ML20012B739
| ML20012B739 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 03/08/1990 |
| From: | Scace S NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20012B740 | List: |
| References | |
| MP-90-229, NUDOCS 9003160204 | |
| Download: ML20012B739 (1) | |
Text
'
a General Offices
- Seiden Street, Berkn. Connecticut 2/,EC'E'i70I= a~=
P.O. BOX 270
.m.w **'** We m**
HARTFORD. CONNECTICUT D61410270 L
L J 7.Z',C',"Jg;*
(203) sts-5000 March 8, 1990 MP-90-229 Re:
10CTR50.*11 (a)
U.S. Nuclear Regulatory Comission Document Control Desk Washington, D.C.
20555
Reference:
Tacility Operating Licende DFR-21 Docket No. 50-245
Dear Sir:
In accordance with Millstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating data report for Millstone Unit 1 is enclosed.
One additional copy of the report is enclosed.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY kt Stepher{}E.. cace
'i
$W Director, Millstone Station SES/GSN:dir
Enclosures:
(4) cci-W.' T. Russell, Regional Administrator Region I M. Boyle, NRC Project Manager, Millstone Unit No. 1 W.' J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1, 2 & 3 1
18R32ABSEA E8Slh5 Da
/N 1\\\\
"