2CAN108109, Forwards Evaluation of ANO-2 HPSI Pump Operability W/O Water Cooling, Revision 1,per 810715 Commitment
| ML20011A809 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 10/21/1981 |
| From: | Trimble D ARKANSAS POWER & LIGHT CO. |
| To: | Clark R Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20011A810 | List: |
| References | |
| 2CAN108109, NUDOCS 8111030241 | |
| Download: ML20011A809 (1) | |
Text
-
(.
ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK. ARKANSAS 72203 (501)371-4000 October 21, 1981 hib 2CAN108109 g
Director of Nuclear Reactor Regulation
- : kl l)crn r2 j j'h d,.
ATTN: Mr. Robert A. Clark, Chief g.
Operating Reactors Branch #3 N O V 0 2 ;g g y.3 Division of Licensing
" *Ap C,
~
U. S. Nuclear Regulatory Commission V
p Washington, D. C.
20555
SUBJECT:
Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Evaluation of HPSI Operability Without Service Water Cooling Report Revision (File:
2-0510.5)
Gentlemen:
In a conference call on July 15, 1981, AP&L committed to submit a revised report discussing testing and analysis performed to determine the effect of service water flow blockage on the Unit 2 HPSI pump bearings and seal water coolers.
This report has been completed and is attached.
Very truly yours, bY f.
David C. Trimble Manager, Licensing DCT:MCS: sc M
Attachment l
8111030241 811021
/ g, I
g DDRADOCK05000g 9(i MEMBER MOOLE SOUTH UTILITIES SYSTEM