ML20011B148
| ML20011B148 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 11/18/1981 |
| From: | Puzey A PORTLAND GENERAL ELECTRIC CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20011B144 | List: |
| References | |
| NUDOCS 8112040286 | |
| Download: ML20011B148 (1) | |
Text
._
TROJAN NUCL:.AR PLANT
+
TUNSMITTAL NO.81-003
,s o
j &.,
e
/ \\
'/
Dace 11/18/81 f
A
, k;T*/?^ h w
Copy No. 5 9 - t 3 h
3 4
- 5. ",.
+ 4
'<'M t'
Page 2 of 5 l#1
, /l d.
04.g' ;
ATTN: M9 ROBERT A.
CLARK Qa D
01 RECT 00 0F NUCLEAR QEACTOR PEGULATI i
US NUCLEAR REGULATORY COwMISSION
'~
s/'g;^j 7I
.N n
gaSHINGTON. DC 20SSS FRCM:
A. M. ?uzey Si%'ICT:
Troian Nuclear ?lan: E=ertencv Procedures Inclosed are changes :o your copy of Volume 4, Section 3, of.he Trojan Plan: Operating Manual. *hese pages are to be inser:ad in your ::=ual is accordance vi:h :he 1:strue:1:ns belcw.
Please ackscwledge receip by ccmolecing _he lever perrien of :his ::2:s-
=1::21 and return 1: to :he address indica:ed.
Ecclosure(s)
DIS"RCC'"TCNS TCR CI'iG Remove
~nser-Precedure/? age Revisien
?recedure/? age Revision EP-24 1-11 0
EP-24.1 1-2 0
EP-24.2 1-2 0
E?-24.3 1 of 1 0
EP-24.4 1 of 1 0
I?-24.5 1 of 1 0
EP-24.6 1 of 1 0
EP-24.7 1 of 1 0
EP-24.8 1 of 1 0
I?-24.9 1 ef 1 0
E?-24.10 1 of 1 0
_ _ _ _-24.11_ _ _ _1_of_1_ _
. 0 E?
Copy No. S F - 2 3
'ransmi:ral No.81-003 ACI'iC'AIDGME'.i"'
Page,, or 5 I hereby ackscwledge receipt of the changes to the Tr:jan Plant Operating Manual Imergency ?rocedures Volume 4, Sec:1cn 3.
Signature of Copy Zolder Date R e *ura. To:
OOT Offica Supervisor Trojan Nuclear Plan:
?. C. Zox 139 i
Rainier, OR 97C43
/ /D 8112040286 811130 PDR ADOCK 05000344 F