=7 e
E I
d;
]
b
' f m [ f'p'.
WW; i
(
k 1
~ '
' D ~ MMNNMUNICIPAL UTlWTY DISTRICT D' 6201 S Street, P.o. Box 15830 Secremento CA 958521830,(916) 452 3211_
' AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA ~-
1
?
1 LAGM/NOC90-072i m
a March.9, 1990' 0,
U. S.1 Nuclear Regulatory Commission
.cAttn:! Document Control-Desk EHashington,_DC :20555 j
m
- r ~.
4
. Docket-No. 50-312 1
0 Rancho Secol Nuclear Generating Station l
4 ELicense'No; DPR J STATUS OF INSERVICE-INSPECTION (ISI) AND INSERVICE TESTING (ICT) PROGRAMS p
_ George Knighton
! 1.
Attention:
1 7
y 1For*yourLinformation,Lwe provide.the following: status of Inservi-ce Inspection-q L(ISI);andcInservice: Testing (IST) programs at Rancho Seco.
y Regarding:ISI, we understand that the NRC's review of ourfsecond 10-year ISI'
- program has been stopped. He' concur _that no further work should be accomplished.on the second:10-year program. As previously established in our e
- Novemb'er '17,1989,1 November 2,1989, and September 11, 1989 letters regarding 1
LISI; Rancho Seco need not: complete any remaining inspections'to meet ASME-
'3 Section XI and 10 CFR 50.55a requirements.
Therefore; those inspectionsinot completed pertaining to the first 10-year ISI1 program:will not be performed.
Hethave no-: intent -to operate the plant as a nuclear facility:in the future,
~
andittereforetwill:have'no need:to perform any additional inspections.. Under the current-and future planned plant conditions,-there will be no affect on public health and. safety by not performing these inspections.-
1 1Concerning IST, the District does not intend-to continue the normal test-y K
,"scheduletfor pumps,and valves in systems not required by Technical 1
'l.
~ LSpecifications: to.be OPERABLE. Asrallowed'in'INP-3400 and IHV-3410, testing R
h' of pumps and valves need not be performed'when not required to be operable.
1
~
iThereLare noLsystems. subject to ISTl requirements that are-currently requi' red
)
to be:0PERABLE.-1There willinot be any affect on the. health-and safety of the
- l
$e
' public;byinot; performing;IST while defueled. ASME: Code,10 CFR 50.55a, ~ and E
Technical 2 Specification requirements are met without the performance of 1
' additional testing.' Also,_ we are not aware of any issue or submittal related to IST which:is under' review by NRC staff.
j M@
I
- PDR19003190078 900309 3
t 1ADOCK 05000312
(
P PDC
.D-RANCHO 3ECO NUCLEAR GENERATING STATION O 14440 Twin Cities Road, Herald, CA 95038 9799;(209) 333 2935
_j
p-..
~1 L
wa p_
ft George Knighton 2-AGM/NUC 90-072 1
o, g-I.
Concurrence by.you or'your staff on the status reported above would be L
appreciated.
Members of your staff with questions requiring additional information or
)
clarification may contact Steve Crunk at (209) 333-2935, extension 4913.
Sincerely, w
Dan R.-Keuter.
Assistant General Manager
- Nuclear-g
.cc:
J. B. Martin, NRC, Walnut Creek
.t 1
A.~ D'Angelo,.NRC, Rancho Seco h
s
.L i
4 e
i-F l
F I
h i
b-L
+
0 i'
4 4
-