y MaineYankee
@ F j LT U M Eic K [ @ W Niy sM i W EDISON DRIVE e AUGUSTA MAINE 04336 * (207) 622-4868 b
February 12, 1990 MN-90-16 SEN-90-23 L
UNITED STATES NUCLEAR REGULATORY COMMISSION Attention:
Document Control Desk Washington, DC 20555
References:
(a)
License No. DPR-36 (Docket No. 50-309)
(b) NUREG-0020, Li_ensed Operating Reactor Status Summary Report
Subject:
Maine Yankee Monthly Statistical Report Gentlemen:
Enclosed you will find the Monthly Statistical Report for the Maine Yankee Atomic Power Station for January 1990.
Very truly yours, SES i
L S. E. Nichols l
Licensing Section Head SLH:WSD Enclosure c:
Mr. William T. Russell Mr. Eric J. Leeds Mr. Cornelius F. Holden T
p:
i w.
1' SEN9023.LTR l
,4 9002230464 900131
)
DR ADOCK 0500 9
...~. -.- -.
'n 1
ls
-Maine 9ankee j
l l
l 1
1.
i Monthly Statistical Report For January 1990
y i
I.
i OPERATING DATA REPORT-
-Docket No.s 50-309 Dats:
09/Fe,b/90 Completed By:
S.
L.
HALL Telephone:
207-622-4868
- 1J.JUnit.Name.-......................................
Maine Yankee 2n R: porting Period................................
January 1990 13i Licensed Thermal Power-(MWt)....................
2700' r
4.: Nameplate Rating (Gross MWe)....................
890
'5.
D sign Electrical Rating (Net MWe)..............
840 a
6.' M0xinum Dependable Capacity-(Gross MWe).........
870
.7.-Mnxinun Dependable Capacity (Net MWe)...........
830 8.
If:Chatges in capacity Ratings (Items Number 3-7)
Since Last Report, Give Reasons:
NO CHANGES-9.
Power. Level to Which Restricted, if Any (Net MWe) l10. Reasons for Restrictions, if Any
- i THIS MONTH YEAR-TO-DATE CUMULATIVE
- 11..Hturs In Reporting Period 744.00 744.00_
- 12. Number of Hours-Reactor Was Critical...........
744.00 744.00 121,756.98
- 13. R0 actor Reserve Shutdown-Hours...................
0.00 0.00 0.00
- 14. Hours Generator On-line..
736.90 736.90 118.409.33
- 15. Unit Reserve Shutdown Hours..................
0.00 0.00 0.00 16.-Gross Thermal Energy Generated (MWH)........
1,922.871.00 1,922.871.00 274,135,472.00
- 17. Gross Electrical 1 Energy Generated (MWH)........
647.010.00 647,010.00 89.911.220.00
'18.
Nat Electrical Energy Generated (MWH)........
626,863.00 626,863.00 86,056,743.00 L19.= Unit-Service Factor......
99.05 99.05 78.44 12 0. Unit Availabilty Factor..
99.05 99.05 78.44 21.. Unit Capacity Factor (Using MDC Net)........
101.51 101.51 71.69
- 22. Unit Capacity' Factor
- (Using DER Net)........
100.30 100.30 69.95 12 3. Unit Forced Outage Rate..
0.95 0.95 6.95
- 24. Shutdowns Scheduled Over Next 6 Months:
Date Type Duration 4/07/90 Refuelina 8 weeks
- 25. If Shutdown at End of Report Period, Estimated Date of Startup:
N/A l
t
i I'.
}
c Docket No:
50-309 l
n Unit Name:
Maine. Yankee Date:
02-09-90 Completed By:
S.L.
Hall' Telephone:
207-622-4868
-4 R: port Month: -January, 1990 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCES I
.At1the beginn ng of the month the unit was at 100% power.
t i
L.OniJcnuary 9th, the unit was reduced to 76% power to retrieve dropped 1
j.? rod No. 54.
The unit remained at that power level to perform turbine
'valvo and excess flow check valve testing and circ water box cleaning.
iRTho unit increased in power _and stabilized at 93% while symetric offset incroased to above the lower limit.
The unit was returned to 100% power E on January. loth.
1' l
the unit was manually shutdown to perform stroke test-.
l~0n Jcnuary 15th, l -irg:of the SCC non-cafeguards isolation valve (SCC-A-460) to verify its operability. On January 16th, the unit was returned to power operations.
l On January 17th, the unit was returned to 100% power.
Power was at L 100% for-the remainder of the month.
l l
l l
i l
L 1
s P
l 1
g r
i p
.c
!1 AVERAGE. DAILY UNIT POWER LEVEL FOR' JANUARY 1990
[ 7 Docket-No.:
50-309' Unit:
Maine. Yankee Date:
09/Feb/90 Completed By:
S.
L. HALL D
. Telephone:
207-622-4868 4
Day-Avg. Daily Power. Level Day Avg. Daily Power Level
~
(MWe-Net)
(MWe-Net) 1 865 16 403 1
2 865 17 865 3
86G 18 860 14 864 19=
861
?'\\.5 867 20 863 t
6 864 21 864 17 864 22 863 8
866 23 864 1
9 798 24 863 10:
858 25 863 11 865 26 864 lL 2 '
865 27 864 13 860 28 862 14' 866 29 863 l15 738 30 863 31 863
tp.
UNI'T-SHUTDOWNE'AND POW';R REDUCTIONS DockOt No.: 309
- g; ';
__ FOR=-JANUARY'1990 Unit Maine Yankee
-Date:
09/Feb/90
's Completed By:
.S.
L.
HALL Telephone:
207-622-4868.
Page:
1 of 1 Nu;btr.
L.
R.
to 76%
01-90-11 I
i i
Dato-q 900109 y
900115 q
h-Typn-(1)
F F
.Durction
-(Hours)
O 7.1 t
f h
h Raccon (2)-
A B
fl h
M2thoe (3) 4 1
.c h
LERL#
N/A N/A l
Syctcm Codo (4)
RB WG
'Conponent Codo: (S)
CRDRVE VALVEX-B Power was reduced The unit was to 76% to retrieve manually S/D to dropped rod No.54.
perform stroke The unit remained testing of the Cauco and at 76% power to SCC non-safeguards Corecctive.
perform turbine isolation valve Action valve and EFCV (SCC-A-460) to testing and circ verify its water box clean-operability. 'The ing.
unit was returned to 100%-power.
l '. TYPE:
2.
REASON: (cont) 4.
SYSTEM CODE:
(F)orced F-Administrative Exhibit G-Instructiona
-(S)cheduled-G-Operational Error for Preparation of Data H-Other (Explain)
Entry Sheets for 2.: REASON Licensee Event Report
.A-Equipment Failure 3.
METHOD:
(LER) File (NUREG.0161)
B-Maintenance.or Test 1-Manual
~
C-Rafueling 2-Manual Scram S.
COMPONENT CODE:
D-Rrgulatory Restriction 3-Automatic Scram Exhibit I-Same source E-Operator Training &
4-Other (Explain) as above.
License Examination 4
f W
- +,
6-e e
3 4
1 l
-e
'l b #9 l
l
\\
l y
e**J l
l I
l l
}
- sia l
1 g=e I
g p
e-r-t ex.
l l
a.r
, SE 4
2 --*
- av, l
~ 9%
sN t
LJ t b.
-=-8 LO l
l l
O,2. p m
Cg -
8.a.8 W
J l
i O
[
Qg iQ x
- ry -
1 E E-I l
- eN
^
w l
l 1:
N
,-e I
l l
I 1
CL.e E 'N C
b =
w i
s.
-m.
l l
~ en
- O._s l
\\
.e 3
S LC8
- b. b. (f) W C&,
u
~
W l
l l
4 C
l>
C,3 g
O>
Q 814 >--
t
- N
\\
l i
\\
l i
\\
slLe._.I l
l l
I l
Cs
',, ng; e-o o-a C
l l
\\
l 2 sN G
5%
>w l
as G-I H
gg i a* *e l
I I
a*._*e gg "Ca j
=Z7. T
.w I*
L.
l E
4 ft! >
ein E
I I
l l
l C
'N
- bam, 1
l I
r l
l l
l E
- ~-*
'll l
eIs
' CL.
IA,h l
IJ,.I l
4 1
i Wl; Lt$.... _ _
i4i.p,N l
l l
l
=
L I
l u,
t eN l
l 1 r.-
l
,?
-e E
I I**
Fryg g '
sys" i B iw, a
l
- 3 lC 1
(
(
l 8E I
wp
.q.c nIn aZe Ca CS 525 s~:.,o sin als min eZe als n2s sin mit sin eD axe aZe Cs O
aZe Gs nXe sZa eZe ein eZe op ers
. s'D eis y
eN sin sy>
e.g a
==:0 eN aIp sys sip
--:t-e'.Q O8
- N s'4 KN O.4 w
-=-e
-e w
-e sE ~,> LAI Ct:: C fil La.)
C Z F--
"I"
]
p-
[ '
- NAINE VANVEE DECFCMCE DR90 RAM WO!MGEET Januarv 1090 Actual
, ', PEitF09MANCE DCT4 r
', PericpHours=PH=
744.0'
-f UnitRatirgWNC(Normal)=f-fMWeNet 870.0-rr==~
_ Unit Outage (A) Planned (P) Maintenance I
(C) Forced (D) Extended (E) Reserve i
-Hours-.
- 0. 0
- 0. 0 7.1
- 0. 0
- 0. 0 i
y Planned Outage Start Date I
.Partin:
1 -(F) Unplanned (6) Seasonal (H) Planned 1
Reduction 13 664.0' O. 0 576.0 April 07,1990 l
3 h
1W-hrst L(H) Gross Sen.(MWth)-
O Net Gen. (We) l Fuel Cost 1,922,S71.0 626,863.0 3,320,673.0 J
CALCULATED DATA f
f f
Service Hours = EH = PH - (a+b+c+d+e) =
744.0 7.1
=
736.9 f
.Available Hours = AH = SH + e =
736.9
+
- 0. 0 l=
736.9 f i f 870.0 f=h f
Equivalent Unit 14,240.0 16.4 Derated Hours = EUNDH = (f+k) i rating f
f f
f=l Equivalent Seasonal
- 0. 0 i
870.0
- 0. 0 Derated Hours = ESDH = g i rating =
Thermal KBTV's = h x 3.4128 =
1,922,071.0 x
3.4128
=
6,562,374,290.4 CALCULATED PERFOMANCE FACTORS AVAILABILITY FACTOR = AF = (Availalbe Hours i Period Hours) x 100 =
AF = (AH i PH) X 100 =
736.9 i
744.0 x100=
99.0 EQUIVALENT RiALIBILITY FACTOR = EAF = Available Hours - (Eculvalent Derated Hours + Equivalent Seasona'. Hou*s) x 100 =
Period Hours 736.9 16.4 +
0.0 EAF = AH - (EUNDH + ESDH) x 100 =
x100=
1 96.8
%)
PH i
l 744.0 CAPACITY FACTOR = CF =
Net Generation x 100 =
Period Hours x Unit Rating 626,863.0 l
x100=f CF =
i x 100 =
96.8 PH x Rating 744.0 x
870.0 j
FORCED OUTAGE RATE = FOR =
Forced Outace Hours x 100 =
Forced Outage Hours + Service Hours l
7.1 x100=f
%f FOR =- C x 100 =
- 1. 0 C + EH 7.1
+
736.9 UNIT HEAT RATE = HR = Fuel Eneroy Consumed (MWth) x Conversion (BTU)=
f= f Net Generation (MWe) 6,562,374,290.4 HR = KBTU's 10,468.6 BTU f
626,863.O Prepared by:
Date g
b
MY-NSS-5-89 MAINE YANY.EE MONTH Jnnuary 1990
~
~
~
LOAD REDUCTION TIME DURATION i
l TIME l l TIME
' l l TIME-l TIME l
l TOTAL l l START l % l STAB- -l % l START l STAB-l1 l TIME l
. DAY l DOWN IPWR l-ILI2ED IPWR l UP l ILI2ED IPVR I (HRS) l REASON 1
l l
l l
1
'l I
I I
2 I
I I
I I
I I
I I
-3 I
I I
I I
I I
I I
4 1
1 I
I I
I I
I I
-5 I
I I
I I
I I
I I
-6 I
I I
I I
I
.I I
I 7
l-1 I
i l
i I
I I
-8 I
l I
i l
l l
l l Reduced to 76% power-due h 9
l 1221 ]100I 1331 I 76 l 16001 2300 l 93 l ldropoed rod No. 54. Remained 10 l
l l
l 1 02451 0505
!1001 16.7Iat 76% to perform turbine valvej 11-l I
I l
I l
I l
Iand EFCV testing and cire water; 12 l
l l
l l
l l
l l box cleaning.
The unit then 13 I
l l
l l-1 l
l l stabilized at 93% while s y m_e_t r is 14' l I
I l
1 l
I I
Ioffset Ancreased.
l l.15' l0419 lion l 2131 10 l
l l
l lThe unit was manual.ly S/D to 16 l
l l
l l 0206l l
l l perform stroke testing of the 17 l
l l
l l
l 0015 l1001 39 l SCC non-safeguards isolation 18 l
l l
l l
1 l
l l valve-(SCC-A-460) to verify L _ 19 l
l l
l l
l l
l l its operability.
. 20 I I
I I
I I
I I
i 21 l'
1 I
I I
I I
i 1
h22 I
I I
I I
l l
l 1
23 I
I I
l l
l l
l 1
'24 :I 1
I I
I I
I I
I 25 I
I I
I I
I I
I I
26 I
I I
I I
l l
l 1
27-l l
l l
l l
l l
l l
28 I
I I
I I
I I
I I
4 29' l --
1 I
I l
l l
l l
30 l
l l
l l
l l
l l
l 31 l
l l
l l
1 1
l l
\\
1 10576f
MY-NSS-6-89 January 1990 MONTH OUTAGE & AVAILABILITY TIMES l TIME l TIME I TIME l TIME I TIME TIME l I
RX l RX l RI NOT l RI l UNIT UNIT l DAY l..
REASON l TRIP l CRIT. I AVAIL. l AVAIL. I TRIP l PHASED _]
~1 l
i l
l l
l l
l 2 l l
l 1
l l
l l-3 i l
I l
l l
l 4 I I
I I
I I
I l
S' I
I I
I I
I I
I 6 I I
I I
i 1
I l
7 I
I I
I I
I I
l 8 I I
I I
I I
I l
9 I I
l l
l 1
I l
10 1 I
I I
I I
I l
11 1
I I
I i
i l
l 12 -I I
I I
I I
l 13 ~ l l
1 I
I I
I l
14 I I
I I
I I
I l
=15 l The unit was manually shut l N/Al N/A l N/A 1N/A I21311
__l 16 1 down to perform stroke testingI 1
l l
l l0438 l
17 l of the SCC non-safeguards i
l l
l l
l l
18 I isolation valve (SCC-A-460) l I
I l
l l
l
__19 l to verify its operability.
I I
I l
l l
l 20 ?
I l
l l
l l
l
__21 1
-l I
1 I
I I
22 I
I I
I I
I I
l
~
23 I
I I
I I
I I
l 24 I I
i 1
l i
I l
25 I
I I
I I
I I
l
'26 I
I I
I I
I i
1 27 I
I I
I I
I I
l 28 'l l
I I
I I
I I
29 l
l l
l l
l l
l 30 1 I
1 I
I l
I l
31 I
I I
I I
I I
l 0577f
i
>- 3
b L 11111111111111111111111 11 1111111111111111111 111111111111111111111111111111111111111 '
-=
..- M A l N E--Y A N K E E-A T O M I C.-P O W E R --C O M P A N b- - - - -
WISCASSET, MAINE MONTHLY REPORT FOR JAN. 1990 ELLCIRIC LO G
- M NTH IgAR Tg_DAT f
GR OSS-L L L Cl R.I C-GLN LR A410N-LMWH)
-647010.0--- 7010-.0 89911220.0 STAIION SERVICE ( A UX. TRANS.) (MWH) 275.00 275.00 383945 00 SIA110N SERVICL (S T A. TRANS.) (MWH) 20147.00 20147.00 3854480 00
(
N L4-L L L GTR-l C-GL N LR M-ION--0MWR) 626863.00-- - 626865.-00-86056743.00 ON LINE TIME ( H O UR S) 756.90 736.90 118409 31-SHUL DOWN IIME ( FO UR S )
7 10 7.10 32625 99 P L ANT-C AP ACI4Y h-AC-TO R-0DE&l-GN--NET)
--102.13
-102.-13.
- 70 00 M3JT,M 1[dR.
Ng[20
- PLANT PERFO RM ANCE LOG *-
2 NET PLANT EF F I C I EN CY (PERCENT) 32.600 32.600 31 399 N L LkL AN-bHL A-T-. R AT-t-ObTU / KW H)
-10466.64-10466.64
-1 C B6h 0 2
' LANT THERMAL C APA CITY (PERCENT) 95 722 95.722 69 365 P
REAC10R PLANT AV AI LA BILI T Y (PERCENT) 100.000 100.000 84.960 P L-4+T-A-V A-I L A U4L-14 Y-4PE-RC E N T-3 99.046-99.0-46 TB.444-
- E' NUCLEAR L OG *
$ NTH YEAR T O D A T!,
f GROSS THERMAL ULNLRATION (MWH) 1922871.0 1922871 0 2/4135472.0 1
s.14giu ps
__ _ _ - - _1
- 1_ -
_190 _.
(
l
'HEATUPS 0
0 44
{
l SCRAMS-0 0
111
{
1 COOLDOWhS
-- O O
-- 4 3---
{
l 1
-SHUIDOWNS 1
1 186 j
0 33 1
j A-V E R A G E-COR E--BU R hU P- ( M W D /-T O N )
-9/2 864 972.864- -l1-781.629*
I 1
S. G. 0.--=-V A L-O L-F R O M-T HL-S-T A H-T-OF-CO M M E R C I A L O P E R A T-I O N, -12 / 2 8/1-9-7 2 -- A T- 0 0 0 0 --
- = VALUL FOR IHL PRLSLNT CORL
?
)
1 I II 111 I l l I I 11111111 I I I II II I II I II I II 111 I I I II I I i 1111111 I I I I I I I II I I I I II I I I I I 11 I I I I I 111]
e:
. f4 A I N L [A fiX E L AIUMIC' POWER - DAILY NUMBERS LOG
' DAN. 1990 HWTH : MLGAWA11 IltLRM AL I40 UR S CD
= C00LUDWNS
._RA-:
HLAC10H-AVAILABLE-!IME-
- HU - = - HE A T UPS-FULL LOAD'REdECTIONS 10
- IINL CRITICAL IN HOURS FLR
=
50
= SHU i UOWilS MWTHPC = MLGAWATT THERMAL HOURS i:0R PHLSENT CORE Sif
- 51AHIUPS HUMNPC = BURNUP l-O R PRLSLNT-CORL S
CD HU
'FLR MW1HPC BURNPC EFFHTD-1/ 1/1990 63S83.0 24.0 24.0-0 0
0 0
0 0 -21427160.0 10840 9 - 194199.S' -
1/ 2/1 90 63S9b.0 24 0 24 0 0
0 0
0 0
0 21490755 0 10873 1 104223.1 1/ 3/1990 63S38.0 24.0 24 0 0
0 0
0 0
0 21554293.0 10905.3 104246.6 1/ 4/1990-- 63b4b.0 24.0- - 24.0 0--
0 0
0 0
O.
2161783g n 1893-7-. 4-10 4 2J 0 2-1/ S/1990' 63548 0'
24 0 24 0'
0
'O' O
O O
0: - 21681386 0-110969.6' 104293 71 1/ 6/1490 63b39 0 24.0
-24.0 0
'O O
O O
O 21744925 0 11001.7 104317.2 1/ I/1990 65t68 0 24.D 24.0 0
0 0
--0 0-21808493 0 11033 9-194340.8 1/ H/1"90 63SS2.0 24.0 24.0 0
0 0
0 0
0 21872045.0 11066.0 104364.3 1/ 9/1990 59221.0 24.0 24.0 0
0 0
0 0
0 21931266 0 11096.0 194386 2
-1/10/1990 63029.0 24.0-24.0 0-0 0-- 0
_0 - 21994295.0,14-127 9 - 144409 6-.--
1/11/1990 63598.0 24.0 24 0-0 0
0 0
0 0
22 0 57 893_. 0 ~
11160 1 109433 2' 1/12/1990 63t48 0 24.0 24.0 0
0 0
0 0
0 22121441.0-.11192 2 104456.7 1/13/1990 63534.0 24.0 24 0 0
0 0
0-0 - ~ 0"22184 975 0 11224 3-104480 2-1/14/1990 63505.0 24 0 24 0 0
0 0
0 0
0 22248480 0 11256 5 104b03.7 1/15/1990 54F41.0 24 0 24 0 1
0 0
0 0
0 22303321.0 11284.2 104524 1
-1/16/1990---32468.0 - - 24 0 2 4. 0 -- 1 - --O O
0-22335789 0 1140 0.6-104 536 1~
1/1I/1990 63336.0 24.0 24.0 0
'O O
O O
0 22399125.0 11332 7 104559 5-1/18/1990 63385 0 24.0-24.0 0
0
'0-0 0
0 22462510.0
'11364.8: 104583.0 1/19/1990 63421.0 24.0 24 0-0 0
0 0
0 0-22525931 0 11396 9 104606.5 1/20/1990 63451 0 24.0 24.0 0
0 0
0 0
0 22589382 0 11429 0 104630 0 1/21/1990 634S1.0 24.0 24.0 0
0 0
0 0
0 22652833 0 11461.1 104653.5 1/22/1990 - -63466.0-- - 24.0 24.0 0-
-- 9 0
0 0
0 227-16299.41 114-93. 2---10 4 67-7.-C-1/23/1990 63438 0 24.0 24.0 0
0 0
0 0
'O 2?779737.0~
11525.3~ 104700.5 1/24/1990 63359.9 24.0 24.0 0
0 0
0 0
0 22843096.0 11557 3 104724.0 1/25/1990 63311.0 24.0 24 0 0
0
- 0 - - 0-229 064 07 0-11589.4-104 74 7,4 a 1/26/1990 6332/.0 24.0 24.0 0
0 0
0 0
0 22969734 0 11621 4 104770.9
~
1/2//1990 63339 0 24.0 24 0 0
0 0
0 0
0 ' 23033073.0 11653 4-104794 3
-1/28/1990 63334 0-24 0
-24.0-- ~ 0 -- - 0 --
0-0 - 23096407.0 11685 5 - 19481-7 8 -
1/29/1990 63352.0 24.0 24.0 0
0 0-0 0
'0-
' 23159759 0-11717 5.
104841 2-1/30/1990 63354.0 24 0 24.0 0
0 0
0 0
'O 23223113 0 11749.6 104864 7-1/31/1990 63335.0 24 0 24.0 0
0 0
0 0--
0 - 23286448.0- - 11781 6- -104888 2 -
_g--_g
,g
.ysi yv.e-w gy*
e r"