Forwards Insp Rept 50-285/89-48 on 891012-1130.Violations Noted Re Work Control & post-maint Testing Problems Resulting in Two Component Cooling Water HXs Inoperable for 6 Days.Enforcement Conference Planned on 900105
ML20011D724
Person / Time
Site: Fort Calhoun 
Issue date: 12/18/1989
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Morris K
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20011D725 List:
References
EA-89-246, NUDOCS 8912280323
Download: ML20011D724 (3)


See also: IR 05000285/1989048

Text

_

-_

__-

_ _

_

l

'

..-

..

DEC I 8 529

In Reply Refer To:

Docket: 50-285/89-48

1

'

EA 89-246

i

Omaha Public Power District

ATTN: Mr. Kenneth J. Mot ris, Division Manager

Nuclear Operations

.

'

444 South 16th Street Mall

Omaha, Nebraska 68102-2247

l

Gentlemen:

This refers to the inspection conducted by Mr. P. Harrell of this office during

the period October 12 through November 30, 1989. of activities authorized by

NRC Operating License DPR-40 for the Fort Calhoun Station, and to the

discussion of our findings with you and other members of your staff at the

conclusion of the inspection.

Areas examined during the inspection included review of onsite events. Within

this area, the inspection consisted of selective examination of procedures and

representative records, interviews with personnel, and observations by the

inspector. The inspection findings are documented in the enclosed inspection

,

report.

During this inspection, it was found that certain of your activities were in

6pparent violation of NRC requimments. These concerns involve work control

,

and postnaintenance testing problems' resulting in two component cooling water

heat exchangers being inoperable concurrently for approximately 6 days and a

,

,

I

procedure control issue resulting in your apparent failure to comply with

1

10 CFR 50.59 for determination of an unreviewed safety question involving the

'

issuance of change to a plant procedure. As discussed in our telephone

'

conversation of December 4,1989, with Mr. J. Chase, we have scheduled an

enforcement conference in our office at 10 a.m. on January 5,1990. At this

meeting, we will discuss your understanding of the apparent violations in this

report, the reason for their occurrence, and your corrective actions.

Should you have any questions concerning this inspection, we will be pleased to

,

discuss them with you.

'

Sincerely.

Original Signed By:

Samuel J. Collins

'

Samuel J. Collins, Director

Division of Reactor Projects-

Enclosure:

(seenextpage)

RIV: SRI

DRP/B

C:DRP/B

D:DRP

PHHarrell/nc

RPMullikin

TFWesterman

SJCollins

p/N/89

p/g/89

p/d/89

\\*@/89

f

1

/

\\

0912280323 991218

L

_ _ - . _ _ .gDR

ADocKOS00g5_

_

.

.

_.

.

.