ML20012A333
| ML20012A333 | |
| Person / Time | |
|---|---|
| Site: | Neely Research Reactor |
| Issue date: | 02/26/1990 |
| From: | Peebles T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Karam R Neely Research Reactor, ATLANTA, GA |
| Shared Package | |
| ML20012A334 | List: |
| References | |
| NUDOCS 9003090265 | |
| Download: ML20012A333 (1) | |
Text
e L
a rehruary 26, 1990
=
Georgia Institute of Technoloay 3
ATTN: Dr. Ratib A. Karam, Director Nuclear Research Center 900 Atlantic Drive, N. W.
Atlanta, Gcorgia 30332 Gentlemen:
SUBJECT:
EXAMINATION REPORT NO. 160/0L-90-1 On January 23-24, 1990, the NRC administered examinations to employees of your facility who had applied for licenses to operate the Georaia Institute of Technology Research Reactor.
At the conclusion of the examination, the examination questions and preliminary findinos were discussed with those members of your staff identified in the enclosed report.
In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosures will be placed in the NRC's Public Document Room.
Should you have any questions concerning this examination, please contact us.
Sincerely, (ORIGINAL SIGNID BY T. A. Pmmm)
Thomas A. Pecbles, Chief Operations Branch Division of Reactor Safety
Enclosures:
1.
Report Details 2.
R0/SR0 Examination and Answer Key 3.
Facility Consnents 4.
NRC Resolution of Comments cc w/encls 1 and 4:
Dr. T. E. Stelson, Vice President for Research cc w/ enc 1 1:
State of Georaia
- gg bec w/ enc 1 1
(
A. Adams, NRR gg E. McAlpine, DRSS Nb 8n //NRC Public Document Room bec w/encls 1, 2, 3, and 4:
u eo nw
$u bec w/encls 1, 3, and 4:
oO Operator Licensina Branch, DLPQ, NRR S"
B. L. Holbrook, DRS
,fRS RII Rll:DRS RIJ
<BHolbrook:ser.
RBaldwin CCakTo TPeebles l
02/A2/90 02/M/90 2/g/90 2/Q/90
\\(
1 L
I$
,