. CROSS ELECT. ENERGY GEN. (MWH):
586430.0 1152450.0 54422139.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
555070.0 1088010.0 50785160.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 96.6 61.5
- 20. UNIT AVAI! ABILITY FACTOR:(PERCENT) 100.0 96.6 61.5
- 22. UNIT CAPACITY FACTOR (DER): PCT 98.9 92.0 53.0
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 3.4 17.3
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL C?.ITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
i
~
NARRATIVE SUPT %RY OF i
H3ffIHLY OPERATDJG D:PERIDiCE i
UNIT II L
FEBRUARY 1990 I
i l
February 1
%e Unit operated at a nominal v.elue of 85% output in a i
cycle stretch out mode.
February 2 At 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> the Unit's output was reduced to 30% to pennit j
repairs to the Unit's main feedwater flow control valves.
February 3
%e Unit operated at 30% output to pennit' repairs to the f
through Unit's main feedwater flow control valves.
February 4 February 5 At 1010 hours0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.84305e-4 months <br /> the Unit's output was escalated to 50% to I
stletch the currunt fuel cycle.
February 6 2e Unit operated at 50% output in a cycle stretch out modo, i
through February 11 February 12 At 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> the Unit's output was escalated to 90% to stretch the current fuel cycle.
February 13 Se Unit operated at 90% output in a cycle stretch out mode.
through February 15 February 16 At 0721 hours0.00834 days <br />0.2 hours <br />0.00119 weeks <br />2.743405e-4 months <br /> the Unit's output was increased to 100%. At 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br /> the Unit's output was reduced to 50% to stretch the current fuel cycle.
February 17 S e Unit operated at 50% output in a cycle stretch _out mode.
through February 18 February 19 At 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> the Unit's output was escalated to 90% to stretch the current fuel cycle.
February 20 he Unit cperated at 90% output in a cycle stretch out modo.
.through i
February 23 February 24 At 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br /> the Unit's output was reduced to 85% to stretch the current fuel cycle.
February 25 h e Unit operated at 85% output in a cycle stretch out mode.
through February 28
UWIT SNUID0ves AWD PoufR REDUCTIOuS Docket so.
50-412' Unit Name aves unit 82 Date march 7. 1990 Completed By R.A. utneer REPORT MouTM FEBRUARY 1990 Tetephone _t412) 393-7621 Method of Licensee Cause & Corrective Duration shutting Event System Component Action to-No.
Date Typel (Nours)
Reason 2 Doun Reector3 Report 8 Code' Code 5 Prevent Recurrence 1
900202 S
O 8
5 N/A CN VALVEN Output reduced to 30% to permit mainte.,ance on the mein feedmater flou contret valves.
2 900205
.S 0
N 5
N/A ZZ ZZZZZZ Unit's output reduced to 50% to stretch the current fuel cycle.
3 900216 5
0 M
5 N/A ZZ ZZZZZZ Unit's autput reduced to 50% to -
stretch the current fuel cycle.
1 2
3 4
F-Forced Reason:
Method:
Exhibit G-Instructions for S-Scheduled A-Equipment Failure (Emptain) 1-Manual Preparation of Cata Entry Sheets 8-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File C-Refueling 3-Automatic Scram
(#UREG0161).
D-Regulatory Restriction 4-Cont'd. from Previous Month j
'E-Operator Training & License Emam 5-Reduction 5
F-Administrative 9-Other Exhibit I-Same Source.
G-Operational Error (Emplain)
N-Other (Emplain) tm.__
7--
3
(
s AVERAGE IRILY UNIT PDWER IIVEL i
l'[
Docket No.
50-412
' ~
Unit BVPS Unit 2 Date March 7,1990 Ccatpleted by M. A. Winaer e
hiephone (412)393-7621 i
M271N February 1990
[RY AVERAGE IAILY POWER IEVEL DAY AVERAGE DAILY POWER IIVEL (1+1e-Net)
(MWe-Net) i 1
704 17 360 2
667 18 340 3
187 19 648
.l 4
156 20 739 5
261 21 733 6
352 22 729 7
344 23 733 8
344 24 368 9
336 25 385
'10 348 26 722 11 357 27 693 12 648 28 693 13 721 29 N/A
-14 729 30 N/A 15.
728 31 N/A 16 749 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Cartpute to the nearest whole megawatt.
r
{
L
- c I
4 OPERATING IATA REPORP DOChTT NO.:
50-412 REPORT IATE: 03/07/90 OCHPIETED BY: M.A.WINGER t
TEIDHONE:
(412) 393-7621 b
OPERATING ETTA'IUS i
- 1. UNIT NAME: SEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: FEBRUARY 1990
- 3. LICENSED THERMAL POWER (MWt):
2660
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
885
- 7. MAX, DEPENDABLE CAPACITY (Net MWe):
833
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (Net MWe):
None i
l'. REASONS FOR RESTRICTIONS, IF ANY:
N/A O
THIS MONTH YEAR TO DATE CUMULATIVE e
- 11. HOURS IN REPORTING PERIOD:
672.0 1416.0 20031.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
672.0 1416.0 16972.8
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
+
- 14. HOURS GENERATOR WAS ON LINE:
672.0 1416.0 16842.9
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1194673.0 2881394.0 41694138.4
- 17. CROSS ELECT. ENERGY GEN. (MVH):
380400.0 934800.0 13400900,0
- 18. NET ELECTRICAL ENERGY GEN. (MVH):
354590.0 878481.0 12634956.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 84.1
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 100.0 84.1
- 22. UNIT CAPAC">Y FACTOR - (DER): PCT 63.1 74.2 75.5
- 23. UNIT FORCEb OUTACE RATE: (PERCENT) 0.0 0.0 6.2
- 24. SHUTDOWNS SCHEDULED OVER NEXT SI" MONTHS (TYPE,DATE. AND DURATION OF EACH):
_ THE UNITS SECOND REFUELING OUTAGE *iS SCHEDULEG_ TO BEGIN EARLY SEPTEMBER 1990 AND IS SCHEDULED TO BE FINISHED-IN NQVEMBER 1990.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD. ESTIKATED DATE OF STARTUP:
26, UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
1 FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 4
- - - - - ~
--