ML20011F143
| ML20011F143 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 02/23/1990 |
| From: | Hannon J Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20011F144 | List: |
| References | |
| NUDOCS 9003010302 | |
| Download: ML20011F143 (6) | |
Text
--
F ' o
,;.s.. %
m" &
P' ;j' UNITED STATES.
~
M 'l n1 NUCLEAR REGULATORY COMMISSION i
I
- WASHINGTON, D. C. 20666 7,;
4.....g_
1 WISCONSIN ELECTRIC POWER COMPANY DOCKET NO. 50-266
-POINT REACH NUCLEAR PLANT, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE r
Amendment No. 126 License No. DPR-24 e
1.-
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Wisconsin Electric Power Company.-
i
-(the licensee) dated July 6,1988 as supplemented November 1,1989, complies with the standards and requirements of the Atomic Energy Act of 1954,-as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act.and the rules and regulations of the Comission; t-C.
There is reasonable assurance (i) that the activities authorized L
by this amendment can be conducted without endangering the health l
and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the.comon l
defense and security or to the health and safety of the public; l
and l
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 l
of the Comission's regulations and all applicable requirements have been satisfied.
i 5%
9003010302 900223 hj ADOCKo$00g6 DR.
j m--
- m. m
.m
-. m
Q,,
]
2-
}
,,: m
)
D 2.
- Accordingly, the license is amended by changes to the Technical Specifications as indicated-in the attachment to this-license amendment, and paragraph 3.B of Facility Operating License No.
DPR-24 is hereby amended to read as follows:
B.
Technical-Specifications The Technica1' Specifications contained in Appendices A and B, as revised through Amendment No.
126, are hereby incorporated ~
in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective immediately upon issuance. The Technical Specifications are to be implemented within P0 days from the date of. issuance.
1 FOR THE NUCLEAR REGULATORY COMMISSION F4 h. GdA=
John N. Hannon, Director- [
Project Directorate III-3 Division of Reactor Projects
- III, IV, V and Special Projects Office of Nuclear Reactor Regulation i
Attachment:
Changes to.the-Technical Specifications t
Date of Issuance:
February 23, 1990 f
I
,-4 r.~-
xm
- G UNITED STATES L8
. NUCLEAR REGULATORY COMMISSION
-[
i[
.wAswmorow, o, c, sones
- 4.....,f f
~
s.
~
WISCONSIN ELECTRIC POWER COMPANY
-D0CKET N0; 50-301 j
POINT BEACH NUCLEAR PLANT, UNIT NO. 2 AMENDMENTTOFACILITYOPERATINGLICEN1E E
Amendment No.130 License No.~DPR-27 1.
The Nnclear Regulatory Comission (the Comission). has found that:
A.'
The application for amendment by Wisconsin Electric Power Company l
(the licensee) dated July 6, 1988 as supplemented November 1, 1989, complies with the standards and requirements of the Atomic-Energy 1.
Act_ of 1954, as amended (the Act), and the Comission's rules and l;
regulations set forth in 10 CFR Chapter I; B.
The' facility will operate in conformity with the application, the
- k e
provisions of the Act, and the rules and regulations of the
?
Comission; C.
Thereisreasonableassurance(i)thattheactivities. authorized
-by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be' r
conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common I
defense and security or to the health and safety of the public; 4
and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
h L
1
.N..
rg-fp f
M 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license w;
amendment.and' paragraph 3.B of Facility Operating License No.
-DPR-27 is hereby' amended to read as follows:
B.
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised-through Amendment No.-
130, are hereby incorporated in'the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective immediately upon issuance. The Technical Specifications are to be implemented within 20 days from the date of issuance..
FOR THE NUCLEAR REGULATORY COMMISSION
[
M. Om John N. Hannon, Director p Project Directorate III-3 Division of Reactor Projects - 111, IV, Y and Special Projects Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date'of Issuance:
February 23, 1990
5 ATTACHMENT TO LICENSE AMENDMENT NOS.126 AND 130 TO FACILITY OPERATING LICENSE NOS. DPR-24 AND DPR-27 DOCKET NOS. 50-266 AND 50-301 Revise Appendix A Technical Specifications by removing the page identified below and inserting the enclosed page. The revised page is identified by amendment number and contains marginal lines indicating the area of change.
REMOVE INSERT 15.5.4-1 15.5.4-1 l
y i j.;
t 15.5.4 FUEL STORAGE Applicability'
_j Applies to the capacity and storage arrays of new and' spent fuel.
Oy ective:
To define. those aspects of fuel storage relating to prevention of critical-ity in fuel storage areas.
Specification
.l.
The new fuel storage and spent fuel pool structures.cre designed to
-withstand the anticipated earthquake loadings as Class I structures.
Tne spent fuel pool has a stainless steel liner to ensure against
- loss of water.
2.
The new and spent fuel storage racks are designed so that it-is impossible to store assemblies in other than the prescribed storage 2
- locations.
The fuel'is stored vertically in an_ array with sufficient i
center-to-center distance between assemblies to assure K,ff < 0.95 with the storage pool filled with unborated water and with the fuel loading in the assemblies limited to 44.8 grams of U-235 per axial centimeter of standard fuel assembly and 46.8 grams of U-235 per. axial centimeter of 0FA fuel assembly with or without axial blanket loadings.
An inspection area shall allow rotation of fuel assemblies for visual inspection, but shall not be used for storage.
[
3.
The spent fuel storage pool shall be filled with borated water at a L
concentration of at least 1800 ppm boron whenever there are spent fuel assemblies in the storage pool.
- 4. -Except for the two storage locations adjacent to the d'esignated s' lot for the spent fuel storage rack neutron absorbing material surveil-lance specimen irradiation, spent fuel assembly storage locations immediately adjacent to the spent fuel pool perimeter or divider walls
[
- all not be occupied by fuel assemblies which have been subcritical for less than one year.
l 15.5.4-1 Unit 1 - Amendment 35,77,S$,JJ7,126 Unit 2 - Amendment /J,EJ,90,J20,130 l
s
-