Responds to Generic Ltr 88-05, Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR Plants. Formal Program to Ensure That Boric Acid Corrosion Does Not Lead to Increase in Abnormal Leakage Implemented
ML20011E132
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/30/1990
From: Creel G
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-88-05, GL-88-5, NUDOCS 9002080116
Download: ML20011E132 (2)


Text

-

V

.,. 4

[

.i BALTIMORE GAS AND ELECTRIC r

?

CHARLES CENTER P.O. BOX 1475. BALTIMORE, MARYLAND 21203 4._

oconoc c:cacct January 30, 1990 Vict PatssotNT Nuctsak cNEROY 000 eso eans

' U. S[ Nuclear Regulatory Commission Washington, DC 20555 r

5 ATTENTICN:

Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Generic Letter 88-05, " Doric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Comnonents in PWR Plants" i

REFERENCES:

(a) Letter from Mr. J. A. Tiernan (BG&E) to Document Control Desk (NRC),- dated May - 20,1988, same subject (b) Letter from Mr. S. A. McNeil (NRC) to Mr. G. C. Creel (BG&E),

dated September 18, 1989, Request for Additional Information Generic Letter 88-05 i

Gentlemen:

Generic Letter 88-05 requested that we provide assurance that a program has been

' implemented consisting of systematic measures to er.sure that boric acid corrosion does not -lead to-an increase in 'the probability of abnormal ' leakage, rtridly propagating 3

failure, : or gross rupture of the - reactor coolant pressure boundary. The generic letter required our initial response to provide assurance that such a program was in place or i'

to provide. a schedule for promptly implementing such a program.

Reference - (a) - was our initial response, it detai%d an informal program we had in place and reported our intention to formalize and fully implement a program that.

[

complies with the generic letter by December 31, 1989. Reference (b) requested that we l'

submit written notification of the full implementation of this program within 30 days

- following implementation.

)

By this letter, we wish to report that a formal program has been implemented that complies with Generic Letter 88-05.

P 0

'O 'i 9002080116 900130 PDR ADOCK 05000317 k

P PDC g g

n.-j; c

( # li Document OIntrol Desk 1

b.

1 3

r i

Janupry. 30,.1990:

5"'

. Pige 2 Should you have. any' further questions. regarding this matter, we.will be pleased to discuss them with. you.

Very truly yours, STATE OF MARYLAND TO WIT '-

')

% % oIfAlnut I hereb ce tify that on the M N u day of bm A > -

, 19

,b re me, the.

u4 'M i

~ subspiber, ha Notary Public of the State of h#ryland in all for

('Ah

, personally appeared George C. Creel, being dufy sworn, and' states that he is Vid President of the Baltimore Gas and Electric Company, a corporation of the State - of Maryland; that he provides the foregoing response for the purposes therein

. set forth; that the statements made are true and correct to the ~ best of his knowledge, information, - and belief; and that he was authorized to provide the ' response on behalf of,said Corporation.

j WITNESS my Hand and Notarial Seal:

k.

libuC

/

otary Public I

l My Commission Expires:

/

. /

y te l

GCC/DLS/bjd i

ec:

D. A. Brune, Esquire i

J.

E.

Silberg, Esquire R. A. Capra, NRC S. A.McNeil NRC W. T. Russell, NRC J. E. Beall, NRC T. Magette, DNR