ML20011F528

From kanterella
Jump to navigation Jump to search
1989 Annual Rept - Part 1
ML20011F528
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/31/1989
From:
GEORGIA POWER CO.
To:
Shared Package
ML20011F527 List:
References
NUDOCS 9003060204
Download: ML20011F528 (8)


Text

.. _.

.\\

m e

e galC GE4gg 4@

49

.[

GEORGIA POWER

(

7 L

o

$a A-COMPANY PLANT V0GTLE UNITS 1 & 2 1989 I

L AXXUAL REPORT 1

l PART 1 -

k L

DOCKET NUMBERS 50 - 424/425 L

LICENSE NUMBERS NPF-68/81 e

j88 28880 888sj!r O

7,7 n

~ xx f,

.V0GTLE ELECTRIC GENERATING PLANT - UNITS l & 2 1989 ANNUAL REPORT.- PART 1 TABLE OF CONTENTS EA_GJ

.1.

INTRODUCTION 1

l s

II. TECHNICAL SPECIFICATION 6.8.1.2 ANNUAL REPORTS

~

A.- ' TECHNICAL SPECIFICATION 6.8.1.2a - REPORT OF PERSONNEL EXPOSURE GREATER THAN 100 MREM /YR.

2 1:-

B.

TECHNICAL SPECIFICATION 6.8.1.2b - REPORT OF l

PRIMARY COOLANT EXCESSIVE SPECIFIC ACTIVITY 4

i C.

TECHNICAL SPECIFICATION 6.8.1.2c - REPORT OF i

LEAKAGES GREATER THAN OR EQUAL TO 0.005 i

MICR0CVRIES-5 l

.I11. ANNUAL-PERSONNEL. MONITORING REPORT 6

.l I

.l I

i

)

8

t 9....

p I

V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 & 2 1989 ANNUAL REPORT - PART 1 INTRODUCTION The Vogtle Electric Generating Plant Units 1 and 2 are powered by pressurized water reactors, each rated at 3411. megawatts thermal.

The plant is located on the Savannah River in Burke County, Georgia,-at a site 34 miles southeast of Augusta. The Unit 1 operating license was initially received on January 16, 1987 and commercial operation started on May 31, 1987.

Unit 1 is scheduled to complete -its second fuel cycle in February 1990.

Unit 2 received its initial operating license on February 9,1989, and began commercial operation on May 20, 1989.

Unit 2 is operating in its first fuel cycle.

T v

1

.i.

11

-V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 & 2

.1989 ANNUAL REPORT - PART 1 TECHNICAL SPECIFICATION 6.8.1.2a REPORT OF PERSONNEL EXPOSURE GREATER THAN 100 MREM /YR

  1. PERSONNEL (>100 MREM)

TOTAL MAN-REM WORK-& JOB FUNCTION STATION UTILITY CONTRACT STATION UTillTY CONTRACT Reactor Operations & Surveillance

-Maintenance & Construction 2

0 0

1.401 0.009 0.504 Operations 1

0 l'

O.361 0.000 0.497 Health Physics & Lab 3

0 6

1.172 0.015 2.590 Supervisory & Office Staff 0

0 0

0.011 0.002 0.005 Enaineerina Staff 0

0 0

0.039 0.000 0.062

Routine Plant Maintenance Maintenance & Construction 3

0 2

1.634 0.009 0.889 Operations 0

0 0

0.418. 0.000 0.100 Health Physics & Lab 6

0 2

1.670 0.014 1.359 Supervisory & Office Staff 0

0 0

0.011 0.017 0.027 Enqineerina Staff 0

0 0

0.055 0.000 0.139 inservice Inspection Maintenance & Construction 0

0 0

0.848 0.085 0.649 Op? rations 0

0 0

0.108 0.000 0.071 Health Physics & Lab 0

0 0

0.443 0.000 0.639

. Supervisory & Office Staff 0

0 0

0.011 0.002 0.031 Enaineerina Staff 0

0 0

0.077 0.000 0.143 Special Plant Maintenance Maintenance ! Construction 8

0 2

3.569 0.029 0.830 Operations 0

0 0

0.375 0.000 0.034 Health Physics & Lab 3

0 2

1.386 0.058 1.273 Suparvisory & Office Staff 0

0 0

0.011 0.002 0.005

-Enaineerina Staff 1

0 0

0.280 0.000 0.039 Waste Processing Maintenance-& Construction 0

0 0

0.861 0.009 0.450 Operations 0

0 0

0.114 0.000 0.079 Health Physics & Lab 4

0 3

1.498 0.000 1.938 l

Supervisory & Office Staff 0

0 0

0.011 0.002 0.005 r

'Enoineerina Staff 0

0 0

0.030 0.000 0.039 Refueling Maintenance & Construction 0

0 0

0.890 0.009 0.450 Operations 0

0 0

0.114 0.000 0.034 Health Physics & Lab 0

0 0

0.443 0.000 0.580

-Supervisory & Office Staff 0

0 0

0.011 0.002 0.005 Enaineerina Staff 0

0 0

0.030 0.000 0.039 2

p

.4-z E

II (CONTINUED)

V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 & 2 1989 ANNUAL REPORT - PART 1

. TECHNICAL SPECIFICATION 6~8.1.2a REPORT OF PERSONNEL EXPOSVRE GREATER THAN 100 MREM /YR

  1. PERSONNEL (>100 MREM)

TOTAL MAN-REM w WORK-& JOB FUNCTION STATION UTILITY CONTRACT STATION UTIllTY CONTRACT Totals Maintenance & Construction 13 0

4 9.203 0.149 3.770 Operations 1

0 1

1.490 0.003

-0.813 Health Physics & Lab 16 0

13 6.612 0.087 8.380.

Supervisory & Office Staff 0

0 0

0.063 0.026 0.081 Enaineerina Staff 1

0 0

0.510 0.000 0.462 Grand Totals 31 0

18 17.878 0.265 13.506-NOTE:

The figures presented in this table are generated by computer.

Therefore,

-the Totals may be affected by round-off error, I

i 3

p.

y k

11 V0GTLE ELECTRIC GENERAIING PLANT - UNITS 1 & 2 1989 ANNUAL REPORT - PART 1 TECHNICAL SPECIFICATION 6.8.1.2b REPORT OF PRIMARY COOLANT EXCESSIVE SPECIFIC ACTIVITY There were no instances of Units 1 or 2 exceeding the dose equivalent iodine limits or the total specific activity limits, as specified in the Technical Specifications, Section 3.4.8, during 1989.

y l

1 i

a l

i 4

b I

g 4

l 1

n

,z C4,;,_;,

II V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 &-2 U

1989 ANNUAL REPORT - PART 1 TECHNICAL SPECIFICATION 6.8.1.2c

~

REPORT 0F LEAKAGES GREATER THAN OR E00AL TO 0.005 MICR0 CURIES As required by Technical Specification Section 3.7.9, leak tests were performed on sealed sources with activity greater than 100 microcuries of beta and/or gamma, or 5 microcuries of alpha. The test results revealed activities less than 0.005 microcuries of removable contamination.

I C

5 1

t-

.,.c r

6-111 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 & 2 1989 ANNUAL REPORT - PART 1 l

10 CFR 20.407 ANNUAL PERSONNEL NONITORING REPORT Estimated whole body exposure range Number of (rems) individuals in each ranae No measureable exposure 2682 Measureable exposure less than 0.1 330 0.1 to 0.25 76

'0.25 to 0.5' 20 0.5 to 0.75 1

0.75 to 1.0 0

1.0 to 2.0 0

2.0 to 3,0 0

3.0 to 4.0 0

i 4.0 to 5.0 0

5.0 to 6.0 0

6.0 to 7.0 0

7.0 to 8.0 0

j 8.0 to 9.0 0

9.0 to 10.0 0

10.0 to 11.0 0-

.I1.0 to 12.0 0-1 g

12 4 0

Total number of personnel monitored 3109

'This report is submitted in accordance with paragraphs (a)(2) and (b) of 10 CFR I

20.407.

6 i

~~