Text
p.-
wb DEC 15 W
[
i i
i t
l Mr. Oliver D. Kingsley.. Jr.
Senior Vice Presioent, Nuclear Power Tennessee Valley Authority 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
Dear Mr. Kingsley:
SUBJECT:
MEETING
SUMMARY
- BROWNS FERRY NUCLEAR PLANT, UNIT 2 DOCKET NO. 50-260 R..
This refers to the management meeting conducted at your. request, in the Region II Office on December 4,1989.
This meeting was held to discuss and provide an update on the status of the Browns Ferry operator training and requalification programs.
Also discussed were the status of the corrective actions presented in the September 14, 1989 TVA/NRC management meeting and the upcoming Browns Ferry NRC training inspection for the week of December 18, 1989.
A list of attendees and a copy of your handout describing your corrective actions are enclosed.
It is our opinion that the meeting was beneficial and provided a better i
understanding of the action to be taken by TVA in resolving operator training program concerns prior to Browns Ferry Unit 2 restart.
In accordance with Section 2.790 of NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be place in the NRC Public Document Room.
Should you have any questions concerning these matters, we will be pleased to-discuss them.
Sincerely, Digine.i Sen3d Q' D?.UCE A.WILS3 Bruce A. Wilson, Assistant Director for Inspection Programs TVA Projects Division Office of Nuclear Reactor Regulation i
Enclosures:
(See page 2)
I 8912260140 891215 PDR ADOCK 05000260 y
PDC b:_
DEC 1613e9
.=
Mr. Oliver D. Kingsley, Jr.
2
Enclosures:
1.
Attendence List 2.-
Licensee Handout Material cc w/encls:
F. L. Moreadith, Vice President P. Carier, Site Licensing Manager Nuclear Engineering Browns Ferry Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 400 West Summit Hill Drive P. O. Box 2000 WT 12A 12A Decatur, AL 35602 Knoxville, TN 37902 G. Campbell, Plant Manager Dr. M. D. Medford Browns Ferry Nuclear Plant Vice President and Nuclear Tennessee Valley Authority Technical Director P. O. Box 2000 Tennessee Valley Authority Decatur, AL 35602 6N 38A Lookout Place Chattanooga, TN 37402-2801 TVA Representative Rockville Office Chairman, Limestone County 11921 Rockville Pike Commission Suite 402 P. O. Box 188 Rockville, MD 20852 Athens, AL 35611 General Counsei Dr. Henry Myers, Science Advisor Tennessee Valley Authority Committee on Interior and 400 West Summit Hill Drive Insular Affairs ET 11B 33H U. S. House of Representatives Knoxville, TN 37902 Washington, D. C.
20515 Claude Earl Fox, M.D.
O. J. Zeringue, Site Director State Health Officer Browns Ferry Nuclear Plant State Department of Public Health Tennessee Valley Authority State Office Building i
P. O. Box 2000 Montgomery, AL 36130 Decatur, AL 35602 Manager, Nuclear Licensing bec:
(See page 3) and Regulatory Affairs Tennessee Valley Authority SN 1578 Lookout Place Chattanooga, TN 37402-2801 l
l l
l l
L i
p-j.
DEC 151989
'Mr. Oliver D. Kingsley, Jr.'
4 bec w/encis:
-D. M. Crutchfield, NRR B. D. Liaw, NRR F
S. C. Black, NRR p
R. C. Pierson, NRR G. E. Gears, NRR D. Moran, NRR W. S. Little, NRR/RII A. H. Johnson, NRR/RII J. Rutberg, OGC-M. S. Callahan, GPA/CA NRC Document Control Desk NRC Resident Inspector U S. Nuclear Regulatory Commission Route 12,' Box 637 Athens, AL 35611 l
l l
l l
t i
RII/NRR R
A on:vyg NLitthe 12//3/89 12{y/89
I r
ENCLOSURE 1 LIST OF ATTENDEES 1.
TVA N. C. Kazanas, Vice President, Nuclear Assurance and Services, TVA G. G. Campbell, Plant Manager, Browns Ferry M. E. Herre11, Operations Manager, Browns Ferry, TVA L. B. Durham, Manager - Accredited Training Programs, TVA C. T. Dexter, Manager - Training, Browns Ferry Plant, TVA P. Salas, Compliance Supervisor, Browns Ferry 2.
NCR B. A. Wilson, Assistant Director for Inspection Programs, TVAPD, NRR T. A. Peebles, Branch Chief, Division of Reactor Safety, Region II W. S. Little, Section Chief, Inspection Programs. TVAPD, NRR K. P. Barr, Section Chief, Inspection Programs, TVAPD, NRR P. J. Kellogg, Section Chief, Operations Section, Region II C. A. Casto, Section Chief, Operator Licensing, DRS, Region II A. H. Johnson, Project Engineer, Browns Ferry, TVAPD, NRR R. H. Bernhard, Project Engineer, Browns Ferry, TVAPD, NRR L. Lawyer, Reactor Engineer, Operations Section, Region II B. A. Breslau, Reactor Engineer, Operations Section, Region II G. W. Salyers, Reactor Engineer, Operations Section, Region II P
+
I
'l ENCLOSURE 2 l
y, r
l l
\\
L l'
l TV A-NRC MEETING l
l OPER ATOR TR AINING PROGRAM i
L l
Atlanta, Georgia December 4,1989 t
a
- ~.,..., _..,
,,....,,,,...r-.-.
. _,..,,, _.... ~. _ _.
-,.....__.,_,,.,,...m._
i i
i e
PURPOSE OF MEETING l
Continue with commitment to establish routine l-communications with NRC l
Introduction of.new Nuclear Training Manager and new Browns Ferry Operations Manager Provide update on status of BFN Operator Training Programs Provide status of 1989/1990 BFN Operator Requalification Program Provide status of Corrective Actions presented September 14, 1989 Upcoming BFN NRC Inspection planned for December 18, 1989 l-NC
I g.
f
)
STATUS OF OP OR PROGRAMS Accredited January 1987 Training Assessment Committee (TAC) Corrective Actions in Progress Accreditation Self-Evaluation Report submittal scheduled by January 31, 1990 Accreditation Team Visit requested for Spring of 1990 National Nuclear Accrediting Board Review required last Quarter, 1990 l
l Results of INPO Operating Crew Evaluation i
2-CTD
S'.'ATUS OF 19 90 OPERATOR REOUALIFICATION PROGRAMS June Cycle Changed to meet National Exam Schedule Currently in Week 3 - Delivery 4 Requalification Week 4 begins January 8,1990 Exam Groups 4 and 6 for January 22,1990, and February 5,1990 (Float week)
Annual Cycle Complete June 18, 1990 l'
o L
l i
l 3-CTD
- --.m
____,._.._..,,,,,.,,,,,,,,.,,...,n.,..._,,.
,,,e
,, _,,,,y_,m.,,w.,,_,---.,_,,..g_
,,_.--,...,w,,
.g
\\
STATUS OF COR'tECTIVE ACTIONS PRESENTED INS IP EMBER 14.1990 MEETI3 G Evaluator Deficiencies TVA Evaluator Training Course to be implemented December 4,1989 j
General - Electric independent evaluation December 5 & 6, 1989 Material Adeauncy Problems Written Questions developed subsequent to examination are 100% multiple choice and addressed to areas of work coverage j
h
. Scenarios developed / revised to address adequacy of EOI coverage and SOS /ASOS expectations JPMs reviewed / revised to address time issues, I
initiating and terminating points, IC sets and procedural adequacy K/A Correlation Sample plan in development using time spent, K/A ratings and settings as factors De-selection Process Plant Training Review Board will review / evaluate each candidate prior to the examination Management Overview 1.
Plant Line Management Involvement Upper Level Nuclear Power Management Involvement l
l l
4-CTD l
a 1.7 1
\\
i;.
BFN NRC INSPECTION DECEMBER 18.
1989 INFORMATION PROVIDED TO INSPECTION TEAM i
HLT 8912 Training Schedule.for week of December 18, 1989 HLT 8912 Lesson Plans to be covered week of December 18, 1989 HLT 8905 Training Schedule for week of December 18, 1989 HLT 8905 Lesson Plans to be covered week of December 18, 1989 (Simulator and Classroom)
License Training Schedule for week of December 18, 1989
- Requal Lesson Plans (Simulator and Classroom) to be covered week of December 18, 1989 f
Non-License l
Requal Training Schedule for week of December 18, 1989 1
Lesson Plans to be covered week of December 18, 1989 5-CFD l
.