Amends 48 & 47 to Licenses DPR-80 & DPR-82,respectively, Revising Tech Spec 4.3.1.1,Table 4.3-1,Item 23, Seismic Trip
ML20011E860
Person / Time
Site: Diablo Canyon  
Issue date: 02/06/1990
From: Trammell C
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20011E861 List:
References
NUDOCS 9002220618
Download: ML20011E860 (8)


Text

-

^

~

- l l

f[

  1. g UNITO STATES A,

NUCLEAR REGULATORY COMMISSION l

s 1

namwatow. o. c.aosos k..../

PACIFIC GAS AND ELECTRIC COMPANY l

DIABLO CANYON NUCLEAR POWER PLANT, UNIT 1

-t DOCKET NO. 50-275 l

AMENDMENT TO FACILITY OPERATING LICENSE

-l t

Amendment No.48 License No. DPR-80 i

1.

The Nuclear Regulatory Commission (the Comission) has found that:

A.

The application for amendment by Pacific Gas & Electric Company (thelicensee),datedMarch22andMay 15, 1989, as supplemented by v

letter dated December 26 1989 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's regulations set forth in 10 CFR Chapter I;-

i B.

The facility will operate in conformity with the ap)11 cation, the provisions of the Act, and the regulations of tie Commission; C.

There is reasonable assurance (1) that the activities authorized I

by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

k k

l 4

l-

{

l k?oc?$$$$$f,g PDC

9 s

-2 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-80 is hereby amended to read as follows:

i (2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised k

through Amendment No. 48, are hereby incorporated in the license.

Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.

3.

This license amendment becomes effective at the date of its issuance.

1 FOR THE NUCLEAR REGULATORY COMMISSION b $.

l 44 Charles M. Tranne11 Acting Director Project Directorate V Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: February 6, 1990 l

h l

l

[

UNITED STATES 1 E3.

q NUCLEAR REGULATORY COMMISSION i

L wasMiwoToN, D. C. 20S66 i

9

....+

+

PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON NUCLEAR POWER PLANT. UNIT 2 DOCKET NO. 50-323

_ AMENDMENT TO FACILITY OPERATING LICENSE l

Amendment No. 47 License No. DPR-82 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by. Pacific Gas & Electric Company (the licensee), dated March 22 and May 15, 1989, as supplemented by letter dated December 26 1989 complies with the standards and requirements of the Atomic Enerp Act of 1954, as amended (the Act), and the Comission's regu ations set forth in 10 CFR Chapter I;L B.

The facility will operate in conformity with the ap)11 cation, the provisions of the Act, and the regulations of tie Comission; r

C.

Thereisreasonableassurance(1)thattheactivitiesauthorized by this amendment can be conducted without endangering the health and safety of the public,ith the Comission's regulations; and (ii) that such activities will be conducted in compliance w i

D.

The issuance of this amendment will not be inimical to th? common defense and security or to the health and safety of the public; and L

E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have e

been satisfied.

F:

i l-I

l

\\

2.

Accordingly, the license is amended by changes to the Technical

~

Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-82 is hereby amended to read as follows-(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 47, are hereby incorporated in the license.

Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental i

Protection Plan, except where otherwise stated in specific license conditions.

3.

This license amendment becomes effective at the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION f

$1N.

t Charles M. Trammell,. Acting Director Project Directorate V Division of Reactor Projects - III, IV, Y and Special Projects L

Office of Nuclear Reactor Regulation

Attachment:

i Changes to the Technical t.

Specifications Date of Issuance: February 6, 1990 l

i:

+

e l

}

l L

'i I

ATTACHMENT TO LICENSE.ANENDMENT NOS. 48. AND 47 TACILITY OPERATING LICENSE N05. DPR-80.and.DPR-82 I

DOCKET N05. 50-275 AND 50-323 Replace the following pages of the Appendix 'A" Technical Specifications with the httached pages. The revised pages are identified b contain vertical lines indicating tae areas of change. y Amendment num6er and Overleaf pages are also included, as appropriate.

j Remove Pace fasert. Pace 3/4 3-4 3/4 3-4 3/4 3-7 3/4 3-7 3/4 3-12 3/4 3-12 l

)

n.

J:. ~

~.

l

-TABLE 3.3-1 (Continued) h REACTOR TRIP SYSTEM INSTRUNENTATION o

r>

NININUM E

TOTAL NO.-

CHANNELS CHANNELS APPLICABLE-y FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE NDOES ACTION

[

18. Safety Injection Input z

from ESF 2

1 2

1, 2 10 w*

[

19.

Reactor Coolant Pump Breaker Position Trip above P-7 1/ breaker 2

1/ breaker 1

9 20.

Reactor Trip Breakers 2

1 2

1, 2 10,-12 2

1 2

3*, 4*, 5*

'11

21. Automatic Trip and Interlock 2

1 2

1, 2 10 g

Logic 2

1 2

3*, 4*, 5*

11 i

w 22.

Reactor Trip System Interlocks a.

Intemediate Range Neutron Flux, P-6 2

1 2

2N 8

b.

Low Power Reactor l

Trips Block, P-7 P-10 Input 4

2 3

1 W

P-13 Input 2

1 2

1-M c.

Power Range Neutron Flux, P-8 4

2 3

1 M

d.

Power Range Neutron i

Flux, P-9 4

2 3

1 W-1-

2,.

j j

e.

Power Range Neutron Flux, P-10 4

2 3

1, 2 W

f.

Turbine Impulse Chamber j

{

Pressure, P-13 (Input to P-7) 2 1

2-1 W

4 f

23.

Seismic Trip 3 direc-2/3 loca-2/3 loca-1, 2 13#

l

?

tions (x,y,z) tions one tions all in 3 locations direction directions e.

4 f_3 i

0

t p

TABLE 3.3-1 (Continued)

ACTION STATEMENTS (Continued)

ACTION.9 - With less than the Minimum Number of Channels OPERABLE, operation may continue provided the inoperable channel is placed in the tripped condition within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

ACTION 10 - With the number of channels OPERABLE one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.1.1, provided the other channel is OPERABLE.

ACTION 11 - With the number of OPERABLE channels one less than the Minimum Char.nels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or open the Reactor trip breakers within the next hour.

ACTION 12 - With one of the diverse trip features (Undervoltage or shunt trip attachment) inoperable, restore it to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or declare the breaker inoperable and apply ACTION 10.

The breaker shall not be bypassed while one of the diverse trip features is inoperable except for the time required for performing maintenance to restore the breaker to OPERABLE status.

ACTION 13 With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

The Minimum Channels OPERABLE requirement is met, and a.

b.

The inoperable channel is placed in the tripped conditions within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, the inoperable channel may be bypassed for up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for surveillance testing per Specification 4.3.1.1 or for performing maintenance.

L l

DIABLO CANYON - UNITS 1 & 2 3/4 3-7 Amendment Nos.48 and 47

6, Oi

-TABLE 4.3-1 (Continued);

REACTOR' TRIP SYSTEN INSTRUNENTATION SURVE'ILLANCE REQUIREMENTS g.

TRIP x

ANALOG ACTUATING MDDES FOR 5

CHANNEL-DEVICE WHICH-CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION ' SURVEILLANCE FUNCTIONAL UNIT CHECK _ CALIBRATION TEST TEST LOGIC TEST IS REQUIRED Z

20.

Reactor Trip System Interlocks

[

(Continued) d.

Power Range Neutron Flux, P-9 N.A.

R(4)

R

'N.A.

N. A.

1 e.

Low Setpoint Power Range Neutron Flux, P-10 N.A.

R(4)

R N.A.

N.A.

1, 2 R

f.

Turbine Impulse Chamber Pressure, P-13 N.A.

R R

N.A.

N.A.

1 Y

i l

M 21.

Reactor Trip Breaker N. A.

N.A.

N. A.

M(7,'10)

.N.A.

1, 2, 3*, 4*, 5*

l 22.

Automatic Trip and Interlock N.A.

N.A.

N.A.

N. A.

M(7) 1, 2, 3*, 4*, 5*'

Logic I

23.

Seismic Trip N.A.

R N. A.

R R

1, 2 24.

Reacter Trip Bypass Breaker N.A N.A.

N.A.

M(7,15),R(16)

N.A.

1,2,3*,4*,5*

I a

lit 8

t o

i i

ao.

3

. ~.

....