Text
p s
) commonwealth Edison bD
- x-(
, One First National Plaza. Chicago, lilino s
(
Address Koply to, Post Othoe Box 767
/ ' Chicago, Illinois 60690 0767 x.y February 2,1990 Mr. A. Bert Davis Regional Administrator
i U.S. Nuclear Regulatory Commission L -
Region III 799 Roosevelt Road Glen Ellyn, IL 60135 j
l
Subject:
Zion Station Units 1
'l Additional Information for Inspection Report 89019
}
NRC_DorkeLHb_,10:125 V
'4 References (a) July 21, 1989, letter from T.J. 1:ovach to A.B. Davio
Dear Mr. Davis:
The purpose of this letter is to inform you that Zion Station has completed the review of the recirculation phase functions for possible inclusion in the Technical Specifications. The principal documents used i
during the perfonnance of this review included the Zion Updated FSAR, Emergency Operating Procedures (EOP's), Abnormal Operating Procedures (AOP's),
f Byron Station Technical Specifications, and the Standardized Technical Specifications Revision 4 dated Fall 1981.
}
The review focused on motor operated valves (MOVs) that would ba required for post-LOCA ECCS recirculation phase service, but whose operability is not explicitly assured by current Technical Specifications. The list of valves considered in the review, and the results of the review are provided in Attachment A.
l The valves that are currently addressed in the Technical Specifications are identified in column number 3.
The remainder of the valves will be included in a submittal that will propose a revision to the Technical Specification Bases. The submittal will be provided by April 1, 1990.
If any further questions arise concerning this matter, please direct them to this office.
Very truly yours, TNN R. A.
' trzanowsk
\\
i
'~"
9003130084 900202 Nuclear Li nsing Administrator gDR ADOCK0500gf5 cc C. Patel - NRR Resident inspector - Zion
. Office of Nuclear Reactor SafLey - IDNS
.0441T:13 FEB - 81990
+
L <.
s
- %i<
l ATTACHMENT A ECCS RECIRCULATION PHASE COMPONENTS CURRENT FUTURE ITEM EPN NOUN NAME TECH SPEC TECH SPEC 1.
NOV-CS0002 CS pp A disch stop 3.6/3.9 N/A
{
2.
MOV-CS0003 CS pp A hdr isoi 3.6 N/A 3.
MOV-CS0004 CS pp B disch stop 3.6/3.9 N/A J
4.
MOV-CS0005 CS pp B hdr isol 3.6 N/A F
5.
MOV-CS0008 CS A spray add stop 3.6 N/A 6.
MOV-CS0009 CS B spray add stop 3.6 N/A i
7.
MOV-CS0010 CS C spray add stop 3.6 N/A t
8.
MOV-CS0049 RHR to A CS hdr stop Yes t
9.
NOV-CS0050 RHR to B CS hdr stop Yes 10.
MOV-RH8700A RHR pp A suct stop 3.8.3 N/A i
11.
MOV-RH87008 RHR pp B suct stop 3.B.3 N/A t
12.
NOV-RH8716A RHR crosstie Yes 13.
MOV-RH87168 RHR crosstie Yes 14.
MOV-RH8716C RHR crosstie Yes 15.
MOV-RH8703 RHR disch to H/L Yes 16.
MOV-RH9000 RHR to H/L isol Yes 17.
NOV-S!8802 SI to C/L isol Yes 1
18.
MOV-SI8804A RHR to CHG pp suct Yes 19.
MOV-SI88048 RNR to SI suct Yes 20.
NOV-SI6806 RNST to SI suct 3.8.2 N/A 21.
MOV-SI8807A CHG/SI suct crosstie Yes 22.
NOV-SI88078 CHG/S! suct crosstie Yes l
l 23.
MOV-SI8813 SI to RMST recir stop Yes 24.
MOV-SI8814 SI to RNST recir stop Yes i
25.
MOV-SI8809A RHR A to C/L B&C isol Yes 26.
MOV-SI88098 RHR B to C/L A&D isol Yes 27.
MOV-SI8811A Recirc hump to RHR 3.8.3 N/A 28.
MOV-SI8811B Recirc sump to RHR 3.8.3 N/A l
29.
MOV-SIB 923A SI A suct from RNST Yes 30.
MOV-SI89238 SI B suct from RHST Yes 31.
MOV-SI9010A SI A disch to C/L Yes 32.
MOV-SI90108 SI B disch to C/L Yes L
33.
NOV-SI9011A SI A disch to H/L A&D Yes 34.
MOV-S!9011B SI B disch to H/L B&C Yes 35.
MOV-VC1120 RWST to CHG pp suct 3.8.1 N/A t
36.
MOV-VC112E RHST to CHG pp suct 3.8.1 N/A 37.-
MOV-CC9412A CC from RHR HX A isol Yes
(
38.
NOV-CC94128 CC from RHR HX B isol Yes 17350
,, - - -. - ~
~v--+-
-~ ~ --
--- - - - - - - - - - - - - - - - - - - - -