ML20011A472

From kanterella
Jump to navigation Jump to search
Forwards LER 81-084/03L-0
Date released: 01/25/2020 Download: ML20011A472


LER 81-084/03L-0:on 810903,during Power Increase,High Pressure Coolant Injection Delta P Switch Actuated at Level Outside Tech Specs.Caused by Setpoint Drift.Switch Recalibr. Analog Trip Sys Will Be Installed
ML20011A477
Person / Time
Site: Hatch 
Issue date: 10/01/1981
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20011A477 (2)
Forwards LER 81-084/03L-0
ML20011A471
Person / Time
Site: Hatch 
Issue date: 10/01/1981
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20011A471 (1)