ML20011D724
| ML20011D724 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 12/18/1989 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Morris K OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20011D725 | List: |
| References | |
| EA-89-246, NUDOCS 8912280323 | |
| Download: ML20011D724 (3) | |
See also: IR 05000285/1989048
Text
_
-_
__-
_ _
_
l
'
..-
..
DEC I 8 529
In Reply Refer To:
Docket: 50-285/89-48
1
'
EA 89-246
i
Omaha Public Power District
ATTN: Mr. Kenneth J. Mot ris, Division Manager
Nuclear Operations
.
'
444 South 16th Street Mall
Omaha, Nebraska 68102-2247
l
Gentlemen:
This refers to the inspection conducted by Mr. P. Harrell of this office during
the period October 12 through November 30, 1989. of activities authorized by
NRC Operating License DPR-40 for the Fort Calhoun Station, and to the
discussion of our findings with you and other members of your staff at the
conclusion of the inspection.
Areas examined during the inspection included review of onsite events. Within
this area, the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the
inspector. The inspection findings are documented in the enclosed inspection
,
report.
During this inspection, it was found that certain of your activities were in
6pparent violation of NRC requimments. These concerns involve work control
,
and postnaintenance testing problems' resulting in two component cooling water
heat exchangers being inoperable concurrently for approximately 6 days and a
,
,
I
procedure control issue resulting in your apparent failure to comply with
1
10 CFR 50.59 for determination of an unreviewed safety question involving the
'
issuance of change to a plant procedure. As discussed in our telephone
'
conversation of December 4,1989, with Mr. J. Chase, we have scheduled an
enforcement conference in our office at 10 a.m. on January 5,1990. At this
meeting, we will discuss your understanding of the apparent violations in this
report, the reason for their occurrence, and your corrective actions.
Should you have any questions concerning this inspection, we will be pleased to
,
discuss them with you.
'
Sincerely.
Original Signed By:
Samuel J. Collins
'
Samuel J. Collins, Director
Division of Reactor Projects-
Enclosure:
(seenextpage)
RIV: SRI
DRP/B
C:DRP/B
D:DRP
PHHarrell/nc
RPMullikin
TFWesterman
SJCollins
p/N/89
p/g/89
p/d/89
\\*@/89
f
1
/
\\
0912280323 991218
L
_ _ - . _ _ .gDR
ADocKOS00g5_
_
.
.