GPU Nuclear Corporation i
Q@gggf Post Office Box 480 e
Route 441 South '
Middletown, Pennsylvania 17057 0191.
717 944 7621 TELEX 84 2386 Writer's Direct Dial Number; (717) 948-8400 March 7, 1990 4410-90-L-0018/0524P p
if '
I
- -w US Nuclear' Regulatory Commission Washington, DC-20555-i Attention: Document Control Desk y
' Three Mile Island Nuclear Station, Unit 2 (TMI-2)
. Operating License No. DPR-73 Docket No. 50-320
. Transition to Facility Mode 3
Dear Sirs:
The purpose of this letter is to provide notice that GPU Nuclear expects TMI-2 ito satisfy the reouirements for' transition-to Facility Mode 3, as defined in
~
.the TMI-2 Technical Specifications, within the next 60 days. Table 1.1 of the l
TMI-2iTechnica1' Specifications states that Facility Mode 3 shall exist when
' the' conditions for Facility Mode 2 are met and no canisters containing' core H
' material-are stored on the TMI-2 site.
'GPU Nuclear letter 4410-90-L-0012 dated February 22, 1990, forwarded the* final j
- submittal of:.the Defueling Completion Report which demonstrated that THI-2 has ll satisfied'the Technical Specification-reouirements for transition to Facility
! Mode 2.
Based on Technical Specification 1.3, transition to Mode 2'may take-place 60; days following submittal.of the report. Tne remaining condition for i
transition to Fccility Mode 3 (i.e., no canisters containing core material' stored on-site) is' expected to be satisfied within the next 60 days by 1
. shipment'of.the remaining defus11ng canisters off-site. 'Therefore, GPU
' Nuclear intends to transition to Facility Mode 3 on May.7,1990, (60' days from the date off this. letter) unless final shipment-is celayed.
i lk t l
09 0
+
GPU Nuclear Corporation is a subsidiery of the General Public Utilities Corporation 9003140187 900307 PDR-ADOCK 05000320 J
PDC m
g; x.
7, s'
4 E-
/
lbocume'ntControl-Desk-
~
l March 71,19901 4410-90-L-0018 '
- t-' LPage 2-;
l{e
'GPU Nuclear-will inform the NRC when shipment of the remaining canisters has occurred so that satisfaction of this reouirement may be independently
' verified, if deemed appropriate.
Sincerely, i
- M. B. Roche Director, THI-2
-JJB/ emf
'ec:
W. T. Russell - Regional Administrator, Region-I
'J. F. Stolz'- Director, Plant Directorate I-4 L. H. Thonus - Project-Manager, TMI Site
- F. I. -Young - Senior Resident Inspector, TMI t
?
F l
3
[,
m m
.