Notifies That Util Expects Facility to Satisfy Requirements for Transition to Mode 3 within 60 Days.Util Will Inform NRC When Shipment of Remaining Canisters Occurs
ML20012B319
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/07/1990
From: Roche M
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
4410-90-L-0018, 4410-90-L-18, NUDOCS 9003140187
Download: ML20012B319 (2)


Text

$.s

.L 7

v

- 3 :L.: -j %,0; l

7) ][i I

b 4

GPU Nuclear Corporation i

Q@gggf Post Office Box 480 e

Route 441 South '

Middletown, Pennsylvania 17057 0191.

717 944 7621 TELEX 84 2386 Writer's Direct Dial Number; (717) 948-8400 March 7, 1990 4410-90-L-0018/0524P p

if '

I

-w US Nuclear' Regulatory Commission Washington, DC-20555-i Attention: Document Control Desk y

' Three Mile Island Nuclear Station, Unit 2 (TMI-2)

. Operating License No. DPR-73 Docket No. 50-320

. Transition to Facility Mode 3

Dear Sirs:

The purpose of this letter is to provide notice that GPU Nuclear expects TMI-2 ito satisfy the reouirements for' transition-to Facility Mode 3, as defined in

~

.the TMI-2 Technical Specifications, within the next 60 days. Table 1.1 of the l

TMI-2iTechnica1' Specifications states that Facility Mode 3 shall exist when

' the' conditions for Facility Mode 2 are met and no canisters containing' core H

' material-are stored on the TMI-2 site.

'GPU Nuclear letter 4410-90-L-0012 dated February 22, 1990, forwarded the* final j

submittal of:.the Defueling Completion Report which demonstrated that THI-2 has ll satisfied'the Technical Specification-reouirements for transition to Facility

! Mode 2.

Based on Technical Specification 1.3, transition to Mode 2'may take-place 60; days following submittal.of the report. Tne remaining condition for i

transition to Fccility Mode 3 (i.e., no canisters containing core material' stored on-site) is' expected to be satisfied within the next 60 days by 1

. shipment'of.the remaining defus11ng canisters off-site. 'Therefore, GPU

' Nuclear intends to transition to Facility Mode 3 on May.7,1990, (60' days from the date off this. letter) unless final shipment-is celayed.

i lk t l

09 0

+

GPU Nuclear Corporation is a subsidiery of the General Public Utilities Corporation 9003140187 900307 PDR-ADOCK 05000320 J

PDC m

g; x.

7, s'

4 E-

/

lbocume'ntControl-Desk-

~

l March 71,19901 4410-90-L-0018 '

- t-' LPage 2-;

l{e

'GPU Nuclear-will inform the NRC when shipment of the remaining canisters has occurred so that satisfaction of this reouirement may be independently

' verified, if deemed appropriate.

Sincerely, i

M. B. Roche Director, THI-2

-JJB/ emf

'ec:

W. T. Russell - Regional Administrator, Region-I

'J. F. Stolz'- Director, Plant Directorate I-4 L. H. Thonus - Project-Manager, TMI Site

- F. I. -Young - Senior Resident Inspector, TMI t

?

F l

3

[,