Order Modifying Licenses DPR-29 & DPR-30,removing Rl Dickherber from Licensed Activities
ML20011F596
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 02/23/1990
From: Thompson H
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To:
COMMONWEALTH EDISON CO.
Shared Package
ML20011F594 List:
References
EA-90-032, EA-90-32, NUDOCS 9003070017
Download: ML20011F596 (7)


Text

_..

t l

UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of Docket Nos. 50-254 and 50-256 License Nos. DPR-29 and DPR-30 Comonwealth Edison Company EA 90-032 Quad Cities Nuclear Power Station ORDERMODIFYINGLICENSE(EFFECTIVEIMMEDIATELY)

L 3

i

. The Commonwealth Edison Company (Licensee) is the holder of Operating License Nos. DPR-29 and 30 (the Licenses) issued by the Nuclear Regulatory Comission

. (NRC/ Commission) pursuant to 10 CFR Part 50. The Licenses authorize the Licensee to operate the Quad Cities Nuclear Power Station, Units 1 and 2 (Quad Cities or facility) located in Rock Island County, Illinois. The Licenses were issued by the Nuclear Regulatory Comission on October 1,1971 and April 6,1972, respectively.

II The NRC licenses individuals pursuant to 10 CFR Part 55, Operator's License, to direct fuel handling activities. The operator license requires the indivi-oual to observe the operating procedures and other conditions specified in the l

Technical Specification 6.2.A.2, a condition of the Quad l

facility license.

L Cities Nuclear Power Station Licenses,. requires that refueling activities be l

accomplished in accordance with approved procedures.

Facility procedures that implement this requirement include QFP 100-1, Master Refueling Procedure, and QTP 1103-1, Preparation of Nuclear Component Transfer List. QFP 100-1 details the administrative controls to be taken to assure that all core alterations l

will be performed in a safe and orderly manner. Steps C.2 and F.3, QTP 100-1 require continuous comunication between the control room and the refueling Step D.5 requires that the control room be informed of any action that floor.

9003070017 900223 h

DR ADOCK 0500 p4

{

, ?

will affect the core reactivity. Section F specifies how QTP 1103-1 is to be used to implement core alterations.

Step F.2 requires that steps on the Nuclear Component Transfer List (NCTL) taust be performed in the exact order listed or i

the steps must be changed in accordance with QTP 1103-1.

In turn, QTP 1103-1, Step E.1 and Step F.6, require that any deviation from the NCTL must be autho-

.rized by the Nuclear Engineer on duty.

On October 17, 1989, refueling activities were being conducted at Quad Cities Nuclear Power Station, Unit 1, by Mr. Robert L. Dickherber, a Fuel Handling Foreman with a Senior Operator License Limited to Fuel Handling. issued pursusnt to 10 CFR Part 55, and two non-licensed fuel Handlers. An approved copy of the NCTL was being used at the job site and continuous communication with the control room was initially established.

During the reactor refueling, a fuel assembly was erroneously placed in the wrong core location.

ThroughanongoingNRCinvestigation(InvestigationNo. 3-89-015) of undocumented fuel moves that occurred on October 17,1989, the NRC has concluced 1

that Mr. Robert L. Dickherber directed the two Fuel Handlers of the refueling crew to perform an unauthorized fuel manipulation to correct a fuel load error, l

This was in violation of station refueling procecures QFP 100-1, Steps D.5 and l

F.2, and QTP 1103-1, Steps E.1 and F.6, in that the fuel manipulation was not specified in a NCTL, an approved deviation to the NCTL was not obtained prior to fuel moveiaent, and the control room was not informed of the action that affected core reactivity.

I 1

II

?

~

, The unauthorized fuel manipulation by Mr. Dickherber occurred usediately after he was reminded by a Fuel Handler of the need to comply with the requirements of facility procedures QFF 100-1 and QTP 1103-1. khile the fuel manipulation that was unauthorized by station procedures took place, Mr. Dickherber failed to assure that constant connunication was maintained with the control room as required by QFP 100-1, Steps C.2 and F.3.

As a result, the control room personnel were not notified, as required, of the fuel manipulation to assure that core monitoring required by QFP 100-1 took place. QFD 100-1 and QTP 1103-1 are procedures required by Technical Specification 6.2.A.2.

They thus are NRC rcquirements Mr. Dickherber was requfred to adhere to by the terms of his Senior Operator License. Based on the above, it appears that on October 17, 1989, Mr. Robert L. Dickherber willfully violated NRC requirenents during refueling activities.

NRC regulations require that activities that can affect the reactivity of the reactor core be conducted by well-trained and qualified personnel under the L

supervision of a senior licensed operator, and in accordance with approved procedures. After a fuel load error was discovered, Mr. Dickherber directed that an unauthorized fuel movement take place in violation of Quad Cities QFP 100-1. Master Refueling Procedure, and QTP 1103-1, Preparation of Nuclear Component Transfer List.

Both Fuel Hardlers recognized that Mr. Dickherber's instructions violated procedural requirements, but complied with those instruc-tions and failed to notify the Nuclear Engineer in the control room of the fuel No emergency condition or other extenuating circumstance existed which move.

i

--n--

\\

i i

might have warranted a departure from license conditions or Techncial Specificationspursuantto10CF50.54(x).

Mr. Dickherber's willful violation of Consnission requirements, including the conditions of his 10 CFR Part 55 Senior Operator's License, is unacceptable and I have issued a separate Order suspending Mr. Dickherber's 10 CFR Part 55 license.

Furthermore, I lack the requisite reasonable assurance that, with Mr. Dickherber involved in any activities licensed under 10 CFR Part 50, the Licensee's current operations can be conducted such that the health and safety of the public, including the Licensee's employees, will be protected. There-fore, the public health and safety require that License Hos. DPR-29 and 30 be modified to prohibit Mr. Robert L. Dickherber from involvement in licensed activities under these licenses. Furthermore, pursuant to 10 CFR 2.204, I find I

that the public health and safety require, in view of the wi11 fulness of the violation, that this Order must be effective inmediately.

IV Accordingly, pursuant to Sections 103,161b,161c,1611, and 1610,182, and 186 of the Atomic Energy Act of 1954, as amended, and the Connission's regulations in 10 CFR 2.204 and 10 CFR Part 50, IT IS HEREBY ORDERED, EFFECTIVE INMEDIATELY, THAT:

License Nos. DPR-29 and 30 are modified by adding the following condition:

Mr. Robert L. Dickherber shall not participate in any licensed activity under License Nos. DPR-29 and DPR-30 without prior written approval of

1 i

5-o r

5-the Regional Administrator, Region III.

If such approval is sought, the i

Licensee shall provide a statement as to its basis for concluding that, i

i in light of Mr. Dickherber's conduct on October 27, 1989, he will properly 1

carry out activities.

l The Regional Administrator, Region 111, nwy relax or terminate this condition for good cause shown.

1 V

The Licensee, Hr. Dickherber, or any other person adversely affected by the License Modification ordered in Section IV above may submit an answer to this Order within 20 days of the date of this Order. The answer nay set forth the matters of law on which the Licensee or Mr. Dickherter or any other person adversely affected relies and the reasons as ta why the Order should not have been issued. An answer filed within 20 days of the date of this Order may also request a hearing. Any answer and/or request for hearing shall be submitted to the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555, Attention Chief, Docketing and Services Section. Copies also shall be sent to the Director, Office of Enforcenent, U.S. Nuclear Regulatory Commission.

L Washington, D.C.

20555, the Assistant General Counsel for Hearings and Enforcenent at the same address, and to the Regional Administrator, U S.

Nuclear Regulatory Commission, Region III, 799 Roosevelt Road, Glen Ellyn, Illinois 60137.

If a person other than the Licensee requests a hearing, that person shall set forth with particularity the manner in which the

i,,

6-person's interest is adversely affected by the Order and should address the criteriasetforthin10CFR2.714(d). A REQUEST FOR A HEARING SHALL NOT STAY THE IMIEDIATE EFFECTIVENESS Of THIS ORDER.

If a hearing is requested, the Coimission will issue an Order designating the time and place of any hearing.

If a hearing is held, the issue to be considered at such hearing shall be whether this Order should be sustained.

FOR THE NUCLEAR REGULATORY COMMISSION

/

Hugh' L. Thonpso, J.

Deputy Executive Di ctor for Nuclear Materials Safety, Safeguards, and Operations Support Dated at Rockville, Maryland thisg day of February 1990 I

l l

l

FEB 2 31990 L*,. -- e Coisonwealth Edison Comparo'

[

DISTRIBUTION:

I PDR I

L LPDR' SECY CA HThompson, DEDS JMTaylor, DEDR JLieberman, OE ABDavis, RIII L

LChandler, DGC i

TMurley, NRR-i JPartlow, NRR I

Enforcement Coordinators I

RI, RII, RIII, RIV, RV Resident Inspector-FIngram, GPA/PA BHayts, OI t

EJordan, AEOD WTroskoski, OE i

OE:Chron OE:EA DCS l

State of Illinois DDanDois, RM t

}

f P

OE M*e I RA:RIII GC 4

D.

HThothp[ son DEQ ilTroskoski ABDavis J oldberg JLieberman 2/A*/90 2/>

0 2/p90 2/ 9/90 2/ 71/ 90 t[ o+

</

. -.